Overview
What is the OKI TIP?
OKI’s TIP lists committed transportation improvements in the eight-county OKI region. A new TIP is produced every two years, with each one spanning four years. The TIP is fiscally constrained, meaning total costs must not exceed expected funds available.
Inclusion in the TIP is a requirement for receiving federal transportation funds. The TIP provides a list by county of all federally funded or regionally significant highway and transit projects sponsored by municipal, county, or state governments or transit agencies. The TIP provides an overview of the transportation planning process and how projects are selected through the state DOTs or OKI.
The TIP includes a list of multi-modal transportation projects, such as:
- Improving highways that have recommendations for improving bus service
- Advanced technologies to move traffic more efficiently
- Projects that reduce drive-alone commuting, including ridesharing
- Bicycle and pedestrian projects
- Upgrading highway operating efficiency and projects that improve freight operations
Tip Projects & Amendments
TIP 2024-2027
TIP 2026-2029
effective July 1, 2025
Draft TIP Amendment #1A and #1B are scheduled for adoption by the OKI Board of Directors on June 12, 2025. OKI is accepting comments from the public until 4 p.m. EDT on June 11, 2025. Submit comments to Regina Fields.
Draft FY24-27 TIP Amendment #14
Draft TIP Amendment #14 is scheduled for adoption by the OKI Executive Committee on March 13, 2025. OKI is accepting comments from the public until 4 p.m EST on March 12, 2025. Submit comments to Regina Fields.
FY24-27 TIP Amendment
FY24-27 TIP Modifications
TIP Roadway Projects
PID | State | County | LPA Sponsor | Facility | Location | Description | Project_Type | Award Date | Year | Phase | Fund Type | Amount | Anticipated Award Date |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
103712 | Ohio | Hamilton | KYTC | HAM-71-0.00 - Brent Spence Paint | HAM-71-0.00 | Brent Spence Bridge: Painting Structural SteelApproach Spans: Painting Structural Steel | maintenance/reconstruction | 01/07/2021 | 2021 | CO | State | 7.400.000 | |
103712 | Ohio | Hamilton | KYTC | HAM-71-0.00 - Brent Spence Paint | HAM-71-0.00 | Brent Spence Bridge: Painting Structural SteelApproach Spans: Painting Structural Steel | maintenance/reconstruction | 01/07/2021 | 2021 | CO | Local | 24.600.000 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2018 | RW | Local | 11.000 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2018 | RW | STP | 44.000 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2018 | UT | STP | 41.600 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2018 | UT | State | 10.400 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2020 | CO | STBG | 1.004.080 | |
1383701 | Indiana | Dearborn | INDOT | SR 46 | 2.81 miles west of SR 1 over East Fork of Tanners Creek | Bridge deck replacement | maintenance/reconstruction | 01/07/2021 | 2020 | CO | State | 251.020 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2017 | PE | STP | 160.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2017 | PE | State | 40.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2019 | RW | State | 40.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2019 | RW | STP | 160.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2020 | UT | STBG | 80.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2020 | UT | State | 20.000 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2020 | CO | STBG | 2.419.463 | |
1500092 | Indiana | Dearborn | INDOT | SR 1 | At Guilford | Slide correction project | maintenance/reconstruction | 01/07/2021 | 2020 | CO | State | 604.866 | |
1500129 | Indiana | Dearborn | INDOT | IR 74 | Weigh Station west of the Ohio State Line | Reconstruct the weigh station in West Harrison | maintenance/reconstruction | 01/07/2021 | 2016 | PE | IM | 90.000 | |
1500129 | Indiana | Dearborn | INDOT | IR 74 | Weigh Station west of the Ohio State Line | Reconstruct the weigh station in West Harrison | maintenance/reconstruction | 01/07/2021 | 2016 | PE | State | 10.000 | |
1500129 | Indiana | Dearborn | INDOT | IR 74 | Weigh Station west of the Ohio State Line | Reconstruct the weigh station in West Harrison | maintenance/reconstruction | 01/07/2021 | 2019 | CO | IM | 900.000 | |
1500129 | Indiana | Dearborn | INDOT | IR 74 | Weigh Station west of the Ohio State Line | Reconstruct the weigh station in West Harrison | maintenance/reconstruction | 01/07/2021 | 2019 | CO | State | 100.000 | |
1500550 | Indiana | Dearborn | INDOT | SR 46 | 1.14 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) | maintenance/reconstruction | 01/07/2021 | 2020 | RW | BR | 10.588 | |
1500550 | Indiana | Dearborn | INDOT | SR 46 | 1.14 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) | maintenance/reconstruction | 01/07/2021 | 2020 | RW | State | 2.647 | |
1500550 | Indiana | Dearborn | INDOT | SR 46 | 1.14 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) | maintenance/reconstruction | 01/07/2021 | 2021 | CO | BR | 2.747.892 | |
1500550 | Indiana | Dearborn | INDOT | SR 46 | 1.14 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) | maintenance/reconstruction | 01/07/2021 | 2021 | CO | State | 686.973 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2017 | PE | STP | 140.000 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2017 | PE | State | 35.000 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2020 | RW | STBG | 12.000 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2020 | RW | State | 3.000 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2021 | CO | STBG | 645.870 | |
1500551 | Indiana | Dearborn | INDOT | SR 46 | 1.28 miles east of SR 1 at Logan Creek | Bridge replacement, concrete | bridge/culvert replacement | 01/07/2021 | 2021 | CO | State | 161.468 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2017 | PE | STP | 140.000 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2017 | PE | State | 35.000 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2020 | RW | STBG | 12.000 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2020 | RW | State | 3.000 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2020 | CO | STBG | 602.511 | |
1500552 | Indiana | Dearborn | INDOT | SR 46 | 2.35 miles east of SR 1 at Logan Creek | Bridge replacement (concrete) project | bridge/culvert replacement | 01/07/2021 | 2020 | CO | State | 150.628 | |
1500566 | Indiana | Dearborn | INDOT | US 50 | 0.09 miles east of SR 56 at Hogan Creek | Bridge deck overlay project | maintenance/reconstruction | 01/07/2021 | 2016 | PE | STP | 120.000 | |
1500566 | Indiana | Dearborn | INDOT | US 50 | 0.09 miles east of SR 56 at Hogan Creek | Bridge deck overlay project | maintenance/reconstruction | 01/07/2021 | 2016 | PE | State | 30.000 | |
1500566 | Indiana | Dearborn | INDOT | US 50 | 0.09 miles east of SR 56 at Hogan Creek | Bridge deck overlay project | maintenance/reconstruction | 01/07/2021 | 2021 | CO | BR | 1.420.739 | |
1500566 | Indiana | Dearborn | INDOT | US 50 | 0.09 miles east of SR 56 at Hogan Creek | Bridge deck overlay project | maintenance/reconstruction | 01/07/2021 | 2021 | CO | State | 355.185 | |
1801320 | Indiana | Dearborn | INDOT | US 50 | Seymour District | Guard Rail Attenuators, New or Modernize | traffic operations/safety | 01/07/2021 | 2019 | PE | HSIP | 22.500 | |
1801320 | Indiana | Dearborn | INDOT | US 50 | Seymour District | Guard Rail Attenuators, New or Modernize | traffic operations/safety | 01/07/2021 | 2019 | PE | State | 2.500 | |
1801320 | Indiana | Dearborn | INDOT | US 50 | Seymour District | Guard Rail Attenuators, New or Modernize | traffic operations/safety | 01/07/2021 | 2021 | CO | HSIP | 282.231 | |
1801320 | Indiana | Dearborn | INDOT | US 50 | Seymour District | Guard Rail Attenuators, New or Modernize | traffic operations/safety | 01/07/2021 | 2021 | CO | State | 70.558 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2019 | PE | NHPP | 148.000 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2019 | PE | State | 37.000 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2019 | RW | NHPP | 58.400 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2019 | RW | State | 14.600 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2020 | CO | NHPP | 1.420.624 | |
1801494 | Indiana | Dearborn | INDOT | US 50 | 2500' north of US 50 and SR 1 intersection | Auxilliary lanes, acceleration and deceleration or turn lanes | traffic operations/safety | 01/07/2021 | 2020 | CO | State | 355.161 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2019 | D | OKI-SNK | 498.000 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2020 | D | OKI-SNK | 30.000 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2019 | D | Local | 124.500 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2020 | D | Local | 7.500 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2021 | CO | OKI-SNK | 2.050.921 | |
6-439 | Kentucky | Boone | CVG Airport | Ted Bushelman Boulevard | Along Ted Bushelman Boulevard | Widen to 4 lanes and 2-way left turn lane | traffic operations/safety | 01/07/2021 | 2021 | CO | Local | 608.714 | |
6-80003 | Kentucky | Boone | KYTC | US 42 | US 42 at I-71/75 | Reduce congestion by widening the bridge to provide for sidewalks and extend left turn lane for WB US42 to SB I-71/75 | traffic operations/safety | 01/07/2021 | 2019 | D | CMAQ | 650.000 | |
6-80003 | Kentucky | Boone | KYTC | US 42 | US 42 at I-71/75 | Reduce congestion by widening the bridge to provide for sidewalks and extend left turn lane for WB US42 to SB I-71/75 | traffic operations/safety | 01/07/2021 | 2021 | UT | CMAQ | 100.000 | |
6-80003 | Kentucky | Boone | KYTC | US 42 | US 42 at I-71/75 | Reduce congestion by widening the bridge to provide for sidewalks and extend left turn lane for WB US42 to SB I-71/75 | traffic operations/safety | 01/07/2021 | 2021 | CO | CMAQ | 3.993.000 | |
6-80003 | Kentucky | Boone | KYTC | US 42 | US 42 at I-71/75 | Reduce congestion by widening the bridge to provide for sidewalks and extend left turn lane for WB US42 to SB I-71/75 | traffic operations/safety | 01/07/2021 | 2021 | CO | State | 798.600 | |
107866 | Ohio | Hamilton | Fairfield | HAM Winton Rd/IR 275 Ramp Y | Omniplex Drive south to Ramp Y (WB I-275 on -ramp) | Additional right turn lane from SB Winton onto WB I-275 on-ramp. Dual right turns on ramp. | traffic operations/safety | 12/07/2021 | 2022 | CO | OKI-CMAQ | 581.065 | |
107866 | Ohio | Hamilton | Fairfield | HAM Winton Rd/IR 275 Ramp Y | Omniplex Drive south to Ramp Y (WB I-275 on -ramp) | Additional right turn lane from SB Winton onto WB I-275 on-ramp. Dual right turns on ramp. | traffic operations/safety | 12/07/2021 | 2022 | CO | Local | 294.000 | |
6-3216 | Kentucky | Campbell | Ft. Thomas | North Ft. Thomas Sidewalk | North Fort Thomas Av from Covert Run to Northridge Lane | New 5' sidewalk parallel to N. Ft. Thomas Avenue | bicycle/pedestrian/other | 20/07/2021 | 2018 | D | TAP | 80.000 | |
6-3216 | Kentucky | Campbell | Ft. Thomas | North Ft. Thomas Sidewalk | North Fort Thomas Av from Covert Run to Northridge Lane | New 5' sidewalk parallel to N. Ft. Thomas Avenue | bicycle/pedestrian/other | 20/07/2021 | 2018 | D-SF | TAP | 8.000 | |
6-3216 | Kentucky | Campbell | Ft. Thomas | North Ft. Thomas Sidewalk | North Fort Thomas Av from Covert Run to Northridge Lane | New 5' sidewalk parallel to N. Ft. Thomas Avenue | bicycle/pedestrian/other | 20/07/2021 | 2018 | RW | TAP | 22.000 | |
6-3216 | Kentucky | Campbell | Ft. Thomas | North Ft. Thomas Sidewalk | North Fort Thomas Av from Covert Run to Northridge Lane | New 5' sidewalk parallel to N. Ft. Thomas Avenue | bicycle/pedestrian/other | 20/07/2021 | 2021 | CO | TAP | 541.530 | |
6-407 | Kentucky | Campbell | KYTC | KY 9 | KY 9 at MP 21.8 | Reconstruct railroad underpass (toll credits) | bridge/culvert replacement | 20/07/2021 | 2011 | D | KYD | 651.000 | |
6-407 | Kentucky | Campbell | KYTC | KY 9 | KY 9 at MP 21.8 | Reconstruct railroad underpass (toll credits) | bridge/culvert replacement | 20/07/2021 | 2021 | RW | STBG | 100.000 | |
6-407 | Kentucky | Campbell | KYTC | KY 9 | KY 9 at MP 21.8 | Reconstruct railroad underpass (toll credits) | bridge/culvert replacement | 20/07/2021 | 2021 | UT | STBG | 560.000 | |
6-407 | Kentucky | Campbell | KYTC | KY 9 | KY 9 at MP 21.8 | Reconstruct railroad underpass (toll credits) | bridge/culvert replacement | 20/07/2021 | 2021 | CO | STBG | 2.170.000 | |
6-8706 | Kentucky | Campbell | KYTC | US 27 | MP 17.9 in Pendleton County to MP 1.9 in Campbell County | Reconstruction | maintenance/reconstruction | 20/07/2021 | 2013 | D | SPP | 3.000.000 | |
6-8706 | Kentucky | Campbell | KYTC | US 27 | MP 17.9 in Pendleton County to MP 1.9 in Campbell County | Reconstruction | maintenance/reconstruction | 20/07/2021 | 2017 | RW | SPP | 18.000.000 | |
6-8706 | Kentucky | Campbell | KYTC | US 27 | MP 17.9 in Pendleton County to MP 1.9 in Campbell County | Reconstruction | maintenance/reconstruction | 20/07/2021 | 2017 | UT | SPP | 2.110.000 | |
6-8706 | Kentucky | Campbell | KYTC | US 27 | MP 17.9 in Pendleton County to MP 1.9 in Campbell County | Reconstruction | maintenance/reconstruction | 20/07/2021 | 2020 | CO | SPP | 5.000.000 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2017 | D | TAP | 55.000 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2017 | D | Local | 13.750 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2020 | UT | TAP | 255.000 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2020 | UT | Local | 63.750 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2020 | CO | TAP | 710.000 | |
6-3204 | Kentucky | Kenton | Covington | Electric Alley Pedestrian Improvements | Between 5th and 6th Streets in Covington | Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles | bicycle/pedestrian/other | 27/07/2021 | 2020 | CO | Local | 177.500 | |
6-455 | Kentucky | Kenton | Independence | Cody Road | Banklick Creek to Independence Station Road | Mill and overlay with new asphalt | bridge/culvert replacement | 27/07/2021 | 2020 | D | OKI-SNK | 14.800 | |
6-455 | Kentucky | Kenton | Independence | Cody Road | Banklick Creek to Independence Station Road | Mill and overlay with new asphalt | bridge/culvert replacement | 27/07/2021 | 2020 | D | Local | 4.830 | |
6-455 | Kentucky | Kenton | Independence | Cody Road | Banklick Creek to Independence Station Road | Mill and overlay with new asphalt | bridge/culvert replacement | 27/07/2021 | 2020 | D-SF | OKI-SNK | 4.000 | |
6-455 | Kentucky | Kenton | Independence | Cody Road | Banklick Creek to Independence Station Road | Mill and overlay with new asphalt | bridge/culvert replacement | 27/07/2021 | 2020 | CO | OKI-SNK | 320.243 | |
6-455 | Kentucky | Kenton | Independence | Cody Road | Banklick Creek to Independence Station Road | Mill and overlay with new asphalt | bridge/culvert replacement | 27/07/2021 | 2020 | CO | Local | 80.000 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2021 | PE | State | 10.004.722 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2025 | CO | State | 300.000 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2024 | CO | State | 2.000.000 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2023 | CO | State | 2.000.000 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2021 | CO | State | 87.038.945 | |
104668 | Ohio | Hamilton | ODOT | HAM IR 74 18.01 | From just west of Colerain interchange with I-74 to I-75 | Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB | traffic operations/safety | 05/08/2021 | 2022 | CO | State | 1.000.000 | |
109437 | Ohio | Hamilton | Anderson Township | Paddison Road Sidewalks | Paddison Road from Woodridge Dr to Beechmont | New sidewalks on Paddison Road | bicycle/pedestrian/other | 05/08/2021 | 2022 | CO | OKI-TA | 201.289 | |
109437 | Ohio | Hamilton | Anderson Township | Paddison Road Sidewalks | Paddison Road from Woodridge Dr to Beechmont | New sidewalks on Paddison Road | bicycle/pedestrian/other | 05/08/2021 | 2022 | CO | Local | 104.893 | |
6-162.20 | Kentucky | Kenton | KYTC | KY 536 | West end of NS RR to KY 1303 (Priority Section 1) DES under parent 6-162.01 | Improve safety and reduce congestion-widenening to 2 lanes each direction with center turn lane | widening/relocation | 08/10/2021 | 2019 | UT | STP | 1.210.000 | |
6-162.20 | Kentucky | Kenton | KYTC | KY 536 | West end of NS RR to KY 1303 (Priority Section 1) DES under parent 6-162.01 | Improve safety and reduce congestion-widenening to 2 lanes each direction with center turn lane | widening/relocation | 08/10/2021 | 2021 | CO | STBG | 9.000.000 | |
6-162.20 | Kentucky | Kenton | KYTC | KY 536 | West end of NS RR to KY 1303 (Priority Section 1) DES under parent 6-162.01 | Improve safety and reduce congestion-widenening to 2 lanes each direction with center turn lane | widening/relocation | 08/10/2021 | 2021 | CO | State | 2.250.000 | |
1801755 | Indiana | Dearborn | City of Greendale | Greendale Trail #01 | City of Greendale | 1.01 mile of 12' wide asphalt trail, boardwalk, and crosswalk enhancements with drinking fountain, benches, bike racks and signage | bicycle/pedestrian/other | 01/11/2021 | 2020 | PE | Rec Trails | 14.920 | |
1801755 | Indiana | Dearborn | City of Greendale | Greendale Trail #01 | City of Greendale | 1.01 mile of 12' wide asphalt trail, boardwalk, and crosswalk enhancements with drinking fountain, benches, bike racks and signage | bicycle/pedestrian/other | 01/11/2021 | 2020 | PE | Local | 3.730 | |
1801755 | Indiana | Dearborn | City of Greendale | Greendale Trail #01 | City of Greendale | 1.01 mile of 12' wide asphalt trail, boardwalk, and crosswalk enhancements with drinking fountain, benches, bike racks and signage | bicycle/pedestrian/other | 01/11/2021 | 2020 | CO | Rec Trails | 177.080 | |
1801755 | Indiana | Dearborn | City of Greendale | Greendale Trail #01 | City of Greendale | 1.01 mile of 12' wide asphalt trail, boardwalk, and crosswalk enhancements with drinking fountain, benches, bike racks and signage | bicycle/pedestrian/other | 01/11/2021 | 2020 | CO | Local | 44.270 | |
113302 | Ohio | Butler | Hamilton | Hamilton ITS/Traffic Signal Upgrade | Throughout the City of Hamilton | Installation of a central based signal system for the City's 94 traffic signals, upgraded controllers and detection and improved communication between traffic signals using fiber optic cable | traffic operations/safety | 04/11/2021 | 2022 | CO | OKI-STBG | 4.180.165 | |
113302 | Ohio | Butler | Hamilton | Hamilton ITS/Traffic Signal Upgrade | Throughout the City of Hamilton | Installation of a central based signal system for the City's 94 traffic signals, upgraded controllers and detection and improved communication between traffic signals using fiber optic cable | traffic operations/safety | 04/11/2021 | 2022 | CO | Local | 1.155.241 | |
6-17.09 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge--MP 191.277 to 191.777 | Brent Spence Bridge Project (additional project funds for maintenance repair and painting) | maintenance/reconstruction | 24/11/2021 | 2021 | CO | NHPP | 12.000.000 | |
6-17.09 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge--MP 191.277 to 191.777 | Brent Spence Bridge Project (additional project funds for maintenance repair and painting) | maintenance/reconstruction | 24/11/2021 | 2022 | CO | NHPP | 12.000.000 | |
6-17.09 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge--MP 191.277 to 191.777 | Brent Spence Bridge Project (additional project funds for maintenance repair and painting) | maintenance/reconstruction | 24/11/2021 | 2021 | CO | State | 3.000.000 | |
6-17.09 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge--MP 191.277 to 191.777 | Brent Spence Bridge Project (additional project funds for maintenance repair and painting) | maintenance/reconstruction | 24/11/2021 | 2022 | CO | State | 3.000.000 | |
6-3209 | Kentucky | Kenton | Covington | Riverfront Commons Highway Avenue Connection | West of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington | Construct a multi-use path | bicycle/pedestrian/other | 24/11/2021 | 2019 | D | TAP | 105.000 | |
6-3209 | Kentucky | Kenton | Covington | Riverfront Commons Highway Avenue Connection | West of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington | Construct a multi-use path | bicycle/pedestrian/other | 24/11/2021 | 2019 | D | Local | 25.000 | |
6-3209 | Kentucky | Kenton | Covington | Riverfront Commons Highway Avenue Connection | West of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington | Construct a multi-use path | bicycle/pedestrian/other | 24/11/2021 | 2020 | CO | TAP | 880.000 | |
6-3209 | Kentucky | Kenton | Covington | Riverfront Commons Highway Avenue Connection | West of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington | Construct a multi-use path | bicycle/pedestrian/other | 24/11/2021 | 2020 | CO | Local | 220.000 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2018 | D | SRTS | 87.000 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2019 | RW | SRTS | 75.000 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2021 | CO | SRTS | 20.000 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2021 | CO | OKI-TA | 118.400 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2021 | CO | Local | 29.600 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2021 | CO | TAP | 252.720 | |
6-3505 | Kentucky | Campbell | Dayton | Dayton Safe Routes to School | Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. | Connect north and south Dayton by constructing new sidewalks and new roadway markings | bicycle/pedestrian/other | 24/11/2021 | 2021 | CO | Local | 63.180 | |
6-8307.10 | Kentucky | Kenton | KYTC | KY 1501 | From KY 17 to Crystal Lake Drive | Relocate Hands Pike | maintenance/reconstruction | 24/11/2021 | 2021 | CO | STP | 6.408.000 | |
6-8307.10 | Kentucky | Kenton | KYTC | KY 1501 | From KY 17 to Crystal Lake Drive | Relocate Hands Pike | maintenance/reconstruction | 24/11/2021 | 2021 | CO | State | 1.602.000 | |
106129 | Ohio | Butler | Butler County | BUT Five Points Roundabout | Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley | Improve the five road intersection by converting to a roundabout | traffic operations/safety | 03/12/2021 | 2021 | RW | OKI-STBG | 720.000 | |
106129 | Ohio | Butler | Butler County | BUT Five Points Roundabout | Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley | Improve the five road intersection by converting to a roundabout | traffic operations/safety | 03/12/2021 | 2021 | RW | Local | 180.000 | |
106129 | Ohio | Butler | Butler County | BUT Five Points Roundabout | Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley | Improve the five road intersection by converting to a roundabout | traffic operations/safety | 03/12/2021 | 2022 | CO | OKI-STBG | 1.390.504 | |
106129 | Ohio | Butler | Butler County | BUT Five Points Roundabout | Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley | Improve the five road intersection by converting to a roundabout | traffic operations/safety | 03/12/2021 | 2022 | CO | OKI-TA | 52.096 | |
106129 | Ohio | Butler | Butler County | BUT Five Points Roundabout | Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley | Improve the five road intersection by converting to a roundabout | traffic operations/safety | 03/12/2021 | 2022 | CO | Local | 1.376.334 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2019 | RW | Federal TRAC | 4.016.000 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2019 | RW | State TRAC | 1.004.000 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2019 | RW | State | 13.815 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CO | HSIP | 2.741.945 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CO | CRRSSA | 31.175.558 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CO | State | 304.661 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CE | HSIP | 191.936 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CE | CRRSSA | 2.182.282 | |
103954 | Ohio | Clermont | ODOT | CLE 32-3.50 | near intersection with Bach Buxton Road | Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). | widening/relocation | 09/12/2021 | 2022 | CE | State | 21.326 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2018 | PE | State | 34.136 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2024 | RW | OKI-STBG | 300.400 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2020 | RW | Local | 350.000 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2022 | CO | OKI-STBG | 3.600.400 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2022 | CO | Local | 1.235.473 | |
105162 | Ohio | Hamilton | Cincinnati | Auburn Avenue | Dorchester Av to Gilman Av | Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. | traffic operations/safety | 30/12/2021 | 2022 | CE | Local | 338.511 | |
6-440 | Kentucky | Boone | Boone County | KY 237 Multi-modal path | Stephens Elementary School north to KY 20/Petersburg Road | Construct a multi-modal path | bicycle/pedestrian/other | 11/01/2022 | 2017 | D | OKI-SNK | 267.960 | |
6-440 | Kentucky | Boone | Boone County | KY 237 Multi-modal path | Stephens Elementary School north to KY 20/Petersburg Road | Construct a multi-modal path | bicycle/pedestrian/other | 11/01/2022 | 2017 | D | Local | 66.990 | |
6-440 | Kentucky | Boone | Boone County | KY 237 Multi-modal path | Stephens Elementary School north to KY 20/Petersburg Road | Construct a multi-modal path | bicycle/pedestrian/other | 11/01/2022 | 2021 | CO | OKI-SNK | 1.589.937 | |
6-440 | Kentucky | Boone | Boone County | KY 237 Multi-modal path | Stephens Elementary School north to KY 20/Petersburg Road | Construct a multi-modal path | bicycle/pedestrian/other | 11/01/2022 | 2021 | CO | Local | 446.600 | |
109704 | Ohio | Hamilton | Springdale | Crescentville Road | Between Transportation Way and Centerdale Road | Widening of Crescentville Rd to provide a two-way left turn lane, additional of new traffic signal at Chesterdale, addition of curb and gutter and storm sewer system to improve drainage | traffic operations/safety | 20/01/2022 | 2022 | CO | OKI-STBG | 3.275.970 | |
109704 | Ohio | Hamilton | Springdale | Crescentville Road | Between Transportation Way and Centerdale Road | Widening of Crescentville Rd to provide a two-way left turn lane, additional of new traffic signal at Chesterdale, addition of curb and gutter and storm sewer system to improve drainage | traffic operations/safety | 20/01/2022 | 2022 | CO | Local | 2.479.575 | |
107302 | Ohio | Warren | Mason | WAR US 42 Roundabouts | Intersections at Bethany Road and Mason-Morrow-Millgrove Road | Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path. | traffic operations/safety | 25/01/2022 | 2021 | RW | OKI-CMAQ | 200.000 | |
107302 | Ohio | Warren | Mason | WAR US 42 Roundabouts | Intersections at Bethany Road and Mason-Morrow-Millgrove Road | Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path. | traffic operations/safety | 25/01/2022 | 2021 | RW | Local | 50.000 | |
107302 | Ohio | Warren | Mason | WAR US 42 Roundabouts | Intersections at Bethany Road and Mason-Morrow-Millgrove Road | Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path. | traffic operations/safety | 25/01/2022 | 2022 | CO | OKI-CMAQ | 2.826.689 | |
107302 | Ohio | Warren | Mason | WAR US 42 Roundabouts | Intersections at Bethany Road and Mason-Morrow-Millgrove Road | Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path. | traffic operations/safety | 25/01/2022 | 2022 | CO | Local | 1.852.745 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2021 | PE-RWS | STBG | 48.174 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2021 | PE-RWS | Local | 12.044 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2021 | RW | OKI-STBG | 166.250 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2022 | RW | OKI-STBG | 166.250 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2021 | RW | Local | 142.500 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2022 | CO | OKI-STBG | 5.937.500 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2022 | CO | STBG | 5.000.000 | |
106724 | Ohio | Warren | Warren County | King Avenue Bridge | From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av | Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT. | bridge/culvert replacement | 02/02/2022 | 2022 | CO | Local | 9.482.621 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2020 | RW | Federal Major New | 2.000.000 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2020 | RW | State Funds | 500.000 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2022 | CO | Federal Major New | 1.600.000 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2022 | CO | State | 400.000 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2022 | CO | Federal Labor | 112.000 | |
103959 | Ohio | Clermont | ODOT | CLE 32-2.88 | EB 32 ramp to Clepper Lane | Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370. | widening/relocation | 03/02/2022 | 2022 | CO | State | 28.000 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2019 | PE | Local | 4.300 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2024 | CO | OKI-TA | 8.118 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2023 | CO | OKI-TA | 25.724 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2022 | CO | OKI-TA | 1.153.412 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2022 | CE | OKI-TA | 46.858 | |
109757 | Ohio | Butler | Butler County Metro Parks | BUT M2M Trail Extension | Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail | Construction of Multi Use Path through Gilmore Ponds Preserve MetroPark, to extend the Miam 2 Miami Regional Trail | bicycle/pedestrian/other | 14/02/2022 | 2022 | CO | Local | 759.647 | |
6-82 | Kentucky | Kenton | KYTC | IR 75 | I-71/I-75 NB entrance ramps from Pike Street and 4th Street (TDC match) | Increase safety for I-75 NB lanes at entrance ramps coming from Pike St.and 4th St. Eliminate ramp at 4th St. with new access via collector distributer, extend I-75 4 lanes from Pike St. ramp. | traffic operations/safety | 22/02/2022 | 2020 | D | CMAQ | 600.000 | |
6-82 | Kentucky | Kenton | KYTC | IR 75 | I-71/I-75 NB entrance ramps from Pike Street and 4th Street (TDC match) | Increase safety for I-75 NB lanes at entrance ramps coming from Pike St.and 4th St. Eliminate ramp at 4th St. with new access via collector distributer, extend I-75 4 lanes from Pike St. ramp. | traffic operations/safety | 22/02/2022 | 2020 | UT | CMAQ | 100.000 | |
6-82 | Kentucky | Kenton | KYTC | IR 75 | I-71/I-75 NB entrance ramps from Pike Street and 4th Street (TDC match) | Increase safety for I-75 NB lanes at entrance ramps coming from Pike St.and 4th St. Eliminate ramp at 4th St. with new access via collector distributer, extend I-75 4 lanes from Pike St. ramp. | traffic operations/safety | 22/02/2022 | 2021 | CO | CMAQ | 3.920.000 | |
6-82 | Kentucky | Kenton | KYTC | IR 75 | I-71/I-75 NB entrance ramps from Pike Street and 4th Street (TDC match) | Increase safety for I-75 NB lanes at entrance ramps coming from Pike St.and 4th St. Eliminate ramp at 4th St. with new access via collector distributer, extend I-75 4 lanes from Pike St. ramp. | traffic operations/safety | 22/02/2022 | 2021 | CO | State | 980.000 | |
109468 | Ohio | Butler | Middletown | Central Avenue | Between Verity Parkway and University Boulevard | Reconstruction with upgraded pavement, curb, storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks. | maintenance/reconstruction | 01/03/2022 | 2022 | CO | OKI-STBG | 4.603.874 | |
109468 | Ohio | Butler | Middletown | Central Avenue | Between Verity Parkway and University Boulevard | Reconstruction with upgraded pavement, curb, storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks. | maintenance/reconstruction | 01/03/2022 | 2022 | CO | Local | 2.479.009 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2019 | PE-Env | Federal (Pres) | 274.546 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2019 | PE-Env | Federal (Labor) | 113.152 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2019 | PE-Env | State | 96.925 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2021 | PE-DD | Federal Preservation | 41.057 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2021 | PE-DD | State | 35.224 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CO | STBG | 1.930.821 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CO | State | 482.705 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2024 | CO | OKI-CMAQ | 38 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CO | OKI-CMAQ | 919.776 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CO | Local | 221.653 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CE | Federal | 173.347 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CE | State | 33.789 | |
100816 | Ohio | Warren | ODOT | Countryside YMCA Trail Extension | Bridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd. | Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48. | bicycle/pedestrian/other | 17/03/2022 | 2022 | CE | Local | 39.390 | |
111520 | Ohio | Hamilton | Springdale | HAM Springdale Signal Upgrades | SR 747, Kemper, SR 4 and Crescentville Rd | Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections. | maintenance/reconstruction | 17/03/2022 | 2022 | CO | OKI-STBG | 545.450 | |
111520 | Ohio | Hamilton | Springdale | HAM Springdale Signal Upgrades | SR 747, Kemper, SR 4 and Crescentville Rd | Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections. | maintenance/reconstruction | 17/03/2022 | 2023 | CO | OKI-STBG | 33.108 | |
111520 | Ohio | Hamilton | Springdale | HAM Springdale Signal Upgrades | SR 747, Kemper, SR 4 and Crescentville Rd | Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections. | maintenance/reconstruction | 17/03/2022 | 2024 | CO | OKI-STBG | 3.780 | |
111520 | Ohio | Hamilton | Springdale | HAM Springdale Signal Upgrades | SR 747, Kemper, SR 4 and Crescentville Rd | Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections. | maintenance/reconstruction | 17/03/2022 | 2022 | CO | Local | 145.585 | |
111520 | Ohio | Hamilton | Springdale | HAM Springdale Signal Upgrades | SR 747, Kemper, SR 4 and Crescentville Rd | Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections. | maintenance/reconstruction | 17/03/2022 | 2022 | CO | Local | 62.149 | |
113783 | Ohio | Butler | West Chester Twp | Smith Road Connector Trail | Trail from the roundabout at Smith Road and Becket Road to the existing trails on Smith Road | Multi Use Trail from Smith Road/Becket road to Smith Road | bicycle/pedestrian/other | 04/04/2022 | 2023 | CO | OKI-TA | 22.982 | |
113783 | Ohio | Butler | West Chester Twp | Smith Road Connector Trail | Trail from the roundabout at Smith Road and Becket Road to the existing trails on Smith Road | Multi Use Trail from Smith Road/Becket road to Smith Road | bicycle/pedestrian/other | 04/04/2022 | 2022 | CO | OKI-TA | 413.446 | |
113783 | Ohio | Butler | West Chester Twp | Smith Road Connector Trail | Trail from the roundabout at Smith Road and Becket Road to the existing trails on Smith Road | Multi Use Trail from Smith Road/Becket road to Smith Road | bicycle/pedestrian/other | 04/04/2022 | 2022 | CO | Local | 232.330 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2016 | D | OKI-SNK | 250.000 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2019 | RW | OKI-SNK | 230.000 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2020 | RW | Local | 50.000 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2020 | UT | OKI-SNK | 32.068 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2020 | UT | Local | 30.000 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2022 | CO | OKI-SNK | 1.226.820 | |
6-423 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | 900' either direction of intersection with Triple Crown | Correct vertical and horizontal curves. Toll credits for DES phase | traffic operations/safety | 10/05/2022 | 2022 | CO | Local | 300.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | D | STBG | 776.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | D | State | 194.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | RW | STBG | 3.040.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | RW | State | 760.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | UT | STBG | 600.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2021 | UT | State | 150.000 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2022 | CO | STBG | 6.414.936 | |
6-445 | Kentucky | Boone | KYTC | KY 3076 (Mineola Pike) | I-275 to KY 236 (Donaldson Rd.) | Widen to 2 lanes each direction with center turn lane | widening/relocation | 10/05/2022 | 2022 | CO | State | 1.603.734 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2020 | PE-ENV | HSIP | 137.700 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2020 | PE-ENV | Local | 15.300 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2021 | PE-DD | HSIP | 18.068 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2021 | PE-DD | Local | 2.008 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2021 | RW | HSIP | 50.310 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2021 | RW | Local | 138.820 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2022 | CO | OKI-CMAQ | 893.575 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2022 | CO | Local | 1.205.368 | |
107130 | Ohio | Hamilton | Montgomery | HAM CR 284 1.33 Pfeiffer Road | Intersection of Pfeiffer Road and Deerfield Road | Construct roundabout | traffic operations/safety | 01/06/2022 | 2022 | CO | State | 400.000 | |
108014 | Ohio | Hamilton | Cincinnati | HAM US 50 8.43 Thornton Ave | Thornton Av from Forbes Rd across the RR and River Road (US 50) | Bike/ped crossing along south side of Thornton Av, across River Rd and RR tracks to Fernbank Park | bicycle/pedestrian/other | 01/06/2022 | 2022 | CO | OKI-CMAQ | 990.428 | |
108014 | Ohio | Hamilton | Cincinnati | HAM US 50 8.43 Thornton Ave | Thornton Av from Forbes Rd across the RR and River Road (US 50) | Bike/ped crossing along south side of Thornton Av, across River Rd and RR tracks to Fernbank Park | bicycle/pedestrian/other | 01/06/2022 | 2024 | CO | OKI-CMAQ | 25.367 | |
108014 | Ohio | Hamilton | Cincinnati | HAM US 50 8.43 Thornton Ave | Thornton Av from Forbes Rd across the RR and River Road (US 50) | Bike/ped crossing along south side of Thornton Av, across River Rd and RR tracks to Fernbank Park | bicycle/pedestrian/other | 01/06/2022 | 2025 | CO | OKI-CMAQ | 433.127 | |
108014 | Ohio | Hamilton | Cincinnati | HAM US 50 8.43 Thornton Ave | Thornton Av from Forbes Rd across the RR and River Road (US 50) | Bike/ped crossing along south side of Thornton Av, across River Rd and RR tracks to Fernbank Park | bicycle/pedestrian/other | 01/06/2022 | 2022 | CO | Local | 326.137 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2021 | PE-RWS | Local | 3.000 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2021 | RW | OKI-CMAQ | 26.416 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | RW | OKI-CMAQ | 19.139 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2021 | RW | Local | 20.000 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | CO | OKI-CMAQ | 1.331.146 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2024 | CO | OKI-CMAQ | 7.279 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | CO | Local | 379.423 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | CO | STBG | 480.000 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | CO | State | 120.000 | |
107301 | Ohio | Hamilton | Silverton | HAM US 22/SR 3 9.66 Silverton | US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. | Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. | traffic operations/safety | 03/06/2022 | 2022 | CE | Local | 26.560 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2022 | PE | Local Bridge | 80.217 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2020 | PE | Local Bridge | 80.217 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2021 | PE | Local Bridge | 80.217 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2020 | PE | Local | 20.054 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2021 | PE | Local | 20.054 | |
1500202 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Dearborn County | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 01/07/2022 | 2022 | PE | Local | 20.054 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2019 | PE | STP | 80.000 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2019 | PE | State | 20.000 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2021 | RW | STBG | 16.000 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2021 | RW | State | 4.000 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2022 | CO | STBG | 144.221 | |
1700136 | Indiana | Dearborn | INDOT | SR 1 | Intersection of SR 1 and Oberting Road | New Signal Installation | traffic operations/safety | 01/07/2022 | 2022 | CO | State | 36.055 | |
1800225 | Indiana | Dearborn | INDOT | US 50 | At the intersection of Front Street in Dillsboro | Intersection improvement with added turn lanes | traffic operations/safety | 01/07/2022 | 2019 | PE | NHPP | 100.000 | |
1800225 | Indiana | Dearborn | INDOT | US 50 | At the intersection of Front Street in Dillsboro | Intersection improvement with added turn lanes | traffic operations/safety | 01/07/2022 | 2019 | PE | State | 25.000 | |
1800225 | Indiana | Dearborn | INDOT | US 50 | At the intersection of Front Street in Dillsboro | Intersection improvement with added turn lanes | traffic operations/safety | 01/07/2022 | 2023 | CO | NHPP | 2.168.767 | |
1800225 | Indiana | Dearborn | INDOT | US 50 | At the intersection of Front Street in Dillsboro | Intersection improvement with added turn lanes | traffic operations/safety | 01/07/2022 | 2023 | CO | State | 542.192 | |
1801685 | Indiana | Dearborn | INDOT | SR 1 | 3.6 miles south of I-74 | Slide correction | maintenance/reconstruction | 01/07/2022 | 2019 | PE | STP | 80.000 | |
1801685 | Indiana | Dearborn | INDOT | SR 1 | 3.6 miles south of I-74 | Slide correction | maintenance/reconstruction | 01/07/2022 | 2019 | PE | State | 20.000 | |
1801685 | Indiana | Dearborn | INDOT | SR 1 | 3.6 miles south of I-74 | Slide correction | maintenance/reconstruction | 01/07/2022 | 2023 | CO | STBG | 980.166 | |
1801685 | Indiana | Dearborn | INDOT | SR 1 | 3.6 miles south of I-74 | Slide correction | maintenance/reconstruction | 01/07/2022 | 2023 | CO | State | 245.042 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2018 | PE | Local | 197.000 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2021 | RW | Local Bridge | 86.032 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2021 | RW | Local | 21.508 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2023 | UT | Local Bridge | 32.852 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2023 | UT | Local | 8.213 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2023 | CO | Local Bridge | 2.760.000 | |
1600719 | Indiana | Dearborn | Dearborn County | Harrison Brookville Road (Old US 52) | Bridge #108 at Johnson Fork Creek | Bridge replacement | bridge/culvert replacement | 23/09/2022 | 2023 | CO | Local | 690.000 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2019 | PE | STBG | 219.520 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2019 | PE | Local | 61.880 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2022 | RW | STBG | 40.000 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2022 | RW | Local | 10.000 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2023 | CO | STBG | 1.480.000 | |
1702959 | Indiana | Dearborn | Dearborn County | IR 1026 | Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill | Slide Correction | maintenance/reconstruction | 23/11/2022 | 2023 | CO | Local | 370.000 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2020 | PE | State | 20.132 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2021 | RW | Federal - Major New | 600.000 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2021 | RW | State - Major New | 150.000 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2021 | RW | State - Labor | 5.181 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2023 | CO | STBG | 3.725.157 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2023 | CO | State | 931.289 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2023 | CO | STBG | 260.761 | |
103955 | Ohio | Clermont | ODOT | CLE CR 171 (Old SR74) | Old SR 74 Schoolhouse to SR 32 | Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370. | widening/relocation | 08/12/2022 | 2023 | CO | State | 65.190 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | D | STBG | 1.130.000 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | D | State | 282.500 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | RW | STBG | 600.000 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | RW | State | 150.000 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | UT | STBG | 1.000.000 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2021 | UT | State | 250.000 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2023 | CO | STBG | 12.634.406 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2023 | CO | CRRSAA | 3.128.606 | |
6-444 | Kentucky | Boone | KYTC | KY 236 (Donaldson Road) | Between Houston Road (KY 842) and Mineola Pike (KY 3076) | Major widening to 2 lanes each direction | widening/relocation | 16/12/2022 | 2023 | CO | State | 3.940.753 | |
1297183 | Indiana | Dearborn | INDOT | State Line Road | Intersection of US 50 and State Line Road in Greendale | Intersection improvement with added turn lanes | traffic operations/safety | 10/02/2023 | 2023 | CO | OKI-CMAQ | 192.000 | |
1297183 | Indiana | Dearborn | INDOT | State Line Road | Intersection of US 50 and State Line Road in Greendale | Intersection improvement with added turn lanes | traffic operations/safety | 10/02/2023 | 2023 | CO | NHPP | 831.762 | |
1297183 | Indiana | Dearborn | INDOT | State Line Road | Intersection of US 50 and State Line Road in Greendale | Intersection improvement with added turn lanes | traffic operations/safety | 10/02/2023 | 2023 | CO | State | 207.941 | |
1297183 | Indiana | Dearborn | INDOT | State Line Road | Intersection of US 50 and State Line Road in Greendale | Intersection improvement with added turn lanes | traffic operations/safety | 10/02/2023 | 2023 | CO | Federal-Ohio | 204.200 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2018 | PE | STP | 50.000 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2019 | PE | STP | 298.359 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2018 | PE | Local | 12.500 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2019 | PE | Local | 74.590 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2021 | RW | OKI-STBG | 120.000 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2021 | RW | Local | 30.000 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2022 | UT | OKI-STBG | 65.506 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2022 | UT | Local | 16.377 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2023 | CO | STBG (Group IV) | 4.606.181 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2023 | CO | OKI-STBG | 225.175 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2023 | CO | OKI-CRRSAA | 92.102 | |
1600706 | Indiana | Dearborn | City of Aurora | Market Street | 5th Street to Dutch Hollow Road in Aurora | Road reconstruction, minor realignment, slope corrections and elimination of roadway hazards. | maintenance/reconstruction | 10/02/2023 | 2023 | CO | Local | 1.203.409 | |
117230 | Ohio | Hamilton | City of Cincinnati | HAM Western Hills Viaduct-Chem Pack Demolition | Chem Pack (2261 Spring Grove Avenue, Cincinnati, OH 45214) | Demolition of the Chem Pack building at 2261 Spring Grove Avenue | bridge/culvert replacement | 23/02/2023 | 2023 | CO | OKI-STBG | 1.989.122 | |
117230 | Ohio | Hamilton | City of Cincinnati | HAM Western Hills Viaduct-Chem Pack Demolition | Chem Pack (2261 Spring Grove Avenue, Cincinnati, OH 45214) | Demolition of the Chem Pack building at 2261 Spring Grove Avenue | bridge/culvert replacement | 23/02/2023 | 2023 | CO | Local | 520.000 | |
117230 | Ohio | Hamilton | City of Cincinnati | HAM Western Hills Viaduct-Chem Pack Demolition | Chem Pack (2261 Spring Grove Avenue, Cincinnati, OH 45214) | Demolition of the Chem Pack building at 2261 Spring Grove Avenue | bridge/culvert replacement | 23/02/2023 | 2023 | CE | OKI-STBG | 127.396 | |
117230 | Ohio | Hamilton | City of Cincinnati | HAM Western Hills Viaduct-Chem Pack Demolition | Chem Pack (2261 Spring Grove Avenue, Cincinnati, OH 45214) | Demolition of the Chem Pack building at 2261 Spring Grove Avenue | bridge/culvert replacement | 23/02/2023 | 2023 | CE | Local | 52.000 | |
6-80104 | Kentucky | Kenton | KYTC | KY 17 | From Pioneer Park to Kyles Lane | Resurface and repair median | maintenance/reconstruction | 28/02/2023 | 2022 | D | SPP | 50.000 | |
6-80104 | Kentucky | Kenton | KYTC | KY 17 | From Pioneer Park to Kyles Lane | Resurface and repair median | maintenance/reconstruction | 28/02/2023 | 2023 | CO | SPP | 2.010.000 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2020 | PE | Local | 36.798 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2022 | RW | OKI-STBG | 27.098 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2022 | RW | Local | 200.000 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2023 | CO | OKI-CRRSAA | 1.860.675 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2023 | CO | OKI-STBG | 1.715.758 | |
113634 | Ohio | Warren | City of Mason | SR 741 | Between Cox-Smith Road and Spy Glass Hill Road | Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path. | widening/relocation | 03/03/2023 | 2023 | CO | Local | 6.366.212 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2018 | PE | Local | 14.838 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2023 | CO | OKI-CMAQ | 1.500.000 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2023 | CO | Local | 500.000 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2023 | CO | OKI-TA | 750.000 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2025 | CO | OKI-TA | 16.614 | |
108112 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 3 | Connection of Peffer Park to Talawanda High School | Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side. | bicycle/pedestrian/other | 29/03/2023 | 2023 | CO | Local | 1.785.750 | |
110419 | Ohio | Warren | City of Lebanon | WAR US42/SR63 10.62/5.26 | Within Lebanon city limits | FY23 Urban Paving on US 42 and SR 63 | maintenance/reconstruction | 17/04/2023 | 2023 | CO | OKI-STBG | 1.138.302 | |
110419 | Ohio | Warren | City of Lebanon | WAR US42/SR63 10.62/5.26 | Within Lebanon city limits | FY23 Urban Paving on US 42 and SR 63 | maintenance/reconstruction | 17/04/2023 | 2023 | CO | Preservation | 2.469.141 | |
110419 | Ohio | Warren | City of Lebanon | WAR US42/SR63 10.62/5.26 | Within Lebanon city limits | FY23 Urban Paving on US 42 and SR 63 | maintenance/reconstruction | 17/04/2023 | 2023 | CO | Local | 1.485.649 | |
108254 | Ohio | Clermont | Clermont County Engineer | CLE CR 3 Aicholtz Rd Roundabouts | West of Eastgate Square Drive to Glen-Este Withamsville Rd noth of Burgoyne Drive | Construct three roundabouts (1) Aicholtz at Eastgate Square Drive (2) realigned Aicholtz with Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north) | traffic operations/safety | 24/04/2023 | 2018 | PE | Local | 46.369 | |
108254 | Ohio | Clermont | Clermont County Engineer | CLE CR 3 Aicholtz Rd Roundabouts | West of Eastgate Square Drive to Glen-Este Withamsville Rd noth of Burgoyne Drive | Construct three roundabouts (1) Aicholtz at Eastgate Square Drive (2) realigned Aicholtz with Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north) | traffic operations/safety | 24/04/2023 | 2023 | CO | OKI-CMAQ | 4.054.588 | |
108254 | Ohio | Clermont | Clermont County Engineer | CLE CR 3 Aicholtz Rd Roundabouts | West of Eastgate Square Drive to Glen-Este Withamsville Rd noth of Burgoyne Drive | Construct three roundabouts (1) Aicholtz at Eastgate Square Drive (2) realigned Aicholtz with Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north) | traffic operations/safety | 24/04/2023 | 2023 | CO | Local | 1.673.292 | |
108254 | Ohio | Clermont | Clermont County Engineer | CLE CR 3 Aicholtz Rd Roundabouts | West of Eastgate Square Drive to Glen-Este Withamsville Rd noth of Burgoyne Drive | Construct three roundabouts (1) Aicholtz at Eastgate Square Drive (2) realigned Aicholtz with Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north) | traffic operations/safety | 24/04/2023 | 2023 | CE | Local | 502.130 | |
116648 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Red Bike FY 23 | City of Cincinnati | Purchase of bike kiosks and electric-assist bicycles, to expand the Cincinnati bike share system | bicycle/pedestrian/other | 03/05/2023 | 2023 | CO | OKI-TA | 693.194 | |
116648 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Red Bike FY 23 | City of Cincinnati | Purchase of bike kiosks and electric-assist bicycles, to expand the Cincinnati bike share system | bicycle/pedestrian/other | 03/05/2023 | 2023 | CO | Local | 187.500 | |
116648 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Red Bike FY 23 | City of Cincinnati | Purchase of bike kiosks and electric-assist bicycles, to expand the Cincinnati bike share system | bicycle/pedestrian/other | 03/05/2023 | 2023 | CE | Local | 93.750 | |
113851 | Ohio | Hamilton | Colerain Twp | HAM US 27 (Colerain Av) 11.09 Sidewalks | From Shady Crest Drive to Jonrose Avenue | Replace sidewalks | bicycle/pedestrian/other | 24/05/2023 | 2023 | CO | OKI-TA | 820.917 | |
113851 | Ohio | Hamilton | Colerain Twp | HAM US 27 (Colerain Av) 11.09 Sidewalks | From Shady Crest Drive to Jonrose Avenue | Replace sidewalks | bicycle/pedestrian/other | 24/05/2023 | 2023 | CO | Local | 1.296.048 | |
112894 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 6A | Between Woodburn Avenue and Blair Avenue | Construction of a shared use trail from Blair Court (adjacent to I-71) along a former rail corridor to the Dana Avenue and Woodburn Avenue intersection. | bicycle/pedestrian/other | 26/05/2023 | 2020 | PE | Local | 15.417 | |
112894 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 6A | Between Woodburn Avenue and Blair Avenue | Construction of a shared use trail from Blair Court (adjacent to I-71) along a former rail corridor to the Dana Avenue and Woodburn Avenue intersection. | bicycle/pedestrian/other | 26/05/2023 | 2023 | CO | OKI-STBG | 2.436.346 | |
112894 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 6A | Between Woodburn Avenue and Blair Avenue | Construction of a shared use trail from Blair Court (adjacent to I-71) along a former rail corridor to the Dana Avenue and Woodburn Avenue intersection. | bicycle/pedestrian/other | 26/05/2023 | 2024 | CO | OKI-STBG | 198.714 | |
112894 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 6A | Between Woodburn Avenue and Blair Avenue | Construction of a shared use trail from Blair Court (adjacent to I-71) along a former rail corridor to the Dana Avenue and Woodburn Avenue intersection. | bicycle/pedestrian/other | 26/05/2023 | 2025 | CO | OKI-STBG | 309.615 | |
112894 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 6A | Between Woodburn Avenue and Blair Avenue | Construction of a shared use trail from Blair Court (adjacent to I-71) along a former rail corridor to the Dana Avenue and Woodburn Avenue intersection. | bicycle/pedestrian/other | 26/05/2023 | 2023 | CO | Local | 955.864 | |
114326 | Ohio | Hamilton | City of Cincinnati | HAM Central Parkway Bikeway Ph 2 | Central Parkway: from Marshall to Ludlow | Construction of curb protected bike lanes | bicycle/pedestrian/other | 30/05/2023 | 2021 | PE | Local | 24.193 | |
114326 | Ohio | Hamilton | City of Cincinnati | HAM Central Parkway Bikeway Ph 2 | Central Parkway: from Marshall to Ludlow | Construction of curb protected bike lanes | bicycle/pedestrian/other | 30/05/2023 | 2024 | CO | OKI-TA | 80.000 | |
114326 | Ohio | Hamilton | City of Cincinnati | HAM Central Parkway Bikeway Ph 2 | Central Parkway: from Marshall to Ludlow | Construction of curb protected bike lanes | bicycle/pedestrian/other | 30/05/2023 | 2023 | CO | OKI-TA | 460.303 | |
114326 | Ohio | Hamilton | City of Cincinnati | HAM Central Parkway Bikeway Ph 2 | Central Parkway: from Marshall to Ludlow | Construction of curb protected bike lanes | bicycle/pedestrian/other | 30/05/2023 | 2023 | CO | Local | 2.612.200 | |
114381 | Ohio | Butler | Butler County | BUT TR 3370/CR 117 1.20/1.09 | Intersection of Liberty Way with Cox Road in Butler County | Convert the eastbound and westbound turn lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd. | traffic operations/safety | 30/05/2023 | 2021 | PE | Local | 17.146 | |
114381 | Ohio | Butler | Butler County | BUT TR 3370/CR 117 1.20/1.09 | Intersection of Liberty Way with Cox Road in Butler County | Convert the eastbound and westbound turn lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd. | traffic operations/safety | 30/05/2023 | 2023 | CO | OKI-CRRSAA | 1.978.280 | |
114381 | Ohio | Butler | Butler County | BUT TR 3370/CR 117 1.20/1.09 | Intersection of Liberty Way with Cox Road in Butler County | Convert the eastbound and westbound turn lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd. | traffic operations/safety | 30/05/2023 | 2023 | CO | OKI-STBG | 197.828 | |
114381 | Ohio | Butler | Butler County | BUT TR 3370/CR 117 1.20/1.09 | Intersection of Liberty Way with Cox Road in Butler County | Convert the eastbound and westbound turn lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd. | traffic operations/safety | 30/05/2023 | 2023 | CO | Local | 562.875 | |
115764 | Ohio | Clermont | Clermont County T.I.D. | CLE TR 767 2.86 Pond Run Rd | Bridge CLE TR 767 2.86 (SFN 1332260) | Replacement of Bridge CLE TR 767 2.86 (SFN 1332260) which carries Pond Run Road over Ten Mile Creek. | Grouped project | 08/06/2023 | 2024 | CO | Local | 148.727 | |
115764 | Ohio | Clermont | Clermont County T.I.D. | CLE TR 767 2.86 Pond Run Rd | Bridge CLE TR 767 2.86 (SFN 1332260) | Replacement of Bridge CLE TR 767 2.86 (SFN 1332260) which carries Pond Run Road over Ten Mile Creek. | Grouped project | 08/06/2023 | 2024 | CO | Local Programs | 594.906 | |
116545 | Ohio | Hamilton | The Banks Public Partners | HAM Banks VMS Phase 3 | The Banks Intermodal Center | Development and installation of a parking management system | traffic operations/safety | 08/06/2023 | 2023 | PE-DD | Local | 258.184 | |
116545 | Ohio | Hamilton | The Banks Public Partners | HAM Banks VMS Phase 3 | The Banks Intermodal Center | Development and installation of a parking management system | traffic operations/safety | 08/06/2023 | 2023 | CO | OKI-STBG | 2.749.014 | |
116545 | Ohio | Hamilton | The Banks Public Partners | HAM Banks VMS Phase 3 | The Banks Intermodal Center | Development and installation of a parking management system | traffic operations/safety | 08/06/2023 | 2023 | CO | Local | 1.105.028 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2022 | RW | OKI-STBG | 505.000 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2022 | RW | Local | 216.429 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2023 | CO | HSIP | 722.250 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2023 | CO | OKI-STBG | 6.095.000 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2025 | CO | OKI-STBG | 47.197 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2023 | CO | State | 169.112 | |
112909 | Ohio | Warren | Warren County | WAR SR 48 6.37 | Nunner Road to north of Ridgeview Lane/Saddle Creek Lane | Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3 | widening/relocation | 12/06/2023 | 2023 | CO | Local | 9.463.532 | |
6-454 | Kentucky | Kenton | City of Ludlow | Adela Avenue | KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) | Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. | maintenance/reconstruction | 12/06/2023 | 2019 | D | OKI-SNK | 28.781 | |
6-454 | Kentucky | Kenton | City of Ludlow | Adela Avenue | KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) | Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. | maintenance/reconstruction | 12/06/2023 | 2019 | D | Local | 11.394 | |
6-454 | Kentucky | Kenton | City of Ludlow | Adela Avenue | KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) | Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. | maintenance/reconstruction | 12/06/2023 | 2019 | D-SF | OKI-SNK | 6.590 | |
6-454 | Kentucky | Kenton | City of Ludlow | Adela Avenue | KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) | Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. | maintenance/reconstruction | 12/06/2023 | 2022 | CO | OKI-SNK | 209.425 | |
6-454 | Kentucky | Kenton | City of Ludlow | Adela Avenue | KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) | Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. | maintenance/reconstruction | 12/06/2023 | 2022 | CO | Local | 52.356 | |
107580 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 24.00 | BUT SR 4 from SLM 24 - 26.77 (Catlina Ct intersection to 0.40 miles north of Keister Road) | Resurfacing on a portion of SR 4 in Butler County from north of Middletown to the Montgomery County line. | Grouped project | 06/07/2023 | 2024 | CO | Labor | 66.575 | |
107580 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 24.00 | BUT SR 4 from SLM 24 - 26.77 (Catlina Ct intersection to 0.40 miles north of Keister Road) | Resurfacing on a portion of SR 4 in Butler County from north of Middletown to the Montgomery County line. | Grouped project | 06/07/2023 | 2024 | CO | Preservation | 1.331.497 | |
107580 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 24.00 | BUT SR 4 from SLM 24 - 26.77 (Catlina Ct intersection to 0.40 miles north of Keister Road) | Resurfacing on a portion of SR 4 in Butler County from north of Middletown to the Montgomery County line. | Grouped project | 06/07/2023 | 2024 | CO | State | 332.874 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2020 | D | TAP | 40.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2020 | D-SF | TAP | 4.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | RW | TAP | 16.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | RW | Local | 4.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | UT | TAP | 4.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | UT | Local | 1.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | CO | TAP | 28.000 | |
6-3227 | Kentucky | Campbell | City of Bellevue | Grandview Elementary Sidewalk | East side of S. Foote Avenue | New 180' of 10' sidewalk | bicycle/pedestrian/other | 18/07/2023 | 2021 | CO | Local | 7.000 | |
6-443 | Kentucky | Campbell | KYTC | US 27 | Extend SB right lane 350' to create continuous 3 lanes from Marshall Lane to Johns Hill Rd (KY 3490) | Add lane to provide three continuous southbound through-lanes to Johns Hill Road. | widening/relocation | 18/07/2023 | 2017 | D | OKI-SNK | 75.000 | |
6-443 | Kentucky | Campbell | KYTC | US 27 | Extend SB right lane 350' to create continuous 3 lanes from Marshall Lane to Johns Hill Rd (KY 3490) | Add lane to provide three continuous southbound through-lanes to Johns Hill Road. | widening/relocation | 18/07/2023 | 2020 | RW | OKI-SNK | 163.499 | |
6-443 | Kentucky | Campbell | KYTC | US 27 | Extend SB right lane 350' to create continuous 3 lanes from Marshall Lane to Johns Hill Rd (KY 3490) | Add lane to provide three continuous southbound through-lanes to Johns Hill Road. | widening/relocation | 18/07/2023 | 2022 | CO | OKI-SNK | 499.675 | |
113314 | Ohio | Butler | Ohio Rail Development Commission | BUT Augspurger Rd NS | BUT SR 127/Riverside Drive & Augspurger Road, New Miami at the NS grade crossing DOT # 525205V | Modification of grade crossing warning devices at Norfolk Southern crossing DOT # 525205V to include traffic signal preemption. Modification of traffic signals at the intersection of SR 127 / Riversi | Grouped project | 03/08/2023 | 2024 | CO | Labor | 3.000 | |
113314 | Ohio | Butler | Ohio Rail Development Commission | BUT Augspurger Rd NS | BUT SR 127/Riverside Drive & Augspurger Road, New Miami at the NS grade crossing DOT # 525205V | Modification of grade crossing warning devices at Norfolk Southern crossing DOT # 525205V to include traffic signal preemption. Modification of traffic signals at the intersection of SR 127 / Riversi | Grouped project | 03/08/2023 | 2024 | CO | Rail | 559.677 | |
116569 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Grouped project | 03/08/2023 | 2025 | ENV | Preservation | 240.000 | |
116569 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Grouped project | 03/08/2023 | 2025 | ENV | State | 60.000 | |
100827 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | Grouped project | 18/08/2023 | 2024 | CO | Labor | 219.497 | |
100827 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | Grouped project | 18/08/2023 | 2024 | CO | State | 627.134 | |
100827 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | Grouped project | 18/08/2023 | 2024 | CO | Preservation | 2.508.537 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2020 | PE | NHPP | 284.122 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2020 | PE | State | 71.030 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2020 | PE-DD | NHPP | 33.424 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2020 | PE-DD | State | 8.356 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2024 | CO | NHPP | 3.412.016 | |
100827 | Ohio | Warren | ODOT | WAR SR 73 14.58/14.62 | WAR-73-1458 - WAR-73-1462 | Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath. | maintenance/reconstruction | 18/08/2023 | 2024 | CO | State | 853.004 | |
105503 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08-SIGNS-FY2023 | Various routes in Hamilton Co | Systematic Sign Replacement on I-275 from US 42 to Clermont County Line. | Grouped project | 31/08/2023 | 2024 | CO | Labor | 139.523 | |
105503 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08-SIGNS-FY2023 | Various routes in Hamilton Co | Systematic Sign Replacement on I-275 from US 42 to Clermont County Line. | Grouped project | 31/08/2023 | 2024 | CO | Preservation | 1.993.190 | |
110076 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE CLI Culverts FY24 | varies in Clermont and Clinton County | Spot repairs small culvert CLE-50-0667 Pave invert CLI-134-0856, CLI-68-0859, and CLE-32-1099Replace culverts CLE-133-0770, CLE-133-0817 | Grouped project | 05/10/2023 | 2024 | CO | Labor | 43.988 | |
110076 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE CLI Culverts FY24 | varies in Clermont and Clinton County | Spot repairs small culvert CLE-50-0667 Pave invert CLI-134-0856, CLI-68-0859, and CLE-32-1099Replace culverts CLE-133-0770, CLE-133-0817 | Grouped project | 05/10/2023 | 2024 | CO | Preservation | 351.898 | |
110076 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE CLI Culverts FY24 | varies in Clermont and Clinton County | Spot repairs small culvert CLE-50-0667 Pave invert CLI-134-0856, CLI-68-0859, and CLE-32-1099Replace culverts CLE-133-0770, CLE-133-0817 | Grouped project | 05/10/2023 | 2024 | CO | State | 87.975 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CO | OKI-TA | 326.930 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CE | OKI-TA | 32.694 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CO | Local | 103.130 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CO | Safety | 110.700 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CO | State | 12.300 | |
114605 | Ohio | Hamilton | Great Parks of Hamilton County | HAM SR 4 7.00 Glenwood Gardens Trail Ph 1 | At entrance to Glenwood Gardens, from Springfield Pike to West Fork Mill Creek Trail | Construction of MUP from bus stop located on west side of SR 4, s of Glendale Milford, n to intersection of SR4 & Glendale Milford. From here, construct path w along GG to to existing trail. | bicycle/pedestrian/other | 05/10/2023 | 2024 | CO | Labor | 52.887 | |
115752 | Ohio | Hamilton | Norwood, City of | HAM SR 561 3.04 | HAM-561: SLM 3.04-4.06 + 4.59-5.36 | FY24 Urban Paving project in the City of Norwood on a portion of SR 561 | Grouped project | 05/10/2023 | 2024 | CO | Labor | 161.856 | |
115752 | Ohio | Hamilton | Norwood, City of | HAM SR 561 3.04 | HAM-561: SLM 3.04-4.06 + 4.59-5.36 | FY24 Urban Paving project in the City of Norwood on a portion of SR 561 | Grouped project | 05/10/2023 | 2024 | CO | Local | 1.011.600 | |
115752 | Ohio | Hamilton | Norwood, City of | HAM SR 561 3.04 | HAM-561: SLM 3.04-4.06 + 4.59-5.36 | FY24 Urban Paving project in the City of Norwood on a portion of SR 561 | Grouped project | 05/10/2023 | 2024 | CO | Preservation | 1.011.600 | |
114261 | Ohio | Butler | City of Hamilton | BUT Hamilton Beltline SUP Ph 3 | Along abandoned rail corridor from Main St. to Black St. | Construction of multi-use path | bicycle/pedestrian/other | 16/10/2023 | 2023 | RW | Local | 36.000 | |
114261 | Ohio | Butler | City of Hamilton | BUT Hamilton Beltline SUP Ph 3 | Along abandoned rail corridor from Main St. to Black St. | Construction of multi-use path | bicycle/pedestrian/other | 16/10/2023 | 2024 | CO | OKI-TA | 648.000 | |
114261 | Ohio | Butler | City of Hamilton | BUT Hamilton Beltline SUP Ph 3 | Along abandoned rail corridor from Main St. to Black St. | Construction of multi-use path | bicycle/pedestrian/other | 16/10/2023 | 2025 | CO | OKI-TA | 144.000 | |
114261 | Ohio | Butler | City of Hamilton | BUT Hamilton Beltline SUP Ph 3 | Along abandoned rail corridor from Main St. to Black St. | Construction of multi-use path | bicycle/pedestrian/other | 16/10/2023 | 2024 | CO | Local | 387.445 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2022 | RW | Major Programs | 2.400.000 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2022 | RW | State | 600.000 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | HSIP | 7.608.056 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | State | 845.340 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | OKI-CRRSAA | 5.400.000 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | Major New | 7.580.916 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | Federal-Earmark | 2.000.000 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | State | 1.895.229 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CO | Local | 3.100.000 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CE | Federal Labor | 1.004.820 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CE | State | 177.238 | |
103957 | Ohio | Clermont | Clermont County Engineer | CLE 32-2.33 | SR 32 at Glen Este Withamsville | Construction of the GEW overpass and approaches, GEW ramps, and local connection distributor road construction on SR 32. This is part 1/part 2 with PID 103958. | widening/relocation | 19/10/2023 | 2024 | CE | Local | 281.204 | |
103958 | Ohio | Clermont | Clermont County Engineer | CLE CR 55 Overpass | Glen Este Withamsville Overpass over SR32 | GEW Overpass over SR 32 | widening/relocation | 19/10/2023 | 2022 | RW | Major Programs | 2.400.000 | |
103958 | Ohio | Clermont | Clermont County Engineer | CLE CR 55 Overpass | Glen Este Withamsville Overpass over SR32 | GEW Overpass over SR 32 | widening/relocation | 19/10/2023 | 2023 | RW | Major Programs | 400.000 | |
103958 | Ohio | Clermont | Clermont County Engineer | CLE CR 55 Overpass | Glen Este Withamsville Overpass over SR32 | GEW Overpass over SR 32 | widening/relocation | 19/10/2023 | 2022 | RW | State | 600.000 | |
103958 | Ohio | Clermont | Clermont County Engineer | CLE CR 55 Overpass | Glen Este Withamsville Overpass over SR32 | GEW Overpass over SR 32 | widening/relocation | 19/10/2023 | 2023 | RW | State | 100.000 | |
113713 | Ohio | Hamilton | Colerain, Township of | HAM CR 90 3.89 | Pippin Road between Struble and Stout | Install a new sidewalk along the west side of Pippin Road between Struble and Stout and improve the crossings at the intersections. | Grouped project | 19/10/2023 | 2024 | CO | Labor | 54.212 | |
113713 | Ohio | Hamilton | Colerain, Township of | HAM CR 90 3.89 | Pippin Road between Struble and Stout | Install a new sidewalk along the west side of Pippin Road between Struble and Stout and improve the crossings at the intersections. | Grouped project | 19/10/2023 | 2024 | CO | Safety | 542.124 | |
110174 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR74 14.20 | HAM-IR74-14.20 (North Bend Rd.) | This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, | Grouped project | 20/10/2023 | 2024 | CO | State | 300.000 | |
110174 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR74 14.20 | HAM-IR74-14.20 (North Bend Rd.) | This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, | Grouped project | 20/10/2023 | 2024 | DD | Emergency | 76.000 | |
110174 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR74 14.20 | HAM-IR74-14.20 (North Bend Rd.) | This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, | Grouped project | 20/10/2023 | 2024 | CO | Other | 1.200.000 | |
110174 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR74 14.20 | HAM-IR74-14.20 (North Bend Rd.) | This slide is located along the south side of IR 74 within a fill section just prior to the EB I-74 North Bend Rd exit ramp. Over saturated fill, in combination with a stream at the toe of the slope, | Grouped project | 20/10/2023 | 2024 | CO | Labor | 150.000 | |
6-456 | Kentucky | Kenton | City of Covington | Madison Avenue | 11th Street to 8th Street | Underground utilites, street trees, streetlights, resurfacing, signal improvements. | maintenance/reconstruction | 20/10/2023 | 2020 | D | OKI-SNK | 276.215 | |
6-456 | Kentucky | Kenton | City of Covington | Madison Avenue | 11th Street to 8th Street | Underground utilites, street trees, streetlights, resurfacing, signal improvements. | maintenance/reconstruction | 20/10/2023 | 2020 | D | Local | 70.000 | |
6-456 | Kentucky | Kenton | City of Covington | Madison Avenue | 11th Street to 8th Street | Underground utilites, street trees, streetlights, resurfacing, signal improvements. | maintenance/reconstruction | 20/10/2023 | 2020 | D-SF | OKI-SNK | 5.476 | |
6-456 | Kentucky | Kenton | City of Covington | Madison Avenue | 11th Street to 8th Street | Underground utilites, street trees, streetlights, resurfacing, signal improvements. | maintenance/reconstruction | 20/10/2023 | 2023 | CO | OKI-SNK | 2.667.236 | |
6-456 | Kentucky | Kenton | City of Covington | Madison Avenue | 11th Street to 8th Street | Underground utilites, street trees, streetlights, resurfacing, signal improvements. | maintenance/reconstruction | 20/10/2023 | 2023 | CO | Local | 526.750 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2020 | D | OKI-SNK | 279.706 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2020 | D | Local | 70.000 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2020 | D-SF | OKI-SNK | 10.852 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2023 | CO | OKI-SNK | 2.987.294 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2024 | CO | OKI-SNK | 23.379 | |
6-457 | Kentucky | Kenton | City of Covington | 7th Street | Washington St to Greenup St | Sidewalk replacement,underground utilities,street trees, signal improvements, lighting, resurface | maintenance/reconstruction | 20/10/2023 | 2023 | CO | Local | 746.750 | |
100806 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE/CLI BS FY2024 | Various | Bridge sealing project to seal mainline bridges for CLI-71, CLE-275, CLI-73 and CLE-32 | Grouped project | 02/11/2023 | 2024 | CO | Labor | 51.126 | |
100806 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE/CLI BS FY2024 | Various | Bridge sealing project to seal mainline bridges for CLI-71, CLE-275, CLI-73 and CLE-32 | Grouped project | 02/11/2023 | 2024 | CO | State | 84.449 | |
100806 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE/CLI BS FY2024 | Various | Bridge sealing project to seal mainline bridges for CLI-71, CLE-275, CLI-73 and CLE-32 | Grouped project | 02/11/2023 | 2024 | CO | Preservation | 426.815 | |
110090 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE HAM Culverts FY24 | varies | pave inverts CLE-222-0904, CLE-48-0291, CLE-125-0109, and HAM-32-0673; replace CLE-48-0200, CLE-50-1003, and CLE-52-1051. Sockline CLE-222-2906, CLE-749-0323, and CLE-125-0477. | Grouped project | 02/11/2023 | 2024 | CO | Labor | 69.314 | |
110090 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE HAM Culverts FY24 | varies | pave inverts CLE-222-0904, CLE-48-0291, CLE-125-0109, and HAM-32-0673; replace CLE-48-0200, CLE-50-1003, and CLE-52-1051. Sockline CLE-222-2906, CLE-749-0323, and CLE-125-0477. | Grouped project | 02/11/2023 | 2024 | CO | Preservation | 554.513 | |
110090 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE HAM Culverts FY24 | varies | pave inverts CLE-222-0904, CLE-48-0291, CLE-125-0109, and HAM-32-0673; replace CLE-48-0200, CLE-50-1003, and CLE-52-1051. Sockline CLE-222-2906, CLE-749-0323, and CLE-125-0477. | Grouped project | 02/11/2023 | 2024 | CO | State | 138.628 | |
113982 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 22.00 | CLE SR 133: SLM 22.00 to 31.16 | Resurfacing a portion of SR 133 in Clermont County. Project will include edge replacements for northern section and a 4" resurfacing for the entire length. | Grouped project | 02/11/2023 | 2024 | CO | Labor | 224.000 | |
113982 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 22.00 | CLE SR 133: SLM 22.00 to 31.16 | Resurfacing a portion of SR 133 in Clermont County. Project will include edge replacements for northern section and a 4" resurfacing for the entire length. | Grouped project | 02/11/2023 | 2024 | CO | Major Programs | 4.480.000 | |
113982 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 22.00 | CLE SR 133: SLM 22.00 to 31.16 | Resurfacing a portion of SR 133 in Clermont County. Project will include edge replacements for northern section and a 4" resurfacing for the entire length. | Grouped project | 02/11/2023 | 2024 | CO | State | 1.120.000 | |
111398 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-122/177-00.56/9.69 | BUT-122-0054 and BUT-177-0969 | Replace small culvert BUT-122-0056 (CFN 1854347) and BUT-177-0969 (1860931) | Grouped project | 16/11/2023 | 2024 | CO | Labor | 30.500 | |
111398 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-122/177-00.56/9.69 | BUT-122-0054 and BUT-177-0969 | Replace small culvert BUT-122-0056 (CFN 1854347) and BUT-177-0969 (1860931) | Grouped project | 16/11/2023 | 2024 | CO | State | 305.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2021 | PE-ENV | State | 20.887 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2022 | PE-ENV | State | 419.520 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2024 | PE-DD | Local | 2.000.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2022 | PE-DD | Local | 2.000.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2022 | RW | Major Programs | 4.000.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2022 | RW | State | 1.000.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2022 | RW | Local | 1.500.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2024 | CO | Major Programs | 7.219.084 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2024 | CO | Discretionary / Earmark | 5.000.000 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2024 | CO | State | 54.771 | |
112121 | Ohio | Warren | Warren County TID | WAR SR63 0.83 | Between Union Road and east of the SR 741 intersection | Widening of SR 63 | widening/relocation | 22/11/2023 | 2024 | CO | Local | 9.060.411 | |
107695 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 9.28 | Along SR 4 from City of Hamilton Corp Line to SR 63 | Resurfacing and pavement repair on a portion of SR 4 in Butler County. Provide SHARE THE ROAD signage along SR-4 to coincide with USBR25. Replace bridge BUT-4-1488R. Perform minor rehabilitations of b | Grouped project | 04/12/2023 | 2024 | CO | Labor | 1.640.430 | |
107695 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 9.28 | Along SR 4 from City of Hamilton Corp Line to SR 63 | Resurfacing and pavement repair on a portion of SR 4 in Butler County. Provide SHARE THE ROAD signage along SR-4 to coincide with USBR25. Replace bridge BUT-4-1488R. Perform minor rehabilitations of b | Grouped project | 04/12/2023 | 2024 | CO | State | 4.099.893 | |
107695 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 9.28 | Along SR 4 from City of Hamilton Corp Line to SR 63 | Resurfacing and pavement repair on a portion of SR 4 in Butler County. Provide SHARE THE ROAD signage along SR-4 to coincide with USBR25. Replace bridge BUT-4-1488R. Perform minor rehabilitations of b | Grouped project | 04/12/2023 | 2024 | CO | Preservation | 16.399.573 | |
112978 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/WAR I-71 13.50/19.29/3.58 | HAM/WAR I-71 13.51/19.29/3.58 | Repair the inverts of the bridge size culverts HAM-71-1359 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete. Pave the invert | Grouped project | 04/12/2023 | 2024 | CO | Labor | 72.000 | |
112978 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/WAR I-71 13.50/19.29/3.58 | HAM/WAR I-71 13.51/19.29/3.58 | Repair the inverts of the bridge size culverts HAM-71-1359 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete. Pave the invert | Grouped project | 04/12/2023 | 2024 | CO | Local | 112.000 | |
112978 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/WAR I-71 13.50/19.29/3.58 | HAM/WAR I-71 13.51/19.29/3.58 | Repair the inverts of the bridge size culverts HAM-71-1359 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete. Pave the invert | Grouped project | 04/12/2023 | 2024 | CO | Preservation | 678.600 | |
112978 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/WAR I-71 13.50/19.29/3.58 | HAM/WAR I-71 13.51/19.29/3.58 | Repair the inverts of the bridge size culverts HAM-71-1359 and WAR-71-0358E. Extend the paved invert to the springline of the HAM-71-1929 bridge size culvert with reinforced concrete. Pave the invert | Grouped project | 04/12/2023 | 2024 | CO | State | 75.400 | |
118710 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 0.91 | Bridge HAM-71-0091, SFN: 3106314. | Rehabilitation of bridge HAM-71-0091 that carries Walnut Street over I-71 in City of Cincinnati | Grouped project | 04/12/2023 | 2024 | CO | Labor | 7.000 | |
118710 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 0.91 | Bridge HAM-71-0091, SFN: 3106314. | Rehabilitation of bridge HAM-71-0091 that carries Walnut Street over I-71 in City of Cincinnati | Grouped project | 04/12/2023 | 2024 | CO | State | 70.000 | |
6-3230 | Kentucky | Boone | Boone County | Frogtown Connector Road Sidewalk | West side of Frogtown Connector Road from the end of the existing sidewalk north to Frogtown Road | 5' sidewalk on west side of Frogtown Connector Road | bicycle/pedestrian/other | 05/12/2023 | 2021 | D | OKI-TA | 55.000 | |
6-3230 | Kentucky | Boone | Boone County | Frogtown Connector Road Sidewalk | West side of Frogtown Connector Road from the end of the existing sidewalk north to Frogtown Road | 5' sidewalk on west side of Frogtown Connector Road | bicycle/pedestrian/other | 05/12/2023 | 2021 | D-SF | OKI-TA | 5.000 | |
6-3230 | Kentucky | Boone | Boone County | Frogtown Connector Road Sidewalk | West side of Frogtown Connector Road from the end of the existing sidewalk north to Frogtown Road | 5' sidewalk on west side of Frogtown Connector Road | bicycle/pedestrian/other | 05/12/2023 | 2021 | D | Local | 13.750 | |
6-3230 | Kentucky | Boone | Boone County | Frogtown Connector Road Sidewalk | West side of Frogtown Connector Road from the end of the existing sidewalk north to Frogtown Road | 5' sidewalk on west side of Frogtown Connector Road | bicycle/pedestrian/other | 05/12/2023 | 2023 | CO | OKI-TA | 400.000 | |
6-3230 | Kentucky | Boone | Boone County | Frogtown Connector Road Sidewalk | West side of Frogtown Connector Road from the end of the existing sidewalk north to Frogtown Road | 5' sidewalk on west side of Frogtown Connector Road | bicycle/pedestrian/other | 05/12/2023 | 2023 | CO | Local | 100.000 | |
117577 | Ohio | Butler | Hamilton, City of | BUT CR 30 8.65 | New London Rd and West Fairway Drive | Pedestrian enhancements and addition of a two way left turn lane on New London Road and West Fairway Drive at Badin High School. Project consists of the installation of ADA curb ramps, updated thermop | Grouped project | 21/12/2023 | 2024 | CO | Local | 344.860 | |
117577 | Ohio | Butler | Hamilton, City of | BUT CR 30 8.65 | New London Rd and West Fairway Drive | Pedestrian enhancements and addition of a two way left turn lane on New London Road and West Fairway Drive at Badin High School. Project consists of the installation of ADA curb ramps, updated thermop | Grouped project | 21/12/2023 | 2024 | CO | Safety | 253.926 | |
117577 | Ohio | Butler | Hamilton, City of | BUT CR 30 8.65 | New London Rd and West Fairway Drive | Pedestrian enhancements and addition of a two way left turn lane on New London Road and West Fairway Drive at Badin High School. Project consists of the installation of ADA curb ramps, updated thermop | Grouped project | 21/12/2023 | 2024 | CO | State | 28.214 | |
114273 | Ohio | District8 | ODOT SPONSORING AGENCY | D08 Mowing FY2024 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped project | 11/01/2024 | 2024 | CO | Labor | 28.000 | |
114273 | Ohio | District8 | ODOT SPONSORING AGENCY | D08 Mowing FY2024 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped project | 11/01/2024 | 2024 | CO | State | 700.000 | |
120066 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR-275-A-NEVI-RD2 | IR 275 HAM 14.127 - 18.032 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 25/01/2024 | 2024 | CO | Local | 200.000 | |
120066 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR-275-A-NEVI-RD2 | IR 275 HAM 14.127 - 18.032 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 25/01/2024 | 2024 | CO | Other | 800.000 | |
112980 | Ohio | Clinton | ODOT SPONSORING AGENCY | CLE/CLI BP VAR 2024 | CLI-73-0228, CLI-71-0031, CLI-71-0407, CLI-134-1107, CLE-727-0263 | Rehabilitated bridge CLI-73-0228 which carries SR 73 over I-71 by painting the structural steel, patching the superstructure and barrier, replacing the vandal protection fencing, and sealing the barri | Grouped project | 01/02/2024 | 2024 | CO | Preservation | 2.471.500 | |
112980 | Ohio | Clinton | ODOT SPONSORING AGENCY | CLE/CLI BP VAR 2024 | CLI-73-0228, CLI-71-0031, CLI-71-0407, CLI-134-1107, CLE-727-0263 | Rehabilitated bridge CLI-73-0228 which carries SR 73 over I-71 by painting the structural steel, patching the superstructure and barrier, replacing the vandal protection fencing, and sealing the barri | Grouped project | 01/02/2024 | 2024 | CO | State | 536.500 | |
112980 | Ohio | Clinton | ODOT SPONSORING AGENCY | CLE/CLI BP VAR 2024 | CLI-73-0228, CLI-71-0031, CLI-71-0407, CLI-134-1107, CLE-727-0263 | Rehabilitated bridge CLI-73-0228 which carries SR 73 over I-71 by painting the structural steel, patching the superstructure and barrier, replacing the vandal protection fencing, and sealing the barri | Grouped project | 01/02/2024 | 2024 | CO | Labor | 210.560 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2021 | PE-ENV | Major Programs | 265.513 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2021 | PE-ENV | State | 66.378 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2023 | PE-DD | Major Programs | 40.773 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2023 | PE-DD | State | 10.193 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2023 | RW | Local | 600.000 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2024 | CO | OKI-TA | 825.000 | |
113602 | Ohio | Hamilton | Anderson Twp | HAM LMST Ext to Elstun Ph2 | Intersection of SR 125 and Elstun | Extend LMST east to the intersection of SR 125 and Elstun | bicycle/pedestrian/other | 01/02/2024 | 2024 | CO | Local | 1.606.000 | |
114283 | Ohio | District8 | ODOT SPONSORING AGENCY | D08/D07 Mowing FY2024 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties.District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Grouped project | 01/02/2024 | 2024 | CO | State | 700.000 | |
114283 | Ohio | District8 | ODOT SPONSORING AGENCY | D08/D07 Mowing FY2024 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties.District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Grouped project | 01/02/2024 | 2024 | CO | Labor | 28.000 | |
110973 | Ohio | Warren | Warren County Engineer | WAR TR 52 4.02 Bridge Rehab | Bridge WAR-TR 52-0402 (SFN: 8334773) which carries Roachester-Cozaddale Road over First Creek | Rehabilitation of Bridge WAR-TR 52-0402 (SFN: 8334773) by replacing the superstructure with a prestressed concrete composite box beam superstructure. Minor substructure repairs will also be performed. | Grouped project | 12/02/2024 | 2024 | CO | Local | 23.750 | |
110973 | Ohio | Warren | Warren County Engineer | WAR TR 52 4.02 Bridge Rehab | Bridge WAR-TR 52-0402 (SFN: 8334773) which carries Roachester-Cozaddale Road over First Creek | Rehabilitation of Bridge WAR-TR 52-0402 (SFN: 8334773) by replacing the superstructure with a prestressed concrete composite box beam superstructure. Minor substructure repairs will also be performed. | Grouped project | 12/02/2024 | 2024 | CO | State | 451.250 | |
114603 | Ohio | Warren | Deerfield Twp | WAR Irwin-Simpson Shared Use Path | Between Mason Montgomery Road and Duke Boulevard | Construction of shared use trail | bicycle/pedestrian/other | 12/02/2024 | 2024 | CO | OKI-TA | 600.560 | |
114603 | Ohio | Warren | Deerfield Twp | WAR Irwin-Simpson Shared Use Path | Between Mason Montgomery Road and Duke Boulevard | Construction of shared use trail | bicycle/pedestrian/other | 12/02/2024 | 2024 | CO | Local | 267.104 | |
110570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.00 | HAM-50: SLM 29.00-30.22 and SLM 34.14-35.73 | Rehabilitate bridge HAM-50-2910 (US 50 over 2 railroads, Duck Creek, and Red Bank Rd, SFN 3103811) by removing and replacing the existing deck with a new composite, reinforced concrete deck; Replace t | Grouped project | 16/02/2024 | 2024 | CO | Labor | 792.850 | |
110570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.00 | HAM-50: SLM 29.00-30.22 and SLM 34.14-35.73 | Rehabilitate bridge HAM-50-2910 (US 50 over 2 railroads, Duck Creek, and Red Bank Rd, SFN 3103811) by removing and replacing the existing deck with a new composite, reinforced concrete deck; Replace t | Grouped project | 16/02/2024 | 2024 | CO | Preservation | 9.061.144 | |
110570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.00 | HAM-50: SLM 29.00-30.22 and SLM 34.14-35.73 | Rehabilitate bridge HAM-50-2910 (US 50 over 2 railroads, Duck Creek, and Red Bank Rd, SFN 3103811) by removing and replacing the existing deck with a new composite, reinforced concrete deck; Replace t | Grouped project | 16/02/2024 | 2024 | CO | State | 2.265.286 | |
110570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.00 | HAM-50: SLM 29.00-30.22 and SLM 34.14-35.73 | Rehabilitate bridge HAM-50-2910 (US 50 over 2 railroads, Duck Creek, and Red Bank Rd, SFN 3103811) by removing and replacing the existing deck with a new composite, reinforced concrete deck; Replace t | Grouped project | 16/02/2024 | 2025 | CO | Preservation | 320.000 | |
110570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.00 | HAM-50: SLM 29.00-30.22 and SLM 34.14-35.73 | Rehabilitate bridge HAM-50-2910 (US 50 over 2 railroads, Duck Creek, and Red Bank Rd, SFN 3103811) by removing and replacing the existing deck with a new composite, reinforced concrete deck; Replace t | Grouped project | 16/02/2024 | 2025 | CO | State | 80.000 | |
102544 | Ohio | Butler | ODOT SPONSORING AGENCY | HAM/BUT SR 128 10.75/0.00 | BUT-128 SLM 0.00-0.69/1.56- 7.50/7.57-7.74/8.33-8.49. HAM-128 SLM 10.75-13.26 | Resurfacing portion of SR 128 in Butler and Hamilton Counties | Grouped project | 22/02/2024 | 2024 | CO | Other | 685.413 | |
102544 | Ohio | Butler | ODOT SPONSORING AGENCY | HAM/BUT SR 128 10.75/0.00 | BUT-128 SLM 0.00-0.69/1.56- 7.50/7.57-7.74/8.33-8.49. HAM-128 SLM 10.75-13.26 | Resurfacing portion of SR 128 in Butler and Hamilton Counties | Grouped project | 22/02/2024 | 2024 | CO | Preservation | 2.845.159 | |
102544 | Ohio | Butler | ODOT SPONSORING AGENCY | HAM/BUT SR 128 10.75/0.00 | BUT-128 SLM 0.00-0.69/1.56- 7.50/7.57-7.74/8.33-8.49. HAM-128 SLM 10.75-13.26 | Resurfacing portion of SR 128 in Butler and Hamilton Counties | Grouped project | 22/02/2024 | 2024 | CO | Labor | 802.018 | |
102544 | Ohio | Butler | ODOT SPONSORING AGENCY | HAM/BUT SR 128 10.75/0.00 | BUT-128 SLM 0.00-0.69/1.56- 7.50/7.57-7.74/8.33-8.49. HAM-128 SLM 10.75-13.26 | Resurfacing portion of SR 128 in Butler and Hamilton Counties | Grouped project | 22/02/2024 | 2024 | CO | Local | 322.500 | |
102544 | Ohio | Butler | ODOT SPONSORING AGENCY | HAM/BUT SR 128 10.75/0.00 | BUT-128 SLM 0.00-0.69/1.56- 7.50/7.57-7.74/8.33-8.49. HAM-128 SLM 10.75-13.26 | Resurfacing portion of SR 128 in Butler and Hamilton Counties | Grouped project | 22/02/2024 | 2024 | CO | State | 186.204 | |
115448 | Ohio | Hamilton | City of Cincinnati | HAM Kirby Sidewalks | Kirby Road from North Bend Ramps to Sun Valley Apartments; Reading Road and Seymour Avenue along Woo | Construct sidewalk along Kirby Road to connect the Sun Valley Apartments to Mount Airy School and to install school zone flashers and signs at Woodward High School. | Grouped project | 29/02/2024 | 2024 | CO | Local | 31.500 | |
115448 | Ohio | Hamilton | City of Cincinnati | HAM Kirby Sidewalks | Kirby Road from North Bend Ramps to Sun Valley Apartments; Reading Road and Seymour Avenue along Woo | Construct sidewalk along Kirby Road to connect the Sun Valley Apartments to Mount Airy School and to install school zone flashers and signs at Woodward High School. | Grouped project | 29/02/2024 | 2024 | CO | Local Programs | 315.000 | |
110564 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 34.18 | HAM-275-34.18 | Rehabilitate Bridge HAM-275-3418 (Hopewell Rd over I-275) by replacing the wingwalls, replacing the barriers, and adding a sidewalk. | Grouped project | 01/03/2024 | 2024 | CO | Labor | 87.430 | |
110564 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 34.18 | HAM-275-34.18 | Rehabilitate Bridge HAM-275-3418 (Hopewell Rd over I-275) by replacing the wingwalls, replacing the barriers, and adding a sidewalk. | Grouped project | 01/03/2024 | 2024 | CO | Preservation | 1.124.100 | |
110564 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 34.18 | HAM-275-34.18 | Rehabilitate Bridge HAM-275-3418 (Hopewell Rd over I-275) by replacing the wingwalls, replacing the barriers, and adding a sidewalk. | Grouped project | 01/03/2024 | 2024 | CO | State | 124.900 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2023 | PE-RWS | Local | 60.000 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2023 | RW | OKI-CMAQ | 156.480 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2023 | RW | Local | 104.320 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2024 | CO | OKI-CMAQ | 1.133.737 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2025 | CO | OKI-CMAQ | 62.839 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2024 | CO | Local | 817.657 | |
114214 | Ohio | Hamilton | City of Sharonville | US 42 Shared Use Path | Between Downtown Sharonville and East Kemper Road | Construct a shared use path | bicycle/pedestrian/other | 01/03/2024 | 2024 | CE | OKI-CMAQ | 79.361 | |
115447 | Ohio | Hamilton | Sharonville, City of | HAM Sharonville SRTS 2021 | Intersections of Creek Road at Beekley Woods, Cornell at Maple Street, and Thornview at Robindale/Ev | At the intersection of Creek Rd at Beekley Woods, install ADA compliant curb ramps; relocate the crosswalk to the east side of Beekley Woods Drive; install high visibility crosswalks, signage, pedestr | Grouped project | 01/03/2024 | 2024 | CO | Labor | 30.786 | |
115447 | Ohio | Hamilton | Sharonville, City of | HAM Sharonville SRTS 2021 | Intersections of Creek Road at Beekley Woods, Cornell at Maple Street, and Thornview at Robindale/Ev | At the intersection of Creek Rd at Beekley Woods, install ADA compliant curb ramps; relocate the crosswalk to the east side of Beekley Woods Drive; install high visibility crosswalks, signage, pedestr | Grouped project | 01/03/2024 | 2024 | CO | Local | 8.482 | |
115447 | Ohio | Hamilton | Sharonville, City of | HAM Sharonville SRTS 2021 | Intersections of Creek Road at Beekley Woods, Cornell at Maple Street, and Thornview at Robindale/Ev | At the intersection of Creek Rd at Beekley Woods, install ADA compliant curb ramps; relocate the crosswalk to the east side of Beekley Woods Drive; install high visibility crosswalks, signage, pedestr | Grouped project | 01/03/2024 | 2024 | CO | Local Programs | 299.378 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2023 | PE-DD | Major Programs | 99.858 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2023 | PE-DD | State | 24.964 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2024 | CO | Garvee / SIB | 10.248.469 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2024 | CO | Major Programs | 3.159.625 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2024 | CO | State | 789.906 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2025 | CE | Federal | 160.000 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2024 | CE | Federal | 1.135.088 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2024 | CE | State | 283.772 | |
117526 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 Pump Station & CSO | From SR 562 to SR 126/Galbraith Rd. area | Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75 | widening/relocation | 04/04/2024 | 2025 | CE | State | 40.000 | |
111842 | Ohio | Hamilton | Madeira, City of | HAM CR 101 13.63 | Miami Road and Galbraith Road | Construction of a mini-roundabout at the intersection of Miami Rd and Galbraith Rd. | Grouped project | 11/04/2024 | 2024 | CO | Labor | 92.640 | |
111842 | Ohio | Hamilton | Madeira, City of | HAM CR 101 13.63 | Miami Road and Galbraith Road | Construction of a mini-roundabout at the intersection of Miami Rd and Galbraith Rd. | Grouped project | 11/04/2024 | 2024 | CO | Local | 92.640 | |
111842 | Ohio | Hamilton | Madeira, City of | HAM CR 101 13.63 | Miami Road and Galbraith Road | Construction of a mini-roundabout at the intersection of Miami Rd and Galbraith Rd. | Grouped project | 11/04/2024 | 2024 | CO | Safety | 833.757 | |
114264 | Ohio | Clermont | Village of Williamsburg | CLE SR 133 20.29 Shared Use Path | In Williamsburg along E. Main Street from Dela Palma to State Route 133 | Construct concrete side path | bicycle/pedestrian/other | 17/04/2024 | 2023 | PE-RWS | Local | 12.000 | |
114264 | Ohio | Clermont | Village of Williamsburg | CLE SR 133 20.29 Shared Use Path | In Williamsburg along E. Main Street from Dela Palma to State Route 133 | Construct concrete side path | bicycle/pedestrian/other | 17/04/2024 | 2024 | RW | OKI-TA | 27.018 | |
114264 | Ohio | Clermont | Village of Williamsburg | CLE SR 133 20.29 Shared Use Path | In Williamsburg along E. Main Street from Dela Palma to State Route 133 | Construct concrete side path | bicycle/pedestrian/other | 17/04/2024 | 2023 | RW | Local | 20.000 | |
114264 | Ohio | Clermont | Village of Williamsburg | CLE SR 133 20.29 Shared Use Path | In Williamsburg along E. Main Street from Dela Palma to State Route 133 | Construct concrete side path | bicycle/pedestrian/other | 17/04/2024 | 2024 | CO | OKI-TA | 336.723 | |
114264 | Ohio | Clermont | Village of Williamsburg | CLE SR 133 20.29 Shared Use Path | In Williamsburg along E. Main Street from Dela Palma to State Route 133 | Construct concrete side path | bicycle/pedestrian/other | 17/04/2024 | 2024 | CO | Local | 370.534 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2021 | PE | Local | 52.607 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2023 | RW | OKI-TA | 35.000 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2023 | RW | Local | 15.000 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2025 | CO | OKI-TA | 10.602 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CO | OKI-TA | 330.110 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CO | Local | 169.701 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CO | Labor | 60.287 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CO | Safety | 169.121 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CO | State | 18.791 | |
113500 | Ohio | Hamilton | Green Twp | HAM US 27 10.18 Sidewalks | From Blue Rock Road to Loretta Avenue | Install sidewalks on both sides of Colerain Avenue | bicycle/pedestrian/other | 23/04/2024 | 2024 | CE | OKI-TA | 57.508 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2021 | RW | STBG | 2.800.000 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2021 | RW | State | 700.000 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2021 | UT | STBG | 1.560.000 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2021 | UT | State | 390.000 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2024 | CO | STBG | 22.400.000 | |
6-162.30 | Kentucky | Kenton | KYTC | KY 536 | KY 1303 to Williamswood Rd/Calvary Drive | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 23/04/2024 | 2024 | CO | State | 5.600.000 | |
102783 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 23.17 | BUT US 4 23.17 SFN 0900397 | Rehabilitate Bridge BUT-4-23.17 over the Great Miami River by patching and strengthening piers with (Fiber Reinforced Polymer) FRP | Grouped project | 26/04/2024 | 2024 | CO | Labor | 77.197 | |
102783 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 23.17 | BUT US 4 23.17 SFN 0900397 | Rehabilitate Bridge BUT-4-23.17 over the Great Miami River by patching and strengthening piers with (Fiber Reinforced Polymer) FRP | Grouped project | 26/04/2024 | 2024 | CO | Preservation | 882.250 | |
102783 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4 23.17 | BUT US 4 23.17 SFN 0900397 | Rehabilitate Bridge BUT-4-23.17 over the Great Miami River by patching and strengthening piers with (Fiber Reinforced Polymer) FRP | Grouped project | 26/04/2024 | 2024 | CO | State | 220.563 | |
112972 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08 Bridge/Wall Repairs | HAM-126-1501 & HAM-75-0722 | Bridge project to repair bridge wingwall and retaining wall issues including the MSE wall at the HAM-126-1501 R bridge at the EB exit ramp to US 42, HAM-71-0125, and HAM-71-0126. CIP retaining wall e | Grouped Project | 26/04/2024 | 2024 | CO | State | 198.265 | |
113720 | Ohio | Clermont | Batavia, Village of | CLE SR 132 12.49 | Intersection of SR-132 and SR-222 | Install roundabout at the intersection of SR-132 and SR-222 | Grouped project | 26/04/2024 | 2024 | CO | Labor | 183.155 | |
113720 | Ohio | Clermont | Batavia, Village of | CLE SR 132 12.49 | Intersection of SR-132 and SR-222 | Install roundabout at the intersection of SR-132 and SR-222 | Grouped project | 26/04/2024 | 2024 | CO | Safety | 2.616.500 | |
116264 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 11.98 | SR-125 at Sugartree Rd | Install left turn lanes in both directions on SR-125 at Sugartree Rd | Grouped project | 26/04/2024 | 2024 | CO | Safety | 811.800 | |
116264 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 11.98 | SR-125 at Sugartree Rd | Install left turn lanes in both directions on SR-125 at Sugartree Rd | Grouped project | 26/04/2024 | 2024 | CO | State | 90.200 | |
116264 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 11.98 | SR-125 at Sugartree Rd | Install left turn lanes in both directions on SR-125 at Sugartree Rd | Grouped project | 26/04/2024 | 2024 | DD | Safety | 13.360 | |
116264 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 11.98 | SR-125 at Sugartree Rd | Install left turn lanes in both directions on SR-125 at Sugartree Rd | Grouped project | 26/04/2024 | 2024 | DD | State | 1.484 | |
116264 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 11.98 | SR-125 at Sugartree Rd | Install left turn lanes in both directions on SR-125 at Sugartree Rd | Grouped project | 26/04/2024 | 2024 | CO | Labor | 90.200 | |
102886 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 0.54 | HAM SR 562 between SLM 0-3.43 | Resurfacing the Norwood Lateral (SR 562) in Hamilton County.Rehabilitate mainline bridges of SR 562 by replacing joints, painting, sealing, and replacing barriers. | Grouped project | 30/04/2024 | 2024 | CO | State | 2.389.056 | |
102886 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 0.54 | HAM SR 562 between SLM 0-3.43 | Resurfacing the Norwood Lateral (SR 562) in Hamilton County.Rehabilitate mainline bridges of SR 562 by replacing joints, painting, sealing, and replacing barriers. | Grouped project | 30/04/2024 | 2024 | CO | Labor | 942.220 | |
102886 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 0.54 | HAM SR 562 between SLM 0-3.43 | Resurfacing the Norwood Lateral (SR 562) in Hamilton County.Rehabilitate mainline bridges of SR 562 by replacing joints, painting, sealing, and replacing barriers. | Grouped project | 30/04/2024 | 2024 | CO | Local | 65.000 | |
102886 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 0.54 | HAM SR 562 between SLM 0-3.43 | Resurfacing the Norwood Lateral (SR 562) in Hamilton County.Rehabilitate mainline bridges of SR 562 by replacing joints, painting, sealing, and replacing barriers. | Grouped project | 30/04/2024 | 2024 | CO | Major Programs | 4.600.000 | |
102886 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 0.54 | HAM SR 562 between SLM 0-3.43 | Resurfacing the Norwood Lateral (SR 562) in Hamilton County.Rehabilitate mainline bridges of SR 562 by replacing joints, painting, sealing, and replacing barriers. | Grouped project | 30/04/2024 | 2024 | CO | Preservation | 6.456.224 | |
104788 | Ohio | Hamilton | City of Cincinnati | HAM US 27 3.58 | Brighton Approach Bridge over Central Parkway (US 27) in Cincinnati, OH | Replacement of the Brighton Approach Bridge (SFN 3101533), carrying the Brighton Approach over Central Parkway in Cincinnati, OH. | Grouped project | 30/04/2024 | 2024 | CO | Local Programs | 2.000.000 | |
104788 | Ohio | Hamilton | City of Cincinnati | HAM US 27 3.58 | Brighton Approach Bridge over Central Parkway (US 27) in Cincinnati, OH | Replacement of the Brighton Approach Bridge (SFN 3101533), carrying the Brighton Approach over Central Parkway in Cincinnati, OH. | Grouped project | 30/04/2024 | 2024 | CO | Local | 4.960.428 | |
117643 | Ohio | Warren | Warren County Engineer | WAR TR 158 0.92 Stephens Rd | Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run | Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run. | Grouped project | 03/05/2024 | 2024 | CO | Labor | 47.763 | |
117643 | Ohio | Warren | Warren County Engineer | WAR TR 158 0.92 Stephens Rd | Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run | Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run. | Grouped project | 03/05/2024 | 2024 | CO | Local Programs | 477.628 | |
117643 | Ohio | Warren | Warren County Engineer | WAR TR 158 0.92 Stephens Rd | Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run | Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run. | Grouped project | 03/05/2024 | 2024 | RW | Labor | 40.000 | |
117643 | Ohio | Warren | Warren County Engineer | WAR TR 158 0.92 Stephens Rd | Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run | Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run. | Grouped project | 03/05/2024 | 2024 | RW | Local | 3.380 | |
117643 | Ohio | Warren | Warren County Engineer | WAR TR 158 0.92 Stephens Rd | Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run | Replacement of Bridge WAR-TR 158-0.92 (SFN: 8333459) which carries Stephens Road over a tributary to Bear Run. | Grouped project | 03/05/2024 | 2024 | RW | Local Programs | 13.520 | |
119063 | Ohio | Butler | Butler County | BUT VAR Signal Upgrades | Various within Butler County | Upgrade controllers, detection replacement, CCTV cameras, and communication equipment | traffic operations/safety | 03/05/2024 | 2024 | PE-DD | Local | 46.050 | |
119063 | Ohio | Butler | Butler County | BUT VAR Signal Upgrades | Various within Butler County | Upgrade controllers, detection replacement, CCTV cameras, and communication equipment | traffic operations/safety | 03/05/2024 | 2024 | CO | OKI-STBG | 686.314 | |
119063 | Ohio | Butler | Butler County | BUT VAR Signal Upgrades | Various within Butler County | Upgrade controllers, detection replacement, CCTV cameras, and communication equipment | traffic operations/safety | 03/05/2024 | 2024 | CO | Local | 563.046 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2021 | PE-ENV | OKI-CMAQ | 132.162 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2021 | PE-ENV | Local | 33.041 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2021 | PE-DD | OKI-CMAQ | 132.867 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2021 | PE-DD | Local | 33.217 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2022 | RW | OKI-CMAQ | 93.771 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2022 | RW | Local | 23.619 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2024 | CO | OKI-CMAQ | 1.213.323 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2024 | CO | OKI-STBG | 157.212 | |
107292 | Ohio | Clermont | Village of Owensville | CLE US 50/SR 132 Intersections | US 50 and SR 132 intersections in Village of Owensville (two intersections) | Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. | traffic operations/safety | 08/05/2024 | 2024 | CO | Local | 1.610.555 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2021 | PE-ENV | State | 19.635 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2021 | PE-DD | State | 3.465 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2021 | RW | State | 60.000 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2023 | RW | OKI-STBG | 180.000 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2025 | RW | OKI-STBG | 36.000 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2023 | RW | Local | 70.000 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2025 | RW | Local | 14.000 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2024 | CO | OKI-STBG | 2.487.586 | |
114393 | Ohio | Butler | City of Fairfield | BUT TR 99 0.50 S. Gilmore Road | Mack Road to Planet Drive | Add 1 lane southbound (length approx. 2500'), add sidewalk and upgrade existing substandard sidewalk. | bicycle/pedestrian/other | 08/05/2024 | 2024 | CO | Local | 2.678.220 | |
114623 | Ohio | Warren | City of Lebanon | WAR US 42 9.54 | US42 between west corp. limit to SR123; SR123 between S. Broadway eastern corp. limit | Paving in the City of Lebanon. Project includes OKI and FY24 Urban Paving funding | maintenance/reconstruction | 15/05/2024 | 2024 | CO | OKI-STBG | 613.871 | |
114623 | Ohio | Warren | City of Lebanon | WAR US 42 9.54 | US42 between west corp. limit to SR123; SR123 between S. Broadway eastern corp. limit | Paving in the City of Lebanon. Project includes OKI and FY24 Urban Paving funding | maintenance/reconstruction | 15/05/2024 | 2024 | CO | Preservation | 1.153.260 | |
114623 | Ohio | Warren | City of Lebanon | WAR US 42 9.54 | US42 between west corp. limit to SR123; SR123 between S. Broadway eastern corp. limit | Paving in the City of Lebanon. Project includes OKI and FY24 Urban Paving funding | maintenance/reconstruction | 15/05/2024 | 2024 | CO | Local | 1.675.604 | |
115793 | Ohio | Warren | Warren County Engineer | WAR TR 71 0.39 McClure Rd Bridge | Bridge No. WAR-TR 71-0.39 (SFN: 8334439) carrying McClure Road over Turtle Creek | Replacement of the superstructure of Bridge WAR-TR 71-0.39 (SFN: 8334439). | Grouped project | 15/05/2024 | 2024 | CO | Local | 33.500 | |
115793 | Ohio | Warren | Warren County Engineer | WAR TR 71 0.39 McClure Rd Bridge | Bridge No. WAR-TR 71-0.39 (SFN: 8334439) carrying McClure Road over Turtle Creek | Replacement of the superstructure of Bridge WAR-TR 71-0.39 (SFN: 8334439). | Grouped project | 15/05/2024 | 2024 | CO | State | 636.500 | |
114475 | Ohio | Hamilton | City of Springdale | HAM CR 614 1.39 Northland Blvd | Between SR4 and West Kemper Rd | Reconstruction, replace pavement and drainage improvements, replace mast arm traffic signal, add sidewalks and provide pedestrian crossing | maintenance/reconstruction | 20/05/2024 | 2024 | CO | OKI-STBG | 5.875.044 | |
114475 | Ohio | Hamilton | City of Springdale | HAM CR 614 1.39 Northland Blvd | Between SR4 and West Kemper Rd | Reconstruction, replace pavement and drainage improvements, replace mast arm traffic signal, add sidewalks and provide pedestrian crossing | maintenance/reconstruction | 20/05/2024 | 2024 | CO | Local | 2.856.956 | |
119067 | Ohio | Hamilton | Cincy Bike Share | HAM Cincinnati Red Bike FY24 | City of Cincinnati | Purchase of new ebikes and replacement parts | bicycle/pedestrian/other | 31/05/2024 | 2024 | OTH | OKI-TA | 318.352 | |
119067 | Ohio | Hamilton | Cincy Bike Share | HAM Cincinnati Red Bike FY24 | City of Cincinnati | Purchase of new ebikes and replacement parts | bicycle/pedestrian/other | 31/05/2024 | 2024 | OTH | Local | 83.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2011 | PE | NHS | 5.616.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2011 | PE | State | 1.404.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2014 | RW | Major New | 1.719.200 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2014 | RW | State | 429.800 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | CO | Bonds-State | 107.023.195 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | CO | Federal-Preservation | 1.040.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | CO | State-Preservation | 260.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | CE | Federal | 9.505.725 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | CE | State | 1.626.900 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | RR | Federal-Major Rehab | 4.752.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | RR | State-Major Rehab | 1.188.000 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2027 | OTH | Garvee Debt Service | 6.081.975 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2023 | OTH | Garvee Debt Service | 1.457.616 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2024 | OTH | Garvee Debt Service | 4.411.981 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2025 | OTH | Garvee Debt Service | 6.081.974 | |
77889 | Ohio | Hamilton | ODOT | HAM IR 75 7.85 | Begin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30 | Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter | widening/relocation | 31/05/2024 | 2026 | OTH | Garvee Debt Service | 6.081.974 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2022 | D | OKI-SNK | 12.000 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2022 | D | Local | 3.000 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2022 | D-SF | OKI-SNK | 5.000 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2022 | D-SF | State | 1.250 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2024 | CO | OKI-SNK | 220.600 | |
6-128 | Kentucky | Campbell | City of Bellevue | Bellevue Resurfacing and Sidewalk Improvements | Berry Avenue, Taylor Avenue, Bonnie Leslie Avenue and Wilson Road Boulevard | Resurfacing and partial sidewalk replacement | maintenance/reconstruction | 05/06/2024 | 2024 | CO | Local | 233.004 | |
88679 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.16 | IR 74: from SLM 11.16 to 18.0 | Minor rehab on the pavement including structures of I-74 from the overlap section to I-75. | Grouped Project | 20/06/2024 | 2025 | CO | State | 1.209.587 | |
117498 | Ohio | Clermont | Clermont County T.I.D. | CLE TR 39 1.20 Ireton Trees Rd | Bridge CLE-TR 39-1.20 (SFN: 1333518): carries Ireton Trees Road over North Fork | Bridge CLE TR 39 1.20 (SFN: 1333518): Replace existing superstructure and upgrade guardrail on approaches. | Grouped Project | 30/06/2024 | 2024 | CO | Local | 40.526 | |
117498 | Ohio | Clermont | Clermont County T.I.D. | CLE TR 39 1.20 Ireton Trees Rd | Bridge CLE-TR 39-1.20 (SFN: 1333518): carries Ireton Trees Road over North Fork | Bridge CLE TR 39 1.20 (SFN: 1333518): Replace existing superstructure and upgrade guardrail on approaches. | Grouped Project | 30/06/2024 | 2024 | CO | Local Programs | 393.750 | |
119321 | Ohio | Warren | Ohio Rail Development Commission | WAR Western Row Rd IORY | WAR Western Row Road, City of Mason, at the Indiana and Ohio Railway Company DOT#525242X | Installation of lights, gates and grade crossing surface reconstruction at the Indiana and Ohio Railway Company DOT #525242X. Installation will include any ancillary work to make warning devices funct | Grouped Project | 30/06/2024 | 2024 | DD | Rail | 10.000 | |
119321 | Ohio | Warren | Ohio Rail Development Commission | WAR Western Row Rd IORY | WAR Western Row Road, City of Mason, at the Indiana and Ohio Railway Company DOT#525242X | Installation of lights, gates and grade crossing surface reconstruction at the Indiana and Ohio Railway Company DOT #525242X. Installation will include any ancillary work to make warning devices funct | Grouped Project | 30/06/2024 | 2024 | CO | Rail | 275.000 | |
119679 | Ohio | Clermont | DISTRICT 8 TRAFFIC | D8 Batavia/Blanchester RRFB FY24 | Village of Blanchester and Village of Batavia | In Blanchester, purchase a rectangular rapid-flashing beacon (RRFB) at E Baldwin St/N Grove St and mid-block SR-123 at the UDF. (2 locations)In Batavia, purchase a RRFB at mid-block Main St at the UDF | Grouped Project | 30/06/2024 | 2024 | OTH | Safety | 100.728 | |
119821 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Whitewater Twp | HAM Whitewater Twp | Township safety sign grant to combat run off the road and intersection crashes. | Grouped Project | 30/06/2024 | 2024 | CO | Safety | 18.877 | |
120557 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE Pierce Twp | CLE Pierce Twp | Township safety sign grant to combat run off the road and intersection crashes. | Grouped Project | 30/06/2024 | 2024 | CO | Safety | 41.332 | |
120570 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 42 Sharonville Sig Timing | Kemper Rd. to Field Ertel Rd. | Signal timing along US-42 in Hamilton County | Grouped Project | 30/06/2024 | 2024 | OTH | Safety | 40.085 | |
120840 | Ohio | Warren | Ohio Rail Development Commission | WAR US Highway 42 LMMV | WAR US Highway 42, City of Lebanon, at the Lebanon Mason Monroe Railroad grade crossing DOT #525223T | Installation of flashing lights and roadway gates, with a new roadway surface at the Lebanon Mason Monroe Railroad grade crossing DOT # 525223T. Installation will include any ancillary work to make wa | Grouped Project | 30/06/2024 | 2024 | CO | Rail | 351.000 | |
120840 | Ohio | Warren | Ohio Rail Development Commission | WAR US Highway 42 LMMV | WAR US Highway 42, City of Lebanon, at the Lebanon Mason Monroe Railroad grade crossing DOT #525223T | Installation of flashing lights and roadway gates, with a new roadway surface at the Lebanon Mason Monroe Railroad grade crossing DOT # 525223T. Installation will include any ancillary work to make wa | Grouped Project | 30/06/2024 | 2024 | DD | Rail | 9.000 | |
120945 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 28 Signal Timing | Mclelland Rd. to SR-48 | Signal timing analysis along CLE-28 from McClelland Rd to SR-48 | Grouped Project | 30/06/2024 | 2024 | OTH | Safety | 67.075 | |
121056 | Ohio | Clermont | Ohio Rail Development Commission | CLE Loveland Preemption Study | CLE Loveland Preemption Upgrade, Loveland, Ohio at the Indiana and Ohio River Railraod grade crossin | Preliminary study to determine if the upgrade of the preemption equipment at East Loveland Avenue, CR 48 / Second Street, and East Broadway Street can be interconnected for preemption, with the new pe | Grouped Project | 30/06/2024 | 2024 | ENV | Rail | 40.000 | |
1802970 | Indiana | Dearborn | INDOT | I-74 | W of SR 46 at Blue Creek | Small Structure Replacement | Grouped project | 30/06/2024 | 2024 | CO | NHPP | 2.280.600 | |
1802970 | Indiana | Dearborn | INDOT | I-74 | W of SR 46 at Blue Creek | Small Structure Replacement | Grouped project | 30/06/2024 | 2024 | CO | State | 253.400 | |
1900348 | Indiana | Dearborn | INDOT | SR 1 | 4.5 miles north of the junction with US 50 | Slide Correction | maintenance/reconstruction | 30/06/2024 | 2022 | RW | STBG | 40.000 | |
1900348 | Indiana | Dearborn | INDOT | SR 1 | 4.5 miles north of the junction with US 50 | Slide Correction | maintenance/reconstruction | 30/06/2024 | 2022 | RW | State | 10.000 | |
1900348 | Indiana | Dearborn | INDOT | SR 1 | 4.5 miles north of the junction with US 50 | Slide Correction | maintenance/reconstruction | 30/06/2024 | 2023 | CO | STBG | 1.392.000 | |
1900348 | Indiana | Dearborn | INDOT | SR 1 | 4.5 miles north of the junction with US 50 | Slide Correction | maintenance/reconstruction | 30/06/2024 | 2023 | CO | State | 348.000 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2021 | PE | STBG | 240.000 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2021 | PE | State | 60.000 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2023 | RW | STBG | 24.000 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2023 | RW | State | 6.000 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2024 | CO | STBG | 1.085.600 | |
2002409 | Indiana | Dearborn | INDOT | SR 1 | At the intersection of SR 1 and Schuman Road | Intersection improvement with added turn lanes | traffic operations/safety | 30/06/2024 | 2024 | CO | State | 271.400 | |
2200183 | Indiana | Dearborn | Dearborn County | Dearborn County Small Structure Inventory | Various locations within Dearborn County | Inspect and load rate all Dearborn County maintained drainage structures from 4 ft. to 20 ft., to determine weight limit postings and identify maintenance and replacement needs | maintenance/reconstruction | 30/06/2024 | 2024 | PE | OKI-STBG | 220.000 | |
2200183 | Indiana | Dearborn | Dearborn County | Dearborn County Small Structure Inventory | Various locations within Dearborn County | Inspect and load rate all Dearborn County maintained drainage structures from 4 ft. to 20 ft., to determine weight limit postings and identify maintenance and replacement needs | maintenance/reconstruction | 30/06/2024 | 2024 | PE | Local | 55.000 | |
117502 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM CR 70 0.05 Beerman Rd Bridge | Bridge HAM-CR 70-0.05 (SFN: 3130754) which carries Beerman Road over a tributary to Brierly Creek | Bridge HAM CR 70 0.05 (SFN: 3130754): Replace superstructure, bridge waterproofing, drip strip. | Grouped Project | 10/07/2024 | 2024 | RW | Local Programs | 16.484 | |
117502 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM CR 70 0.05 Beerman Rd Bridge | Bridge HAM-CR 70-0.05 (SFN: 3130754) which carries Beerman Road over a tributary to Brierly Creek | Bridge HAM CR 70 0.05 (SFN: 3130754): Replace superstructure, bridge waterproofing, drip strip. | Grouped Project | 10/07/2024 | 2024 | CO | Local Programs | 176.000 | |
120546 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM Various Guardrail FY 24 | various County Roads | Install new and upgrade existing guardrail on various county roads. | Grouped Project | 10/07/2024 | 2024 | CO | Local | 29.700 | |
120546 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM Various Guardrail FY 24 | various County Roads | Install new and upgrade existing guardrail on various county roads. | Grouped Project | 10/07/2024 | 2024 | CO | Local Programs | 297.000 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2022 | RW | STBG | 2.928.000 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2022 | RW | State | 732.000 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2023 | UT | STBG | 3.288.000 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2023 | UT | State | 822.000 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2024 | CO | STBG | 10.928.456 | |
6-162.10 | Kentucky | Kenton | KYTC | KY 1303 | KY 536 to Beechgrove Elementary | Reconstruct and widen to four lanes and center turn lane (toll credits as match) | widening/relocation | 31/07/2024 | 2024 | CO | State | 2.732.114 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2025 | DBT | OKI-STBG | 864.719 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2024 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2023 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2022 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2021 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2020 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2019 | DBT | OKI-STBG | 1.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2017 | DBT | OKI-STBG | 2.000.000 | |
77628 | Ohio | Hamilton | OKI | IR 71 | I-71 Interchange @ MLK | SIB Loan Debt Service | debt service | 09/08/2024 | 2018 | DBT | OKI-STBG | 1.000.000 | |
115277 | Ohio | Hamilton | City of Cincinnati | HAM VAR CTCS OTR West End | West End, Queensgate, Pendleton and OTR neighborhoods | Establish a fiber optic communications platform to interconnect traffic signals. Includes underground duct bank, fiber cable, network communications, traffic signal controllers for adaptive system. | ITS | 21/08/2024 | 2025 | CO | OKI-CMAQ | 6.600.000 | |
115277 | Ohio | Hamilton | City of Cincinnati | HAM VAR CTCS OTR West End | West End, Queensgate, Pendleton and OTR neighborhoods | Establish a fiber optic communications platform to interconnect traffic signals. Includes underground duct bank, fiber cable, network communications, traffic signal controllers for adaptive system. | ITS | 21/08/2024 | 2025 | CO | Local | 6.724.195 | |
113605 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 232 1.80 | CLE-232-0180 | Rehabilitate structure CLE-232-0180 which carries SR 232 over a tributary of Colcaster Run by sliplining the conduit and replacing the inlet headwall. | Grouped Project | 20/09/2024 | 2024 | RW | State | 25.000 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2022 | D | OKI-TA | 16.000 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2022 | D | Local | 4.000 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2022 | D-SF | OKI-TA | 5.000 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2022 | D-SF | State | 1.000 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2024 | CO | OKI-TAP | 53.800 | |
6-3029 | Kentucky | Boone | City of Union | Union Sweet Harmony Sidewalk | Along Sweet Harmony Lane from US 42 to entrance of Union Fire Department | Install new sidewalk | bicycle/pedestrian/other | 23/09/2024 | 2024 | CO | Local | 13.450 | |
6-3225 | Kentucky | Boone | Boone County | KY 237 Multi-Use Path Phase 2 | East of KY 237 from KY20 to Medical Arts Drive | New 4700' of 10' MUP | bicycle/pedestrian/other | 02/10/2024 | 2020 | D | TAP | 100.000 | |
6-3225 | Kentucky | Boone | Boone County | KY 237 Multi-Use Path Phase 2 | East of KY 237 from KY20 to Medical Arts Drive | New 4700' of 10' MUP | bicycle/pedestrian/other | 02/10/2024 | 2020 | D-SF | TAP | 10.000 | |
6-3225 | Kentucky | Boone | Boone County | KY 237 Multi-Use Path Phase 2 | East of KY 237 from KY20 to Medical Arts Drive | New 4700' of 10' MUP | bicycle/pedestrian/other | 02/10/2024 | 2024 | CO | TAP | 316.000 | |
6-3225 | Kentucky | Boone | Boone County | KY 237 Multi-Use Path Phase 2 | East of KY 237 from KY20 to Medical Arts Drive | New 4700' of 10' MUP | bicycle/pedestrian/other | 02/10/2024 | 2024 | CO | Local | 79.000 | |
107927 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE Culverts FY25 | CLE-52, CLE-743 and CLE-756 | Pave inverts for small culverts: CLE-52-1000; CLE-756-0056, CLE-743-0532, CLE-743-0158, CLE-743-0149, and CLE-743-0139. Sockline CLE-756-0877 and CLE-756-0068. Replace CLE-743-0195 and install CIP wa | Grouped Project | 04/10/2024 | 2024 | RW | State | 25.000 | |
118051 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 13.90 | I-275 Blue Rock Rd to US-27 | Install median cable barrier on I-275 from Blue Rock Rd to US-27. | Grouped Project | 04/10/2024 | 2025 | CO | Safety | 3.325.762 | |
118051 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 13.90 | I-275 Blue Rock Rd to US-27 | Install median cable barrier on I-275 from Blue Rock Rd to US-27. | Grouped Project | 04/10/2024 | 2025 | CO | Labor | 232.803 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2021 | PE | Local Bridge | 310.400 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2021 | PE | Local | 77.600 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2024 | PE-RWS | Local Bridge | 24.000 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2024 | PE-RWS | Local | 6.000 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | UT | Local Bridge | 31.089 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | UT | Local | 7.773 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | CO | Local Bridge | 1.340.156 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | CO | Local | 335.039 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | CE | Local Bridge | 207.720 | |
1902773 | Indiana | Dearborn | Dearborn County | North Hogan Road Bridge #33 | over Little Hogan Creek, 0.05 miles west of Union Ridge Road | Bridge replacement | bridge/culvert replacement | 04/10/2024 | 2025 | CE | Local | 51.930 | |
119735 | Ohio | Warren | Lebanon, City of | WAR Kingsview Dr Bridge Replace | Kingsview Drive bridge (SFN 8360235), immediately SW of Turtlecreek Road | Replacement of the Kingsview Drive bridge (SFN 8360235) in the City of Lebanon. | Grouped Project | 17/10/2024 | 2025 | CO | Local Programs | 2.000.000 | |
112976 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 4/129 9.30/2.30 | BUT-4-0930 | Repair bridge size twin culvert BUT-4-0930 over Shaffer Creek by repairing deteriorated portions of the metal pipe. Repair bridge size culvert BUT-129-0230 over a tributary to Dry Fork Creek by paving | Grouped Project | 24/10/2024 | 2025 | CO | State | 72.458 | |
114650 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 8.38/9.11 | HAM-74-0838L/R - HAM-74-0911L | Paint bridge HAM-74-0838L/R which carries I-74 over Great Miami River and repair steel for HAM-74-0911L which carries WB I-74 over Wesselman Rd and Taylor Creek | Grouped Project | 24/10/2024 | 2025 | CO | Preservation | 3.832.344 | |
114650 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 8.38/9.11 | HAM-74-0838L/R - HAM-74-0911L | Paint bridge HAM-74-0838L/R which carries I-74 over Great Miami River and repair steel for HAM-74-0911L which carries WB I-74 over Wesselman Rd and Taylor Creek | Grouped Project | 24/10/2024 | 2025 | CO | State | 425.816 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2022 | PE-ENV | State | 52.523 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2022 | PE-DD | State | 9.269 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2022 | RWS | State | 60.000 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2025 | CO | OKI-TA | 109.154 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2025 | CO | Local | 159.345 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2025 | CO | Labor | 31.869 | |
116551 | Ohio | Hamilton | Anderson Twp | HAM CR 358 4.36 | Clough Pike at Endovalley Drive and Juilfs Park | Enhancement of mid-block crossing of Clough Pike, just west of Endovalley Drive at Juilfs Park, including raised median refuge and HAWK signal. Includes 150' of sidewalk on the north side of Clough. | bicycle/pedestrian/other | 24/10/2024 | 2025 | CE | OKI-TA | 10.916 | |
117527 | Ohio | Clermont | ODNR | CLE East Fork Resurfacing FY25 | East Fork Wildlife Area | ODNR project to resurface various roads within East Fork State Wildlife area. | Grouped Project | 24/10/2024 | 2025 | CO | Labor | 51.983 | |
117527 | Ohio | Clermont | ODNR | CLE East Fork Resurfacing FY25 | East Fork Wildlife Area | ODNR project to resurface various roads within East Fork State Wildlife area. | Grouped Project | 24/10/2024 | 2025 | CO | State | 433.190 | |
114606 | Ohio | Hamilton | Hamilton County Engineer | WAR CR 4 3.09 Fields Ertel Rd | Between Snider Road and Wilkens Boulevard | Widen from two to five lanes and new sidewalk. Improve intersection at Wilkens Blvd by extending turn lanes and upgrading signal | widening/relocation | 30/10/2024 | 2025 | CO | OKI-STBG | 5.940.000 | |
114606 | Ohio | Hamilton | Hamilton County Engineer | WAR CR 4 3.09 Fields Ertel Rd | Between Snider Road and Wilkens Boulevard | Widen from two to five lanes and new sidewalk. Improve intersection at Wilkens Blvd by extending turn lanes and upgrading signal | widening/relocation | 30/10/2024 | 2025 | CO | Local | 12.643.931 | |
114606 | Ohio | Hamilton | Hamilton County Engineer | WAR CR 4 3.09 Fields Ertel Rd | Between Snider Road and Wilkens Boulevard | Widen from two to five lanes and new sidewalk. Improve intersection at Wilkens Blvd by extending turn lanes and upgrading signal | widening/relocation | 30/10/2024 | 2025 | CE | Local | 1.300.875 | |
100645 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT US 127 7.48 | BUT US 127: SLM 7.48 to 21.06 | Resurfacing a portion of US 127 in Butler County | Grouped Project | 07/11/2024 | 2025 | CO | State | 1.240.098 | |
105217 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 33.70 | HAM US 50 33.70 - SFN 3104028 | Rehabiltate bridge size culvert HAM-50-3370 over a tributary to the Little Miami River by tuck pointing the mortar, constructing an interior slab, and replacing connecting drainage. | Grouped Project | 07/11/2024 | 2025 | CO | State | 239.910 | |
114209 | Ohio | Clermont | Clermont County T.I.D. | CLE CR 106 3.03 Bridge Replacmnt | Bridge CLE-CR 106-3.03 (SFN: 1359334) | Replacement of Bridge CLE-CR 106-3.03 (SFN: 1359223), which carries Roundbottom Road over Hall Run. | Grouped Project | 12/11/2024 | 2024 | CO | Local Programs | 681.595 | |
114209 | Ohio | Clermont | Clermont County T.I.D. | CLE CR 106 3.03 Bridge Replacmnt | Bridge CLE-CR 106-3.03 (SFN: 1359334) | Replacement of Bridge CLE-CR 106-3.03 (SFN: 1359223), which carries Roundbottom Road over Hall Run. | Grouped Project | 12/11/2024 | 2024 | CO | State | 100.000 | |
6-10006 | Kentucky | Kenton | KYTC | US 25 | Clay Wade Bailey Bridge over the Ohio River, MP 13.587 to 13.976 | Joint replacement and preventative maintenance | Grouped Project | 13/11/2024 | 2024 | CO | BRX | 2.657.420 | |
6-10006 | Kentucky | Kenton | KYTC | US 25 | Clay Wade Bailey Bridge over the Ohio River, MP 13.587 to 13.976 | Joint replacement and preventative maintenance | Grouped Project | 13/11/2024 | 2024 | CO | State | 583.050 | |
6-10007 | Kentucky | Campbell | KYTC | Taylor Southgate Bridge (US 27) | Taylor Southgate Bridge over the Ohio River, MP 22.363 to 22.764 | Safety cable repair and preventative maintenance | Grouped Project | 13/11/2024 | 2024 | CO | BRX | 230.000 | |
6-10007 | Kentucky | Campbell | KYTC | Taylor Southgate Bridge (US 27) | Taylor Southgate Bridge over the Ohio River, MP 22.363 to 22.764 | Safety cable repair and preventative maintenance | Grouped Project | 13/11/2024 | 2024 | CO | State | 66.000 | |
6-10028 | Kentucky | Boone | KYTC | I-275 Bridge over Ohio River | I-275 Bridge over Ohio River | Bridge maintenance | Grouped Project | 13/11/2024 | 2024 | C | Federal Bridge | 3.190.880 | |
6-10028 | Kentucky | Boone | KYTC | I-275 Bridge over Ohio River | I-275 Bridge over Ohio River | Bridge maintenance | Grouped Project | 13/11/2024 | 2024 | C | State | 800.000 | |
6-10035.00 | Kentucky | Campbell | KYTC | IR 471 | I-471 Ohio River Bridge BMP: 4.767 to EMP: 5.013 | Bridge maintenance of I-471 NC at Ohio River | Grouped Project | 13/11/2024 | 2024 | CO | BRZ | 1.908.264 | |
6-10035.00 | Kentucky | Campbell | KYTC | IR 471 | I-471 Ohio River Bridge BMP: 4.767 to EMP: 5.013 | Bridge maintenance of I-471 NC at Ohio River | Grouped Project | 13/11/2024 | 2024 | CO | State | 140.000 | |
6-10036.00 | Kentucky | Campbell | KYTC | IR 471 | I-471 Ohio River Bridge BMP: 4.767 to EMP: 5.013 | Bridge maintenance in Campbell County on I471 at Ohio River | Grouped Project | 13/11/2024 | 2024 | CO | BRX | 1.984.624 | |
6-10036.00 | Kentucky | Campbell | KYTC | IR 471 | I-471 Ohio River Bridge BMP: 4.767 to EMP: 5.013 | Bridge maintenance in Campbell County on I471 at Ohio River | Grouped Project | 13/11/2024 | 2024 | CO | State | 156.250 | |
6-20037 | Kentucky | Kenton | KYTC | IR 275 | from MP 77.759 to 82.505 | Pavement friction treatment | Grouped Project | 13/11/2024 | 2024 | CO | NHPP | 7.389.900 | |
6-20037 | Kentucky | Kenton | KYTC | IR 275 | from MP 77.759 to 82.505 | Pavement friction treatment | Grouped Project | 13/11/2024 | 2024 | CO | State | 1.500.000 | |
6-359 | Kentucky | Kenton | KYTC | KY 17 | Scott Street/Greenup Street and Madison Pike in Covington | Convert Scott Street/Greenup Street (KY 17) one-way couplet to two-way streets and upgrade Madison Pike | traffic operations/safety | 13/11/2024 | 2023 | CO | STBG | 2.930.560 | |
6-359 | Kentucky | Kenton | KYTC | KY 17 | Scott Street/Greenup Street and Madison Pike in Covington | Convert Scott Street/Greenup Street (KY 17) one-way couplet to two-way streets and upgrade Madison Pike | traffic operations/safety | 13/11/2024 | 2023 | CO | State | 500.000 | |
6-40000 | Kentucky | Campbell | KYTC | KY 915 | Bridge over Scafford Creed. BMP: 2.675 to EMP: 2.676 | Bridge replacement on KY-915 over Scafford Creek | Grouped Project | 13/11/2024 | 2024 | CO | Federal | 362.000 | |
6-40000 | Kentucky | Campbell | KYTC | KY 915 | Bridge over Scafford Creed. BMP: 2.675 to EMP: 2.676 | Bridge replacement on KY-915 over Scafford Creek | Grouped Project | 13/11/2024 | 2024 | CO | State | 80.000 | |
6-947.00 | Kentucky | Kenton | KYTC | KY 371 | on KY 371 from MP 2.90 to MP 3.115 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.90 to MP 3.115 in Kenton County, KY. (2022BOP) | Grouped Project | 13/11/2024 | 2024 | CO | HSIP | 113.850 | |
6-947.00 | Kentucky | Kenton | KYTC | KY 371 | on KY 371 from MP 2.90 to MP 3.115 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.90 to MP 3.115 in Kenton County, KY. (2022BOP) | Grouped Project | 13/11/2024 | 2024 | CO | State | 12.400 | |
117015 | Ohio | Hamilton | City of Cincinnati | HAM MR 1044 0.00 Dutch Colony Sidewalk | Between Winton Rd and Windton Ridge Ln | Add 455' of missing sidewalk along Dutch Colony Drive | bicycle/pedestrian/other | 15/11/2024 | 2025 | CO | OKI-TA | 66.818 | |
117015 | Ohio | Hamilton | City of Cincinnati | HAM MR 1044 0.00 Dutch Colony Sidewalk | Between Winton Rd and Windton Ridge Ln | Add 455' of missing sidewalk along Dutch Colony Drive | bicycle/pedestrian/other | 15/11/2024 | 2025 | CO | Local | 116.692 | |
119073 | Ohio | Hamilton | Sycamore Twp | HAM Sycamore Twp Preemption | All traffic signals in Sycamore Township | Installation of preemption at all intersections in Sycamore Township. Currently 44 traffic signals | traffic operations/safety | 18/11/2024 | 2023 | PE-ENV | State | 84.386 | |
119073 | Ohio | Hamilton | Sycamore Twp | HAM Sycamore Twp Preemption | All traffic signals in Sycamore Township | Installation of preemption at all intersections in Sycamore Township. Currently 44 traffic signals | traffic operations/safety | 18/11/2024 | 2023 | PE-DD | State | 14.892 | |
119073 | Ohio | Hamilton | Sycamore Twp | HAM Sycamore Twp Preemption | All traffic signals in Sycamore Township | Installation of preemption at all intersections in Sycamore Township. Currently 44 traffic signals | traffic operations/safety | 18/11/2024 | 2025 | CO | OKI-STBG | 511.143 | |
119073 | Ohio | Hamilton | Sycamore Twp | HAM Sycamore Twp Preemption | All traffic signals in Sycamore Township | Installation of preemption at all intersections in Sycamore Township. Currently 44 traffic signals | traffic operations/safety | 18/11/2024 | 2025 | CO | Local | 209.349 | |
117316 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Culverts FY25 | HAM IR 275 SLM .08; 37.30, 10.91, and 10.95 | project entails to replace the broken back pipe for HAM-275-0008 (1839674); replace broken back and sockline HAM-275-3730 (1987474); pave invert HAM-74-1091 (1867145); install outlet headwall HAM-74-1 | Grouped Project | 21/11/2024 | 2025 | CO | State | 46.009 | |
119986 | Ohio | Butler | City of Hamilton | BUT City of Hamilton EV Charging | City of Hamilton Public Works Buiding (S. Erie Blvd) and Market Street Lot (141 Market St) | Install EV Chargers at two City of Hamilton facilities | other | 21/11/2024 | 2025 | CO | OKI-CRP | 321.135 | |
119986 | Ohio | Butler | City of Hamilton | BUT City of Hamilton EV Charging | City of Hamilton Public Works Buiding (S. Erie Blvd) and Market Street Lot (141 Market St) | Install EV Chargers at two City of Hamilton facilities | other | 21/11/2024 | 2025 | CO | Local | 99.259 | |
119986 | Ohio | Butler | City of Hamilton | BUT City of Hamilton EV Charging | City of Hamilton Public Works Buiding (S. Erie Blvd) and Market Street Lot (141 Market St) | Install EV Chargers at two City of Hamilton facilities | other | 21/11/2024 | 2025 | CE | Local | 11.029 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2022 | PE | Local Bridge | 186.400 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2021 | PE | Local Bridge | 57.360 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2022 | PE | Local | 46.600 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2021 | PE | Local | 14.340 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2023 | RWS | Local Bridge | 33.640 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2023 | RWS | Local | 8.410 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2023 | RW | Local Bridge | 108.000 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2023 | RW | Local | 27.000 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | UT | Local Bridge | 200.000 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | UT | Local | 50.000 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | CO | Local Bridge | 1.062.400 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | CO | Local | 317.170 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | CE | Local Bridge | 160.000 | |
1802885 | Indiana | Dearborn | Dearborn County | Sneakville Road | Bridge #64, 0.53 miles east of Mount Pleasant Road | Bridge replacement | bridge/culvert replacement | 22/11/2024 | 2025 | CE | Local | 40.000 | |
110633 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Inverts FY2025 | Varies- Multiple Locations throughout the District. | Rehabilitate the following bridge size culverts by paving the invert with concrete: HAM-50-2955 US 50 over a tributary to Dick Creek in Fairfax; HAM-75-1710 (I-75 over a trib to Mill Creek); HAM-275-0 | Grouped Project | 12/12/2024 | 2025 | CO | State | 99.230 | |
110633 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Inverts FY2025 | Varies- Multiple Locations throughout the District. | Rehabilitate the following bridge size culverts by paving the invert with concrete: HAM-50-2955 US 50 over a tributary to Dick Creek in Fairfax; HAM-75-1710 (I-75 over a trib to Mill Creek); HAM-275-0 | Grouped Project | 12/12/2024 | 2024 | ENV | State | 28.426 | |
112975 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 8.73 | WAR-350-0873 | Replace bridge WAR-350-0873 over Todd Fork. | Grouped Project | 12/12/2024 | 2025 | CO | Preservation | 2.660.664 | |
112975 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 8.73 | WAR-350-0873 | Replace bridge WAR-350-0873 over Todd Fork. | Grouped Project | 12/12/2024 | 2025 | CO | State | 665.166 | |
114613 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-122-2.70 | Elk Creek Road in Middletown | Construct a single-lane roundabout at SR-122 & Elk Creek Road | Grouped Project | 12/12/2024 | 2025 | CO | Labor | 147.000 | |
114613 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-122-2.70 | Elk Creek Road in Middletown | Construct a single-lane roundabout at SR-122 & Elk Creek Road | Grouped Project | 12/12/2024 | 2025 | CO | Safety | 2.100.000 | |
100804 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM BS FY2025 | Various Bridges on IR 71 in Hamilton County | Bridge Sealing Project to seal mainline bridges on I-71 in Hamilton County. | Grouped Project | 19/12/2024 | 2025 | CO | State | 99.244 | |
102524 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/PRE CHIP FY2025 | BUT-177: SLM 8.89-13.41 + PRE-732: SLM 4.91-9.48 | Chip Sealing in Butler and Preble County in FY2025 | Grouped Project | 19/12/2024 | 2025 | CO | Preservation | 661.472 | |
102524 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/PRE CHIP FY2025 | BUT-177: SLM 8.89-13.41 + PRE-732: SLM 4.91-9.48 | Chip Sealing in Butler and Preble County in FY2025 | Grouped Project | 19/12/2024 | 2025 | CO | State | 165.368 | |
110102 | Ohio | Preble | ODOT SPONSORING AGENCY | PRE/BUT Culverts FY25 | Multiple locations in Butler + Preble County | Pave invert (4) culverts: PRE-35-1540, PRE-70-0083, BUT-129-0447, and BUT-129-0665Replace culvert PRE-40-0902 Jack and bore PRE-127-1135 | Grouped Project | 19/12/2024 | 2024 | RW | State | 20.000 | |
116427 | Ohio | Hamilton | City of Sharonville | HAM VAR Sharonville Signals | CR 266 (Kemper); US 42; CR 272 (Mosteller Road); CR 456 (Reading Road) | Upgrade of traffic signal equipment and communications infrastructure | traffic operations/safety | 19/12/2024 | 2023 | PE-ENV | State | 141.440 | |
116427 | Ohio | Hamilton | City of Sharonville | HAM VAR Sharonville Signals | CR 266 (Kemper); US 42; CR 272 (Mosteller Road); CR 456 (Reading Road) | Upgrade of traffic signal equipment and communications infrastructure | traffic operations/safety | 19/12/2024 | 2024 | PE-DD | State | 24.960 | |
116427 | Ohio | Hamilton | City of Sharonville | HAM VAR Sharonville Signals | CR 266 (Kemper); US 42; CR 272 (Mosteller Road); CR 456 (Reading Road) | Upgrade of traffic signal equipment and communications infrastructure | traffic operations/safety | 19/12/2024 | 2025 | CO | OKI-STBG | 519.930 | |
116427 | Ohio | Hamilton | City of Sharonville | HAM VAR Sharonville Signals | CR 266 (Kemper); US 42; CR 272 (Mosteller Road); CR 456 (Reading Road) | Upgrade of traffic signal equipment and communications infrastructure | traffic operations/safety | 19/12/2024 | 2025 | CO | Local | 457.015 | |
116427 | Ohio | Hamilton | City of Sharonville | HAM VAR Sharonville Signals | CR 266 (Kemper); US 42; CR 272 (Mosteller Road); CR 456 (Reading Road) | Upgrade of traffic signal equipment and communications infrastructure | traffic operations/safety | 19/12/2024 | 2025 | CO | Labor | 74.746 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2024 | PE-DD | Rail Safety | 20.000 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2023 | PE-DD | State | 6.374 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2025 | CO | OKI-TA | 137.501 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2025 | CO | Local | 36.611 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2025 | CO | Federal-RR Xing | 234.119 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2025 | CE | Labor | 31.717 | |
119065 | Ohio | Clermont | City of Loveland | CLE LMST Crossing Signal | LMST crossing on West Loveland Avenue | Install traffic signal | traffic operations/safety | 24/12/2024 | 2025 | CE | OKI-TA | 13.747 | |
121625 | Ohio | Clermont | DISTRICT 8-BRIDGES | CLE SR 32 6.84 | CLE-32-0684 (SR 32 over W. Main Street in Batavia) | Type C Emergency to fix the damaged steel for the CLE-32-0684 (1300326) structure over W. Main Street in Batavia. | Grouped Project | 24/12/2024 | 2025 | CO | State | 300.000 | |
121625 | Ohio | Clermont | DISTRICT 8-BRIDGES | CLE SR 32 6.84 | CLE-32-0684 (SR 32 over W. Main Street in Batavia) | Type C Emergency to fix the damaged steel for the CLE-32-0684 (1300326) structure over W. Main Street in Batavia. | Grouped Project | 24/12/2024 | 2025 | CO | Labor | 21.000 | |
122356 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 8.91 Tree Clearing | Regina Grater Way to. the SR126 interchange, SLM 8.91 to 10.30 | Tree clearing contract for Phase 8C of the Mill Creek Expressway Project. Project extends from Regina Graeter Way to SR 126/Galbraith Rd. area. | Grouped Project | 24/12/2024 | 2025 | PE | State | 15.000 | |
122356 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 8.91 Tree Clearing | Regina Grater Way to. the SR126 interchange, SLM 8.91 to 10.30 | Tree clearing contract for Phase 8C of the Mill Creek Expressway Project. Project extends from Regina Graeter Way to SR 126/Galbraith Rd. area. | Grouped Project | 24/12/2024 | 2025 | CO | Major Programs | 211.200 | |
122356 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 8.91 Tree Clearing | Regina Grater Way to. the SR126 interchange, SLM 8.91 to 10.30 | Tree clearing contract for Phase 8C of the Mill Creek Expressway Project. Project extends from Regina Graeter Way to SR 126/Galbraith Rd. area. | Grouped Project | 24/12/2024 | 2025 | CO | State | 52.800 | |
120595 | Ohio | Hamilton | City of Cincinnati | HAM WHV Q Labs Building Demo | Former Q Labs site, 1400 Harrison Avenue Cincinnati | Western Hills Viaduct - Demolition of the remaining building on the former Q Labs site | bridge/culvert replacement | 21/01/2025 | 2024 | PE | State | 5.491 | |
120595 | Ohio | Hamilton | City of Cincinnati | HAM WHV Q Labs Building Demo | Former Q Labs site, 1400 Harrison Avenue Cincinnati | Western Hills Viaduct - Demolition of the remaining building on the former Q Labs site | bridge/culvert replacement | 21/01/2025 | 2025 | CO | OKI-STBG | 592.000 | |
120595 | Ohio | Hamilton | City of Cincinnati | HAM WHV Q Labs Building Demo | Former Q Labs site, 1400 Harrison Avenue Cincinnati | Western Hills Viaduct - Demolition of the remaining building on the former Q Labs site | bridge/culvert replacement | 21/01/2025 | 2025 | CO | Local | 148.000 | |
120595 | Ohio | Hamilton | City of Cincinnati | HAM WHV Q Labs Building Demo | Former Q Labs site, 1400 Harrison Avenue Cincinnati | Western Hills Viaduct - Demolition of the remaining building on the former Q Labs site | bridge/culvert replacement | 21/01/2025 | 2025 | CE | OKI-STBG | 59.200 | |
120595 | Ohio | Hamilton | City of Cincinnati | HAM WHV Q Labs Building Demo | Former Q Labs site, 1400 Harrison Avenue Cincinnati | Western Hills Viaduct - Demolition of the remaining building on the former Q Labs site | bridge/culvert replacement | 21/01/2025 | 2025 | CE | Local | 14.800 | |
102790 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 1.81 | HAM IR 71 1.81 SFNs 3106632 & 3100774 | Replace the pedestrian bridge HAM-71-0181 over IR-71 and IR-471 that spans from Mt Adams to US22. Replace the pedestrian bridge HAM-22-0111 that spans over US22 (Gilbert Ave). Construct one new shared | Grouped Project | 24/01/2025 | 2024 | RW | State | 911.825 | |
112983 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 4.27 | HAM IR 71 4.27 | Rehabilitate Bridge HAM-71-0427 which carries Blair Ave over I-71 by replacing the expansion joints, sealing the deck and substructure, painting the structural steel, and improving the drainage. Anti | Grouped Project | 24/01/2025 | 2025 | CO | State | 229.495 | |
112983 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 4.27 | HAM IR 71 4.27 | Rehabilitate Bridge HAM-71-0427 which carries Blair Ave over I-71 by replacing the expansion joints, sealing the deck and substructure, painting the structural steel, and improving the drainage. Anti | Grouped Project | 24/01/2025 | 2024 | DD | State | 20.784 | |
114274 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2025 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 24/01/2025 | 2025 | CO | Labor | 78.470 | |
114274 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2025 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 24/01/2025 | 2025 | CO | State | 845.350 | |
116046 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 52 36.85 | HAM US 52: SLM 36.85 - 37.65 | Slide repair on two locations on US 52 in Hamilton County along the Ohio River | Grouped Project | 24/01/2025 | 2024 | DD | State | 222.716 | |
116046 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 52 36.85 | HAM US 52: SLM 36.85 - 37.65 | Slide repair on two locations on US 52 in Hamilton County along the Ohio River | Grouped Project | 24/01/2025 | 2025 | CO | State | 320.000 | |
113009 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/HAM BP FY2025 | Various bridges in Butler and Hamilton County | Project to paint bridge BUT-126-0308 that carries SR 126 over Kiata Creek and Bridge HAM-128-1005 that carries SR 128 over Paddys Run. Other minor bridge repairs will be completed with the project.Las | Grouped Project | 06/02/2025 | 2025 | CO | Preservation | 1.166.940 | |
113009 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/HAM BP FY2025 | Various bridges in Butler and Hamilton County | Project to paint bridge BUT-126-0308 that carries SR 126 over Kiata Creek and Bridge HAM-128-1005 that carries SR 128 over Paddys Run. Other minor bridge repairs will be completed with the project.Las | Grouped Project | 06/02/2025 | 2025 | CO | State | 291.735 | |
114284 | Ohio | District | ODOT SPONSORING AGENCY | D08/D07 Mowing FY2025 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties.District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Grouped Project | 06/02/2025 | 2025 | CO | State | 966.120 | |
117000 | Ohio | Warren | City of Lebanon | WAR Lebanon Bowman Trail | Along old RR, 1.66 miles between Mound Street just south of Main Street up to Monroe Road | Construct new multi-use path. A HAWK beacon will be installed for the mid-block trail crossing on Main Street | bicycle/pedestrian/other | 10/02/2025 | 2022 | PE | State | 11.128 | |
117000 | Ohio | Warren | City of Lebanon | WAR Lebanon Bowman Trail | Along old RR, 1.66 miles between Mound Street just south of Main Street up to Monroe Road | Construct new multi-use path. A HAWK beacon will be installed for the mid-block trail crossing on Main Street | bicycle/pedestrian/other | 10/02/2025 | 2022 | RW | State | 30.000 | |
117000 | Ohio | Warren | City of Lebanon | WAR Lebanon Bowman Trail | Along old RR, 1.66 miles between Mound Street just south of Main Street up to Monroe Road | Construct new multi-use path. A HAWK beacon will be installed for the mid-block trail crossing on Main Street | bicycle/pedestrian/other | 10/02/2025 | 2025 | CO | OKI-TA | 750.000 | |
117000 | Ohio | Warren | City of Lebanon | WAR Lebanon Bowman Trail | Along old RR, 1.66 miles between Mound Street just south of Main Street up to Monroe Road | Construct new multi-use path. A HAWK beacon will be installed for the mid-block trail crossing on Main Street | bicycle/pedestrian/other | 10/02/2025 | 2025 | CO | Local | 1.558.188 | |
118471 | Ohio | Warren | Warren County Engineer | WAR CR 134 3.76 Township Line Rd | Bridge No. WAR-CR 134-3.76 (SFN: 8332991) | Replacement of Bridge WAR-CR 134-3.76 (SFN: 8332991) with a three-sided precast culvert. | Grouped Project | 19/02/2025 | 2025 | CO | State | 576.650 | |
113996 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 22/TR 131 3.89/5.25 | Millikin Road/Lesourdsville West Chester Road intersection | Safety improvement at the Millikin Road/Lesourdsville West Chester Rd intersection. | Grouped Project | 24/02/2025 | 2025 | CO | Local | 242.671 | |
113996 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 22/TR 131 3.89/5.25 | Millikin Road/Lesourdsville West Chester Road intersection | Safety improvement at the Millikin Road/Lesourdsville West Chester Rd intersection. | Grouped Project | 24/02/2025 | 2025 | CO | Local Programs | 1.007.840 | |
117220 | Ohio | Hamilton | SYCAMORE TOWNSHIP OF HAMILTON COUNTY | HAM CR 266 14.97 Kemper Rd | Baen Rd to Snider Rd | Installation of sidewalk, ADA compliant curb ramps, and pedestrian crossings on Kemper Rd. Project to also include upgrading existing traffic signals with pedestrian push buttons and signal heads. | Grouped Project | 24/02/2025 | 2025 | CO | Local | 303.178 | |
117220 | Ohio | Hamilton | SYCAMORE TOWNSHIP OF HAMILTON COUNTY | HAM CR 266 14.97 Kemper Rd | Baen Rd to Snider Rd | Installation of sidewalk, ADA compliant curb ramps, and pedestrian crossings on Kemper Rd. Project to also include upgrading existing traffic signals with pedestrian push buttons and signal heads. | Grouped Project | 24/02/2025 | 2025 | CO | Safety | 768.254 | |
118273 | Ohio | Warren | Waynesville, Village of | WAR US 42 20.23 | US-42 @ Corwin Ave/North St | Installation of new traffic signal at intersection of US-42 and Corwin Ave/North St. Signal to include full radar detection, back plates, pedestrian crossings, LED signal heads intersection lighting, | Grouped Project | 27/02/2025 | 2025 | CO | Local | 103.015 | |
118273 | Ohio | Warren | Waynesville, Village of | WAR US 42 20.23 | US-42 @ Corwin Ave/North St | Installation of new traffic signal at intersection of US-42 and Corwin Ave/North St. Signal to include full radar detection, back plates, pedestrian crossings, LED signal heads intersection lighting, | Grouped Project | 27/02/2025 | 2025 | CO | Safety | 927.137 | |
102749 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 127 11.88 | HAM US 127 11.88 - SFN 3111431 | Rehabilitate Bridge Size Culvert HAM-127-1188 over Tributary to West Fork Mill Creek by patching, Tuck-pointing, epoxy injection, and reconstructing deteriorated portions of the structure including ad | Grouped Project | 03/03/2025 | 2024 | RW | State | 5.000 | |
102749 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 127 11.88 | HAM US 127 11.88 - SFN 3111431 | Rehabilitate Bridge Size Culvert HAM-127-1188 over Tributary to West Fork Mill Creek by patching, Tuck-pointing, epoxy injection, and reconstructing deteriorated portions of the structure including ad | Grouped Project | 03/03/2025 | 2025 | CO | State | 167.266 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CO | Preservation | 14.924.835 | FY25 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CO | State | 1.658.315 | FY25 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CO | Safety | 155.124 | FY25 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CO | State | 17.236 | FY25 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CE | Federal | 603.198 | FY25 | |
100561 | Ohio | Warren | ODOT | CLI/GRE IR 71 10.57/0.00 | CLI IR 71:SLM 10.57-15.39 & GRE IR 71:0-4.01. Also a ramp at WAR 71 + WAR-48 | Resurfacing a portion of IR 71 and ramp at IR 71 and SR 48 | maintenance/reconstruction | 2025 | CE | State | 67.022 | FY25 | |
100650 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 73 7.20 | WAR SR 73: SLM 7.20-20.05 | Resurfacing a portion of SR 73 in Warren County and adding left turn lane on SB SR-73 at Old SR-73 intersection. | Grouped Project | 2026 | CO | State | 330.323 | ||
102551 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 123 9.76 | WAR-123: SLM 9.76-14.78 | Chip sealing a portion of SR 123 in Warren County | Grouped Project | 2026 | CO | Preservation | 364.496 | ||
102551 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 123 9.76 | WAR-123: SLM 9.76-14.78 | Chip sealing a portion of SR 123 in Warren County | Grouped Project | 2026 | CO | State | 91.124 | ||
102753 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE IR 275 0.43 | CLE IR 275 0043 - SFN 1305352 | Replace the deck, bearings, and paint of bridge CLE-275-0043 that carries Branch Hill Miamiville Road over I-275 ; Design will be under the PID 110563 project. ELLIS schedule adjusted to match PID 11 | Grouped Project | 2026 | CO | Preservation | 3.044.664 | ||
102753 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE IR 275 0.43 | CLE IR 275 0043 - SFN 1305352 | Replace the deck, bearings, and paint of bridge CLE-275-0043 that carries Branch Hill Miamiville Road over I-275 ; Design will be under the PID 110563 project. ELLIS schedule adjusted to match PID 11 | Grouped Project | 2026 | CO | State | 338.296 | ||
102771 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 48/132 6.62/17.76 | CLE SR 48/132 6.62/17.76 SFNs 1300709 & 1302981 | Rehabilitate Bridge CLE-48-6.62 which carries SR 48 over O'Bannon Creek by installing a concrete overlay and installing polymer modified ashpalt expansion joints. Rehabiltate bridge CLE-132-1776 which | Grouped Project | 2026 | CO | State | 422.076 | ||
102885 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 10.88 | HAM IR 75 between SLM 10.88 - 12.67 | Resurfacing on a portion of IR 75 in Hamilton County. | Grouped Project | 2026 | CO | Preservation | 5.159.745 | ||
102885 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 10.88 | HAM IR 75 between SLM 10.88 - 12.67 | Resurfacing on a portion of IR 75 in Hamilton County. | Grouped Project | 2026 | CO | State | 573.305 | ||
105158 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE CHIP FY2026 | CLE US 52: SLM 16.64 - 25.49 | Chip sealing a portion of US 52 in Clermont County. Includes patching of bridge wearing surface CLE-52-2346. | Grouped Project | 2026 | CO | Preservation | 611.664 | ||
105158 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE CHIP FY2026 | CLE US 52: SLM 16.64 - 25.49 | Chip sealing a portion of US 52 in Clermont County. Includes patching of bridge wearing surface CLE-52-2346. | Grouped Project | 2026 | CO | State | 152.916 | ||
105204 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 11.30 | HAM SR 126: SLM 11.38-15.68 | Pavement repairs on a portion of SR 126 (Cross County) in Hamilton County | Grouped Project | 2025 | CO | Preservation | 2.577.680 | ||
105204 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 11.30 | HAM SR 126: SLM 11.38-15.68 | Pavement repairs on a portion of SR 126 (Cross County) in Hamilton County | Grouped Project | 2025 | CO | State | 644.420 | ||
105206 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 73 9.90 | BUT US 73 SLM 9.90 to 14.66 | Resurfacing portions of SR 73 in Butler County. | Grouped Project | 2026 | CO | State | 406.615 | ||
105208 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 8.95 | CLE-125: SLM 8.95-15.11 | Resurfacing a portion of SR 125 in Clermont County. | Grouped Project | 2026 | CO | Preservation | 2.361.656 | ||
105208 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 8.95 | CLE-125: SLM 8.95-15.11 | Resurfacing a portion of SR 125 in Clermont County. | Grouped Project | 2026 | CO | State | 590.414 | ||
105216 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 4/SR 747 6.02/0.00 | HAM SR 4 SLM 6.02-8.33 and HAM SR 747 SLM 0-0.88 | Resurfacing on a section of SR 4 and SR 747 in Hamilton County. | Grouped Project | 2026 | CO | State | 226.712 | ||
105220 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 5.05 | HAM IR 71 5.05 - SFN 3114600 | Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. The rehabilitation will include painting the structural steel, patching the substructure, sealing the dec | Grouped Project | 2026 | CO | Preservation | 1.286.262 | ||
105220 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 5.05 | HAM IR 71 5.05 - SFN 3114600 | Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. The rehabilitation will include painting the structural steel, patching the substructure, sealing the dec | Grouped Project | 2026 | CO | State | 142.918 | ||
105221 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Grouped Project | 2027 | CO | Preservation | 1.115.760 | ||
105221 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Grouped Project | 2027 | CO | State | 278.940 | ||
105284 | Ohio | Warren | ODOT SPONSORING AGENCY | CLE SR 28 1.17 | CLE SR 28: SLM 1.17-12.21 | Resurfacing on portions of SR 28 in Clermont County | Grouped Project | 2027 | CO | State | 820.804 | ||
105300 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75 5.52 | BUT IR 75: SLM 5.52-7.13 | Resurfacing a portion of IR 75 in Butler County | Grouped Project | 2027 | CO | Preservation | 1.486.350 | ||
105300 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75 5.52 | BUT IR 75: SLM 5.52-7.13 | Resurfacing a portion of IR 75 in Butler County | Grouped Project | 2027 | CO | State | 165.150 | ||
105314 | Ohio | Hamilton | City of Cincinnati | HAM WHV Western Approach | Western approach to the Western Hills Viaduct (roughly from Moellering Avenue to State Avenue) | Western Hills Viaduct (WHV) Phase 1: Removal of the western plaza, filling and grading the western approach. This includes federally funded early acquisition of ROW, independent of construction | bridge/culvert replacement | 2017 | RW | OKI-STBG | 2.986.520 | FY25 | |
105314 | Ohio | Hamilton | City of Cincinnati | HAM WHV Western Approach | Western approach to the Western Hills Viaduct (roughly from Moellering Avenue to State Avenue) | Western Hills Viaduct (WHV) Phase 1: Removal of the western plaza, filling and grading the western approach. This includes federally funded early acquisition of ROW, independent of construction | bridge/culvert replacement | 2017 | RW | Local | 1.270.000 | FY25 | |
105314 | Ohio | Hamilton | City of Cincinnati | HAM WHV Western Approach | Western approach to the Western Hills Viaduct (roughly from Moellering Avenue to State Avenue) | Western Hills Viaduct (WHV) Phase 1: Removal of the western plaza, filling and grading the western approach. This includes federally funded early acquisition of ROW, independent of construction | bridge/culvert replacement | 2020 | RW | TRAC | 520.000 | FY25 | |
105314 | Ohio | Hamilton | City of Cincinnati | HAM WHV Western Approach | Western approach to the Western Hills Viaduct (roughly from Moellering Avenue to State Avenue) | Western Hills Viaduct (WHV) Phase 1: Removal of the western plaza, filling and grading the western approach. This includes federally funded early acquisition of ROW, independent of construction | bridge/culvert replacement | 2020 | RW | Local | 130.000 | FY25 | |
105314 | Ohio | Hamilton | City of Cincinnati | HAM WHV Western Approach | Western approach to the Western Hills Viaduct (roughly from Moellering Avenue to State Avenue) | Western Hills Viaduct (WHV) Phase 1: Removal of the western plaza, filling and grading the western approach. This includes federally funded early acquisition of ROW, independent of construction | bridge/culvert replacement | 2021 | RW | OKI-STBG | 2.093.480 | FY25 | |
105315 | Ohio | Hamilton | City of Cincinnati | HAM WHV Eastern Approach | Eastern approach to the Western Hills Viaduct (roughly Spring Grove Avenue to Central Parkway) | Western Hills Viaduct, eastern approach phase. | bridge/culvert replacement | 2024 | RW | Major New | 5.072.000 | FY25 | |
105315 | Ohio | Hamilton | City of Cincinnati | HAM WHV Eastern Approach | Eastern approach to the Western Hills Viaduct (roughly Spring Grove Avenue to Central Parkway) | Western Hills Viaduct, eastern approach phase. | bridge/culvert replacement | 2024 | RW | Local | 1.268.000 | FY25 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2018 | PE | Federal | 2.399.952 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2018 | PE | State | 438.459 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2024 | PE-ENV | Local Programs | 11.634.297 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2024 | PE-ENV | Local | 2.908.574 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2024 | PE-ENV | Federal | 1.000.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2024 | PE-ENV | Local | 250.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2025 | PE-DD | Major New | 4.247.295 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2026 | PE-DD | Local Programs | 3.102.624 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2025 | PE-DD | Local | 1.061.824 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2026 | PE-DD | Local | 163.296 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2025 | RW | Local Programs | 946.497 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2023 | RW | OKI-STBG | 7.712.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2025 | RW | OKI-STBG | 184.705 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2023 | RW | Local | 1.928.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2025 | RW | Local | 282.801 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2027 | CO | Major New | 25.000.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2027 | CO | Local Programs | 5.000.000 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2027 | CO | Federal Discretionary | 127.115.954 | FY27 | |
105349 | Ohio | Hamilton | City of Cincinnati | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along | Western Hills Viaduct (WHV) construction. Construct new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway | bridge/culvert replacement | 2027 | CO | Local | 334.523.426 | FY27 | |
105472 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Insp FY23/24 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpi | Grouped Project | 2024 | OTH | State | 169.310 | ||
105473 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Insp FY25/26 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpi | Grouped Project | 2025 | OTH | State | 200.000 | ||
105473 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Insp FY25/26 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpi | Grouped Project | 2026 | OTH | State | 150.000 | ||
105502 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM LG FY2027 | Various locations in Hamilton County | Lighting replacements on Interstates inside the City of Cincinnati on IR-71 from the Ohio River to MLK. | Grouped Project | 2025 | DD | State | 300.000 | ||
105502 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM LG FY2027 | Various locations in Hamilton County | Lighting replacements on Interstates inside the City of Cincinnati on IR-71 from the Ohio River to MLK. | Grouped Project | 2027 | CO | State | 2.000.000 | ||
107602 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Grouped Project | 2026 | CO | Preservation | 2.249.064 | ||
107602 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Grouped Project | 2026 | CO | State | 562.266 | ||
109702 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 7.71 | CLE-32: SLM 7.71-16.44 | Resurfacing a portion of SR 32 in Clermont County. | Grouped Project | 2027 | CO | Preservation | 9.297.144 | ||
109702 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 7.71 | CLE-32: SLM 7.71-16.44 | Resurfacing a portion of SR 32 in Clermont County. | Grouped Project | 2027 | CO | State | 2.324.286 | ||
110008 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 6.85 | HAM SR 126: SLM 6.85 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Grouped Project | 2026 | CO | State | 736.218 | ||
110008 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 6.85 | HAM SR 126: SLM 6.85 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Grouped Project | 2026 | CO | Preservation | 2.944.872 | ||
110046 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 0.00 | CLE SR 125: SLM 0 - 5.33 | Resurfacing a portion of SR 125 in Clermont County | Grouped Project | 2027 | CO | Preservation | 4.191.856 | ||
110046 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 125 0.00 | CLE SR 125: SLM 0 - 5.33 | Resurfacing a portion of SR 125 in Clermont County | Grouped Project | 2027 | CO | State | 1.047.964 | ||
110110 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 2.26/2.94/3.44 | HAM-71-3.34 - SFN 3114325 | Rehabilitate bridges HAM-71-0226 that carries Elsinore Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that | Grouped Project | 2027 | CO | Preservation | 3.942.900 | ||
110110 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 2.26/2.94/3.44 | HAM-71-3.34 - SFN 3114325 | Rehabilitate bridges HAM-71-0226 that carries Elsinore Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that | Grouped Project | 2027 | CO | State | 438.100 | ||
110497 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 0.00 | WAR-350: SLM 0.00 -7.90 | Resurfacing a portion of SR 350 in Warren County | Grouped Project | 2027 | CO | Preservation | 1.943.392 | ||
110497 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 0.00 | WAR-350: SLM 0.00 -7.90 | Resurfacing a portion of SR 350 in Warren County | Grouped Project | 2027 | CO | State | 485.848 | ||
110539 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 7.05 | HAM-74 SLM 7.05 to 11.16 | Resurfacing a portion of I-74 in Hamilton County, including minor bridge work such as deck sealing, expansion joint repairs, and drilling of fatigue cracks. | Grouped Project | 2026 | CO | State | 1.269.200 | ||
110543 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 744 5.35 | BUT-744 SLM 5.35 - 9.83 | Resurfacing a portion of SR 744 in Butler County | Grouped Project | 2027 | CO | Preservation | 1.681.976 | ||
110543 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 744 5.35 | BUT-744 SLM 5.35 - 9.83 | Resurfacing a portion of SR 744 in Butler County | Grouped Project | 2027 | CO | State | 420.494 | ||
110563 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 13.35 | HAM-74-13.34 - SFN 3108678 | Replace Bridge HAM-74-1335 (Race Road over I-74). Raise profile as necessary. ELLIS schedule matches companion PID 102753 | Grouped Project | 2024 | RW | State | 103.200 | ||
110566 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 128 0.29 | BUT-128-0029 | Rehabilitate bridge over Dry Run to replace superstructure pier caps, abutment seats, and to protect pier piles. | Grouped Project | 2026 | CO | Preservation | 1.262.128 | ||
110566 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 128 0.29 | BUT-128-0029 | Rehabilitate bridge over Dry Run to replace superstructure pier caps, abutment seats, and to protect pier piles. | Grouped Project | 2026 | CO | State | 315.532 | ||
110682 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 8.05 | CLE-133-0805 - SFN 1303155 | Rehabilitate Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek, by lining the pipes and replacing the outlet headwall. | Grouped Project | 2024 | RW | State | 20.000 | ||
110682 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 8.05 | CLE-133-0805 - SFN 1303155 | Rehabilitate Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek, by lining the pipes and replacing the outlet headwall. | Grouped Project | 2026 | CO | State | 110.000 | ||
112353 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08 PO FY2024 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2024. | Grouped Project | 2024 | OTH | State | 52.000 | ||
112413 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 3.33 | Resurfacing a portion of IR 71 in Warren County | Grouped Project | 2027 | CO | Preservation | 9.765.378 | ||
112413 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 3.33 | Resurfacing a portion of IR 71 in Warren County | Grouped Project | 2027 | CO | State | 1.085.042 | ||
112554 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 122 0.00 | BUT SR 122: SLM 0-6.55 | Resurfacing a portion of SR 122 in Butler County | Grouped Project | 2026 | CO | State | 238.988 | ||
112587 | Ohio | District | ODOT SPONSORING AGENCY | D08 CS FY2026 | TBD | District wide crack sealing in FY2026 | Grouped Project | 2026 | CO | Preservation | 600.000 | ||
112587 | Ohio | District | ODOT SPONSORING AGENCY | D08 CS FY2026 | TBD | District wide crack sealing in FY2026 | Grouped Project | 2026 | CO | State | 150.000 | ||
112773 | Ohio | District | ODOT SPONSORING AGENCY | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New | Grouped Project | 2026 | RW | State | 85.000 | ||
112773 | Ohio | District | ODOT SPONSORING AGENCY | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New | Grouped Project | 2026 | RW | Preservation | 500.000 | ||
112977 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 122 0650R | BUT-122-0650R | Rehabilitate bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. | Grouped Project | 2024 | ENV | State | 50.000 | ||
112977 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 122 0650R | BUT-122-0650R | Rehabilitate bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. | Grouped Project | 2026 | CO | State | 234.000 | ||
112985 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 52 1.59/4.98 | CLE US 52 1.59 L/R | Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. Rehabilitate CLE-52-0498L/R that carries US 52 over Tw | Grouped Project | 2024 | DD | State | 199.993 | ||
112985 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 52 1.59/4.98 | CLE US 52 1.59 L/R | Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. Rehabilitate CLE-52-0498L/R that carries US 52 over Tw | Grouped Project | 2027 | CO | State | 794.400 | ||
112988 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Va | Grouped Project | 2024 | DD | State | 176.403 | ||
112988 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Va | Grouped Project | 2026 | DD | Labor | 24.960 | ||
112991 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 VAR | HAM IR 126 | Paint or Zone Paint several bridges on SR 126 in Cincinnati, Reading and Blue Ash. | Grouped Project | 2026 | CO | State | 1.030.556 | ||
112991 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 VAR | HAM IR 126 | Paint or Zone Paint several bridges on SR 126 in Cincinnati, Reading and Blue Ash. | Grouped Project | 2026 | CO | Preservation | 4.122.224 | ||
113002 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE Culverts FY26 | varies | Pave invert CLE-132-1521. Replace culvert CLE-222-1312 | Grouped Project | 2026 | CO | State | 35.400 | ||
113002 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE Culverts FY26 | varies | Pave invert CLE-132-1521. Replace culvert CLE-222-1312 | Grouped Project | 2025 | RW | State | 30.000 | ||
113004 | Ohio | District | DISTRICT 8-BRIDGES | D08 Bridge Underwater Insp FY25 | Varies- Several bridges over Great Miami, Little Miami and Whitewater Rivers | Project to inspect various bridges over larger waterways that have piers in the water and require underwater dive inspections. | Grouped Project | 2024 | OTH | State | 425.000 | ||
113005 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 132 12.64 | CLE SR 132 12.64 | Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the expansion joints, painting the structural steel, overlaying the superstructure, and performing other rela | Grouped Project | 2026 | CO | Preservation | 672.824 | ||
113005 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 132 12.64 | CLE SR 132 12.64 | Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the expansion joints, painting the structural steel, overlaying the superstructure, and performing other rela | Grouped Project | 2026 | CO | State | 168.206 | ||
113006 | Ohio | District | ODOT SPONSORING AGENCY | D08 Bridge Maintenance FY2026 | Various locations in D8 | Bridge Maintenance Project to perform minor maintenance bridge repairs. | Grouped Project | 2024 | DD | State | 97.233 | ||
113006 | Ohio | District | ODOT SPONSORING AGENCY | D08 Bridge Maintenance FY2026 | Various locations in D8 | Bridge Maintenance Project to perform minor maintenance bridge repairs. | Grouped Project | 2026 | CO | State | 49.506 | ||
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2023 | PE-DD | Federal | 1.654.503 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2022 | PE-DD | Federal | 6.016.932 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2024 | PE-DD | Federal | 1.708.482 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2025 | PE-DD | State | 7.008.130 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2024 | PE-DD | State | 427.120 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2022 | PE-DD | State | 4.404.078 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2023 | PE-DD | State | 413.626 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2026 | RW | State | 4.300.000 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | State | 98.095.673 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | Major Programs | 88.008.640 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | NH Freight | 45.000.000 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | State | 49.177.160 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | Local | 12.814.200 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CE | Federal | 10.928.000 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CE | State | 16.382.000 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | OKI-STBG | 8.000.000 | FY30 | |
113361 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Work on mainline 75 from Linn to north of Ezzard Charles. Ezzard Charles reconstruction, Freeman overpass. Work on Western Av, Gest St, and Winchell Av. Part of Ph2 of BSB Corridor Project. | maintenance/reconstruction | 2030 | CO | Local | 8.000.000 | FY30 | |
113464 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction o | Grouped Project | 2025 | PE | State | 7.131 | ||
113464 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction o | Grouped Project | 2024 | RW | State | 660.000 | ||
113464 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction o | Grouped Project | 2024 | OTH | State | 57.600 | ||
113464 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction o | Grouped Project | 2026 | CO | Preservation | 410.058 | ||
113464 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction o | Grouped Project | 2026 | CO | State | 90.924 | ||
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2022 | PE-ENV | Major Programs | 202.678 | UNSC | |
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2022 | PE-ENV | State | 50.667 | UNSC | |
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2025 | PE-DD | Major Programs | 99.826 | UNSC | |
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2025 | PE-DD | State | 24.957 | UNSC | |
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2025 | RW | Uncommitted | 125.000 | UNSC | |
113600 | Ohio | Hamilton | ODOT | HAM Colbank Rd | Intersection of Red Bank and Colbank in the Village of Fairfax | Intersection improvement (Alternative E1) | traffic operations/safety | 2025 | CO | Uncommitted | 1.188.413 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | PE-ENV | Major Programs | 200.000 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | PE-ENV | State | 50.000 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | PE-DD | Major Programs | 80.000 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | PE-DD | State | 20.000 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | RW | Uncommitted | 275.000 | UNSC | |
113601 | Ohio | Hamilton | ODOT | HAM SR 32 0.39 | Intersection at Wilmer/Wooster | Construct intersection improvement at Wilmer/Wooster to create a safe pedestrian crossing between bus stops (Original Alternative was D5) | traffic operations/safety | 2025 | CO | Uncommitted | 1.100.000 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2022 | PE-ENV | Major Programs | 480.000 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2022 | PE-ENV | State | 120.000 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2025 | PE-DD | Major Programs | 275.302 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2025 | PE-DD | State | 68.825 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2025 | RW | Uncommitted | 1.382.500 | UNSC | |
113603 | Ohio | Hamilton | ODOT | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | bicycle/pedestrian/other | 2025 | CO | Uncommitted | 7.040.000 | UNSC | |
113628 | Ohio | Warren | Mason, City of | WAR New Roadway by Mason | Construction of a new road from US42 west into the new Campus in North Mason | Construction of new roadway to access industrial park | Grouped Project | 2024 | CO | State | 200.000 | ||
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2021 | PE-ENV | Local | 112.500 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2021 | PE-ENV | State | 37.500 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2023 | PE-ENV | State | 200.000 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2023 | PE-ENV | Major Programs | 800.000 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2024 | PE-RWS | Major Programs | 130.420 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2024 | PE-RWS | State | 32.605 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2025 | PE-DD | Major Programs | 400.000 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2025 | PE-DD | State | 100.000 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2025 | RW | Major Programs | 7.069.580 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2025 | RW | State | 1.767.395 | UNSC | |
113647 | Ohio | Butler | Butler County TID | BUT IR 75 8.50 | In the area of I-75 & Millikin Road in Liberty Twp | Evaluate and implement transportation improvements including new full I-75 interchange in the vicinity of Millikin Rd and associated I-75 widening | widening/relocation | 2028 | CO | Uncommitted | 50.290.000 | UNSC | |
113687 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 10.45 | Various Locations in the TTV area | The purpose of this non-let study is to complete an alternative evaluation report (AER) to further evaluate a TTV alternate called Alternative 1 to enable ODOT to make a decision between proceeding wi | Grouped Project | 2024 | OTH | State | 209.354 | ||
113722 | Ohio | Warren | Warren County TID | WAR CR 38 1.15 | Mason Morrow Millgrove Road west of Columbia Road North | Realign Mason Morrow Millgrove Road west of Columbia Road North. Add a westbound right turn lane, sign and pavement marking improvements, etc. | Grouped Project | 2025 | CO | Safety | 1.459.500 | ||
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2023 | PE | SIB loan | 128.400 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2023 | PE | Federal Earmark | 110.496 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2023 | PE | Local | 9.776 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2024 | PE-RWS | OKI-CMAQ | 192.000 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2024 | PE-RWS | Local | 48.000 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2025 | RW | OKI-CMAQ | 1.460.000 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2025 | RW | Local | 365.000 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2026 | CO | OKI-CMAQ | 4.348.000 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2026 | CO | Federal Discretionary | 2.819.249 | FY28 | |
114042 | Ohio | Clermont | Village of New Richmond | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. | traffic operations/safety | 2026 | CO | Local | 2.332.471 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2024 | PE-DD | Major New | 7.088.591 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2022 | PE-DD | Major New | 2.376.100 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2023 | PE-DD | Major New | 535.309 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2023 | PE-DD | State | 133.827 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2022 | PE-DD | State | 594.025 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2021 | PE-DD | State | 24.960 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2024 | PE-DD | State | 1.772.148 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2028 | CO | Federal | 139.959.424 | FY28 | |
114161 | Ohio | Hamilton | ODOT | HAM IR 75 1.95 | Findlay Street to just south of Marshall Avenue | Reconstruction of I-75. This is the northern end of the BSB Corridor Project. Project includes the construction of new interchange on I-75 to connect the new Western Hills Viaduct | widening/relocation | 2028 | CO | State | 50.573.399 | FY28 | |
114275 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2026 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 2026 | CO | Labor | 70.000 | ||
114275 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2026 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 2026 | CO | State | 870.710 | ||
114276 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2027 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 2027 | CO | Labor | 70.000 | ||
114276 | Ohio | District | ODOT SPONSORING AGENCY | D08 Mowing FY2027 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Grouped Project | 2027 | CO | State | 896.830 | ||
114285 | Ohio | District | ODOT SPONSORING AGENCY | D08/D07 Mowing FY2026 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties.District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Grouped Project | 2026 | CO | State | 995.100 | ||
114286 | Ohio | District | ODOT SPONSORING AGENCY | D08/D07 Mowing FY2027 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties.District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Grouped Project | 2027 | CO | State | 1.024.950 | ||
114438 | Ohio | District | DISTRICT 8 ENGINEERING | D08 BI FY2027/2028 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2027 and 2028. | Grouped Project | 2027 | OTH | Preservation | 360.000 | ||
114438 | Ohio | District | DISTRICT 8 ENGINEERING | D08 BI FY2027/2028 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2027 and 2028. | Grouped Project | 2027 | OTH | State | 90.000 | ||
114439 | Ohio | District | DISTRICT 8 ENGINEERING | D08 BI FY2027/2028 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2027 and 2028. Includes various fracture critical steel pier caps. | Grouped Project | 2027 | OTH | Preservation | 320.000 | ||
114439 | Ohio | District | DISTRICT 8 ENGINEERING | D08 BI FY2027/2028 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2027 and 2028. Includes various fracture critical steel pier caps. | Grouped Project | 2027 | OTH | State | 80.000 | ||
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2024 | PE-DD | Major Programs | 49.861 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2025 | PE-DD | Major Programs | 64.051 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2024 | PE-DD | State | 12.465 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2025 | PE-DD | State | 16.013 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2023 | PE-ENV | Major Programs | 566.612 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2023 | PE-ENV | State | 141.653 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2025 | RW | State | 4.200 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2026 | CO | OKI-CMAQ | 1.061.110 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2026 | CO | OKI-TA | 1.000.000 | 2Q26 | |
114496 | Ohio | Hamilton | Great Parks of Hamilton County | HAM Columbia Connector | along US50/Wooster Pike in Columbia Twp and Mariemont | Consruct a separated multi-use path beginning near the intersection of US50 & Pocahontas and ending at the current west terminus of the LMST, ,east of Walnut Creek. | bicycle/pedestrian/other | 2026 | CO | Local | 795.568 | 2Q26 | |
114507 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 18.99 | HAM-275 SLM 18.99 to 21.68 | Resurfacing on a portion of IR 275 in Hamilton County | Grouped Project | 2027 | CO | Preservation | 6.174.297 | ||
114507 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 18.99 | HAM-275 SLM 18.99 to 21.68 | Resurfacing on a portion of IR 275 in Hamilton County | Grouped Project | 2027 | CO | State | 686.033 | ||
114512 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 36.60 | HAM-275 SLM 36.6 - 39.81 | Concrete repairs to the existing rigid pavement on portion of IR 275 in Hamilton County | Grouped Project | 2026 | CO | Preservation | 6.059.570 | ||
114512 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 36.60 | HAM-275 SLM 36.6 - 39.81 | Concrete repairs to the existing rigid pavement on portion of IR 275 in Hamilton County | Grouped Project | 2026 | CO | State | 673.286 | ||
114515 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB | Grouped Project | 2024 | ENV | State | 141.440 | ||
114515 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB | Grouped Project | 2026 | CO | State | 1.447.482 | ||
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2024 | PE-RWS | OKI-STBG | 144.000 | 4Q26 | |
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2024 | PE-RWS | Local | 36.000 | 4Q26 | |
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2025 | RW | OKI-STBG | 792.000 | 4Q26 | |
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2025 | RW | Local | 198.000 | 4Q26 | |
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2026 | CO | OKI-STBG | 2.826.000 | 4Q26 | |
114602 | Ohio | Hamilton | City of Cincinnati | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Phase 7 of Wasson Way. Construction of shared use path. | bicycle/pedestrian/other | 2026 | CO | Local | 1.804.521 | 4Q26 | |
114651 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 562 2.27 | HAM SR 562 2.27 | Project to replace and raise bridge HAM-562-0227 that carries Wesley Rd over SR562. | Grouped Project | 2026 | RW | State | 40.000 | ||
114652 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Grouped Project | 2025 | RW | State | 65.000 | ||
114653 | Ohio | Preble | ODOT SPONSORING AGENCY | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts PRE-503-1271, PRE-725-1433, PRE 732-1310, BUT-4B-0044, | Grouped Project | 2027 | CO | Preservation | 800.000 | ||
114653 | Ohio | Preble | ODOT SPONSORING AGENCY | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts PRE-503-1271, PRE-725-1433, PRE 732-1310, BUT-4B-0044, | Grouped Project | 2027 | CO | State | 200.000 | ||
114659 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 0.34/3.12/34.84 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad, HAM-275-0312L/R over Whitewater River and HAM-275-3484L/R over Loveland Maderia Rd and a Railroad by drilling out-of-plane bending crack | Grouped Project | 2027 | CO | Preservation | 2.226.600 | ||
114659 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 0.34/3.12/34.84 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad, HAM-275-0312L/R over Whitewater River and HAM-275-3484L/R over Loveland Maderia Rd and a Railroad by drilling out-of-plane bending crack | Grouped Project | 2027 | CO | State | 247.400 | ||
114660 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Inverts FY2027 | HAM-747-0195 | Project to Pave inverts of bridge size culverts and perform other related repairs Including HAM-747-0195, HAM-74-1681, & HAM-275-2448 | Grouped Project | 2027 | CO | State | 45.000 | ||
114662 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 5 | Grouped Project | 2027 | CO | Preservation | 578.360 | ||
114662 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 5 | Grouped Project | 2027 | CO | State | 144.590 | ||
114663 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 22.18/23.16 | HAM US 50 23.16 | Project to repair two bridges on US 50 below the Mt Adams area in Cincinnati. Repair bridge HAM-50-2218 that carries a widened portion of Eastbound US 50 extending from a retaining wall and roadway. W | Grouped Project | 2025 | ENV | State | 15.000 | ||
114663 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 22.18/23.16 | HAM US 50 23.16 | Project to repair two bridges on US 50 below the Mt Adams area in Cincinnati. Repair bridge HAM-50-2218 that carries a widened portion of Eastbound US 50 extending from a retaining wall and roadway. W | Grouped Project | 2025 | ENV | Preservation | 60.000 | ||
114666 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Grouped Project | 2026 | RW | State | 29.000 | ||
114671 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71/42 2.33/2.35 | HAM 71/42 2.33/2.35 | Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound. | Grouped Project | 2027 | CO | Preservation | 1.920.600 | ||
114671 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71/42 2.33/2.35 | HAM 71/42 2.33/2.35 | Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71 and bridge HAM-42-0235R which carries US 42 Northbound over I-71 Southbound. | Grouped Project | 2027 | CO | State | 213.400 | ||
114672 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE Culverts FY29 | varies | Project entails pave small culvert CLE-222-1753 (1883314). Replace small culvert CLE-133-0475 (1883296) | Grouped Project | 2026 | RW | State | 30.000 | ||
114673 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-71-1983 (1880387), HAM-74-1591 (1880384), HAM-74-0630 (1882233), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407) | Grouped Project | 2026 | RW | State | 30.000 | ||
114673 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-71-1983 (1880387), HAM-74-1591 (1880384), HAM-74-0630 (1882233), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407) | Grouped Project | 2027 | CO | State | 131.000 | ||
114678 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run | Grouped Project | 2025 | ENV | State | 30.000 | ||
114678 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run | Grouped Project | 2025 | ENV | Preservation | 120.000 | ||
114679 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 34.79 | CLE SR 133 34.79 | Replace Bridge size Culvert that carries SR 133 over Locust Creek | Grouped Project | 2025 | ENV | State | 30.000 | ||
114679 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 34.79 | CLE SR 133 34.79 | Replace Bridge size Culvert that carries SR 133 over Locust Creek | Grouped Project | 2025 | ENV | Preservation | 120.000 | ||
114695 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Insp FY27/28 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpi | Grouped Project | 2027 | OTH | State | 200.000 | ||
114780 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach sla | Grouped Project | 2025 | ENV | Preservation | 135.000 | ||
114780 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach sla | Grouped Project | 2025 | ENV | State | 15.000 | ||
114859 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Mt. Adams Inspection FY24-26 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Grouped Project | 2024 | OTH | State | 634.730 | ||
115045 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 1.35 SCADA | Lytle Tunnel | Evaluation, maintenance and upgrade of the Lytle Tunnel SCADA system. | Grouped Project | 2024 | OTH | State | 33.945 | ||
115046 | Ohio | Butler | Ohio Rail Development Commission | BUT Maple Ave NS | BUT Maple Avenue, City of Hamilton, at the NS Grade Crossing DOT # 524960Y. | Modification of grade crossing warning devices at Norfolk Southern crossing DOT # 524960Y to include traffic signal preemption. Modification of traffic signals at the intersection of Maple Avenue and | Grouped Project | 2025 | CO | Rail | 403.825 | ||
115046 | Ohio | Butler | Ohio Rail Development Commission | BUT Maple Ave NS | BUT Maple Avenue, City of Hamilton, at the NS Grade Crossing DOT # 524960Y. | Modification of grade crossing warning devices at Norfolk Southern crossing DOT # 524960Y to include traffic signal preemption. Modification of traffic signals at the intersection of Maple Avenue and | Grouped Project | 2025 | DD | Rail | 10.000 | ||
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2024 | PE-ENV | Major Programs | 80.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2024 | PE-ENV | State | 20.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2025 | PE-DD | Major Programs | 40.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2025 | PE-DD | State | 10.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2025 | RW | OKI-TA | 56.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2025 | RW | Local | 14.000 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2026 | CO | OKI-TA | 594.915 | 4Q26 | |
115291 | Ohio | Hamilton | City of Cincinnati | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally re | bicycle/pedestrian/other | 2026 | CO | Local | 148.729 | 4Q26 | |
115417 | Ohio | Hamilton | ODOT | HAM IR 275 28.69 | IR 275 from US 42 to SR 28 | Implement Smart Lane by installing DMS and variable speed limit signs EB from US42 to SR28 & WB from SR28 to Loveland-Madeira. Identify capacity improvements at I-75 interchange. | widening/relocation | 2022 | PE-ENV | Federal Major New | 2.800.000 | UNSC | |
115417 | Ohio | Hamilton | ODOT | HAM IR 275 28.69 | IR 275 from US 42 to SR 28 | Implement Smart Lane by installing DMS and variable speed limit signs EB from US42 to SR28 & WB from SR28 to Loveland-Madeira. Identify capacity improvements at I-75 interchange. | widening/relocation | 2022 | PE-ENV | State | 700.000 | UNSC | |
115417 | Ohio | Hamilton | ODOT | HAM IR 275 28.69 | IR 275 from US 42 to SR 28 | Implement Smart Lane by installing DMS and variable speed limit signs EB from US42 to SR28 & WB from SR28 to Loveland-Madeira. Identify capacity improvements at I-75 interchange. | widening/relocation | 2025 | PE-DD | Uncommitted | 750.000 | UNSC | |
115417 | Ohio | Hamilton | ODOT | HAM IR 275 28.69 | IR 275 from US 42 to SR 28 | Implement Smart Lane by installing DMS and variable speed limit signs EB from US42 to SR28 & WB from SR28 to Loveland-Madeira. Identify capacity improvements at I-75 interchange. | widening/relocation | 2025 | RW | Uncommitted | 150.000 | UNSC | |
115417 | Ohio | Hamilton | ODOT | HAM IR 275 28.69 | IR 275 from US 42 to SR 28 | Implement Smart Lane by installing DMS and variable speed limit signs EB from US42 to SR28 & WB from SR28 to Loveland-Madeira. Identify capacity improvements at I-75 interchange. | widening/relocation | 2027 | CO | Uncommitted | 84.900.652 | UNSC | |
115555 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 11.96 | HAM-75: SLM 11.96 | Acquisition of land from the Village of Lockland for corridor preservation | Grouped Project | 2024 | RW | State | 306.790 | ||
115747 | Ohio | Hamilton | Norwood, City of | HAM US 22 4.807 | HAM-561: SLM 4.82-7.21 (between Lexington - Ridgeland) | FY25 Urban Paving Project in the City of Norwood on a portion of US 22 (Montgomery Rd) | Grouped Project | 2025 | CO | Local | 1.237.500 | ||
115747 | Ohio | Hamilton | Norwood, City of | HAM US 22 4.807 | HAM-561: SLM 4.82-7.21 (between Lexington - Ridgeland) | FY25 Urban Paving Project in the City of Norwood on a portion of US 22 (Montgomery Rd) | Grouped Project | 2025 | CO | Preservation | 1.650.000 | ||
115749 | Ohio | Butler | Hamilton, City of | BUT SR 129 11.31 | BUT-129: SLM 11.31-12.83 (between the w corp - Verlynn Ave) | FY25 Urban Paving in the City of Hamilton on a portion of SR 129 (Millville Ave) | Grouped Project | 2025 | CO | Preservation | 745.831 | ||
115751 | Ohio | Butler | Middletown, City of | BUT SR 122 8.29 | BUT-122: SLM 8.29-9.64 (between University - Jackson) | FY25 Urban Paving in the City of Middletown on a portion of SR 122 (Roosevelt Blvd) | Grouped Project | 2025 | CO | Preservation | 1.377.810 | ||
115754 | Ohio | Butler | Trenton, City of | BUT SR 73 16.05 | BUT-73: SLM 16.05-16.76 (First St - eastern corp) | FY26 Urban Paving project n the City of Trenton on a portion of SR 73 (State St) | Grouped Project | 2026 | CO | Local | 55.913 | ||
115754 | Ohio | Butler | Trenton, City of | BUT SR 73 16.05 | BUT-73: SLM 16.05-16.76 (First St - eastern corp) | FY26 Urban Paving project n the City of Trenton on a portion of SR 73 (State St) | Grouped Project | 2026 | CO | Preservation | 223.650 | ||
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2023 | PE-ENV | Major Programs | 400.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2023 | PE-ENV | State | 100.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2023 | PE-ENV | Local | 1.500.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2026 | PE-DD | Major Programs | 500.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2026 | PE-DD | Local | 500.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2027 | RW | Uncommitted | 60.000 | UNSC | |
115755 | Ohio | Butler | Butler County TID | BUT North Hamilton Crossing | North side of Hamilton, crossing Great Miami River in area between SR 129 and N of Black St Bridge | New east-west route connecting NW Washington Blvd, US 127, SR 4 and SR 129 (Phases 1,2&3) | widening/relocation | 2028 | CO | Uncommitted | 34.240.000 | UNSC | |
115756 | Ohio | Hamilton | City of Cincinnati | HAM US 22 1.13 Gilbert Ave | Court St. to Victory Parkway | Resurfacing of US 22 (Gilbert Ave) from Court St. to Victory Pkwy. Road diet from Court St. to MLK. Reduce vehicular lanes, add bike lanes, add curb bump-outs to shorten pedestrian crossings. | bicycle/pedestrian/other | 2026 | CO | OKI-STBG | 8.000.000 | 4Q26 | |
115756 | Ohio | Hamilton | City of Cincinnati | HAM US 22 1.13 Gilbert Ave | Court St. to Victory Parkway | Resurfacing of US 22 (Gilbert Ave) from Court St. to Victory Pkwy. Road diet from Court St. to MLK. Reduce vehicular lanes, add bike lanes, add curb bump-outs to shorten pedestrian crossings. | bicycle/pedestrian/other | 2026 | CO | Local | 2.371.646 | 4Q26 | |
115756 | Ohio | Hamilton | City of Cincinnati | HAM US 22 1.13 Gilbert Ave | Court St. to Victory Parkway | Resurfacing of US 22 (Gilbert Ave) from Court St. to Victory Pkwy. Road diet from Court St. to MLK. Reduce vehicular lanes, add bike lanes, add curb bump-outs to shorten pedestrian crossings. | bicycle/pedestrian/other | 2026 | CO | Preservation | 1.486.583 | 4Q26 | |
115757 | Ohio | Hamilton | Montgomery, City of | HAM US 22 15.22 | HAM-22: SLM 15.22-15.87 (between Pfeiffer Rd - Weller Rd) | FY26 Urban Paving project in the City of Montgomery on a portion of US 22 (Montgomery Rd) | Grouped Project | 2026 | CO | Local | 101.587 | ||
115757 | Ohio | Hamilton | Montgomery, City of | HAM US 22 15.22 | HAM-22: SLM 15.22-15.87 (between Pfeiffer Rd - Weller Rd) | FY26 Urban Paving project in the City of Montgomery on a portion of US 22 (Montgomery Rd) | Grouped Project | 2026 | CO | Preservation | 406.350 | ||
115793 | Ohio | Warren | Warren County Engineer | WAR TR 71 0.39 McClure Rd Bridge | Bridge No. WAR-TR 71-0.39 (SFN: 8334439) carrying McClure Road over Turtle Creek | Replacement of the superstructure of Bridge WAR-TR 71-0.39 (SFN: 8334439). | Grouped Project | 2024 | CO | State | 636.500 | ||
115961 | Ohio | Butler | ODOT SPONSORING AGENCY | D08 PO FY2026 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2026. | Grouped Project | 2026 | OTH | State | 21.000 | ||
115962 | Ohio | Butler | ODOT SPONSORING AGENCY | D08 PO FY2027 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2027. | Grouped Project | 2027 | OTH | State | 15.000 | ||
115964 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08 PO FY2025 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2025. | Grouped Project | 2025 | OTH | State | 87.000 | ||
115965 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08 PO FY2026 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2026. | Grouped Project | 2026 | OTH | State | 87.000 | ||
115966 | Ohio | Hamilton | ODOT SPONSORING AGENCY | D08 PO FY2027 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2027. | Grouped Project | 2027 | OTH | State | 100.000 | ||
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2023 | PE-DD | Major Programs | 761.606 | UNSC | |
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2023 | PE-DD | State | 215.362 | UNSC | |
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2024 | PE-ENV | Major Programs | 765.844 | UNSC | |
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2024 | PE-ENV | State | 332.901 | UNSC | |
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2025 | RW | Uncommitted | 2.085.000 | UNSC | |
115976 | Ohio | Hamilton | ODOT | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Create 2 SB left turn lanes at Round Bottom, widen SR32 to provide 2 receiving lanes w/ new lane ending as RTL at Little Dry Run. Widen for TWLTL along SR32 from Little Dry Run. Add shared use path. | traffic operations/safety | 2028 | CO | Uncommitted | 10.753.500 | UNSC | |
116204 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 126 2.92 | BUT 126 2.88 to 2.96 | Stream has eroded embankment and has impacted the pavement along EB SR 126. Project will stabilize the slope and restore the roadway. Small culvert BUT-126-0293 (1882035) will be replaced with projec | Grouped Project | 2024 | DD | State | 185.272 | ||
116204 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 126 2.92 | BUT 126 2.88 to 2.96 | Stream has eroded embankment and has impacted the pavement along EB SR 126. Project will stabilize the slope and restore the roadway. Small culvert BUT-126-0293 (1882035) will be replaced with projec | Grouped Project | 2025 | CO | State | 500.000 | ||
116258 | Ohio | Hamilton | Kentucky, Commonwealth of | Clay Bailey Joint & Stl Repair | HAM-42-0.00 | Clay Wade Bailey Bridge - Joint & Steel Repairs | Grouped Project | 2024 | CO | State | 506.000 | ||
116258 | Ohio | Hamilton | Kentucky, Commonwealth of | Clay Bailey Joint & Stl Repair | HAM-42-0.00 | Clay Wade Bailey Bridge - Joint & Steel Repairs | Grouped Project | 2024 | CO | Local | 1.794.000 | ||
116259 | Ohio | Hamilton | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Grouped Project | 2025 | DD | Local | 600.000 | ||
116259 | Ohio | Hamilton | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Grouped Project | 2025 | DD | State | 400.000 | ||
116333 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 128 0.00 | HAM SR 128: SLM 0-5.62 | Resurfacing a portion of SR 128 in Hamilton County | Grouped Project | 2026 | CO | State | 288.182 | ||
116465 | Ohio | Hamilton | City of Forest Park | HAM VAR Forest Park Signals | CR 266 (Kemper); CR 239 (Winton); CR 614 (Northland Blvd) | Install centrally-controlled traffic system. Includes 5 signals on Kemper (including Kroger), 6 signals on Winton, 1 signal at Winton and Kemper, and 3 signals on Nortland. | traffic operations/safety | 2025 | CO | OKI-STBG | 278.235 | 2Q25 | |
116465 | Ohio | Hamilton | City of Forest Park | HAM VAR Forest Park Signals | CR 266 (Kemper); CR 239 (Winton); CR 614 (Northland Blvd) | Install centrally-controlled traffic system. Includes 5 signals on Kemper (including Kroger), 6 signals on Winton, 1 signal at Winton and Kemper, and 3 signals on Nortland. | traffic operations/safety | 2025 | CO | Local | 568.872 | 2Q25 | |
116488 | Ohio | Hamilton | Harrison, City of | HAM Industrial/Campbell Widening | Intersection of Campbell Road and Industrial Drive in City of Harrison | Addition of right turn lane on Campbell Road to Industrial Drive, addition of left turn lane on Industrial Drive, and signalize intersection, as well as widen a portion of Industrial Drive to support | Grouped Project | 2024 | CO | State | 200.000 | ||
116547 | Ohio | Hamilton | Green Twp | HAM CR 128/161 3.40/0.00 | Intersection of Hutchinson and Ebenezer Roads | Convert stop-controlled intersection to roundabout | traffic operations/safety | 2025 | RW | OKI-STBG | 300.750 | 4Q25 | |
116547 | Ohio | Hamilton | Green Twp | HAM CR 128/161 3.40/0.00 | Intersection of Hutchinson and Ebenezer Roads | Convert stop-controlled intersection to roundabout | traffic operations/safety | 2025 | RW | Local | 300.750 | 4Q25 | |
116547 | Ohio | Hamilton | Green Twp | HAM CR 128/161 3.40/0.00 | Intersection of Hutchinson and Ebenezer Roads | Convert stop-controlled intersection to roundabout | traffic operations/safety | 2025 | CO | OKI-STBG | 586.511 | 4Q25 | |
116547 | Ohio | Hamilton | Green Twp | HAM CR 128/161 3.40/0.00 | Intersection of Hutchinson and Ebenezer Roads | Convert stop-controlled intersection to roundabout | traffic operations/safety | 2025 | CO | Local | 1.061.569 | 4Q25 | |
116547 | Ohio | Hamilton | Green Twp | HAM CR 128/161 3.40/0.00 | Intersection of Hutchinson and Ebenezer Roads | Convert stop-controlled intersection to roundabout | traffic operations/safety | 2025 | CO | Labor | 115.366 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2022 | PE-ENV | State | 102.807 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2022 | PE-DD | State | 18.142 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2022 | RWS | State | 60.000 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2025 | RW | OKI-STBG | 422.000 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2025 | RW | Local | 422.000 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2025 | CO | OKI-STBG | 501.451 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2025 | CO | Local | 1.456.145 | 4Q25 | |
116548 | Ohio | Hamilton | Green Twp | HAM CR 158/460 2.04/0.54 | Intersection of Werk Road and Westbourne Drive | Addition of right-turn lanes and replace traffic signals | traffic operations/safety | 2025 | CO | Labor | 137.032 | 4Q25 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2022 | PE-ENV | State | 24.960 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2022 | PE-ENV | State | 141.440 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2025 | PE-RWS | OKI-STBG | 20.000 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2025 | PE-RWS | Local | 5.000 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2026 | CO | OKI-STBG | 5.038.929 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2026 | CO | Local | 1.259.732 | 4Q26 | |
116550 | Ohio | Hamilton | Village of Silverton | HAM US 22/CR 273 9.74/0.89 | Plainfield Road from St. James to NCL. Montgomery at Section/Alpine intersection | Reconstruct Plainfield Rd includes intersection improvement and signal replacement; realign Plainfield and Montgomery intersection; realign Montogmery and Alpine/Section intersection | maintenance/reconstruction | 2026 | CO | Labor | 422.222 | 4Q26 | |
116567 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Grouped Project | 2026 | ENV | State | 60.000 | ||
116567 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Grouped Project | 2027 | DD | State | 30.000 | ||
116569 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Grouped Project | 2025 | ENV | Preservation | 240.000 | ||
116569 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Grouped Project | 2025 | ENV | State | 60.000 | ||
116645 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Mt. Adams Inspection FY27-29 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Grouped Project | 2027 | OTH | State | 300.000 | ||
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2023 | PE-DD | State (KY) | 3.500.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2024 | PE-DD | State (KY) | 13.100.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | PE-DD | State (KY) | 41.106.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2023 | PE-DD | Major New | 2.841.600 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2023 | PE-DD | State (OH) | 710.400 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2024 | PE-DD | State (OH) | 6.000.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | PE-DD | State (OH) | 43.994.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | PE-DD | Federal | 312.000.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2026 | RW | Federal | 32.560.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | RW | Federal | 75.535.910 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | RW | State (OH) | 10.996.513 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2026 | RW | State (KY) | 8.140.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | RW | State (KY) | 7.887.465 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CO | Federal | 1.214.904.090 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CO | State (OH) | 372.454.730 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CO | State (KY) | 574.429.304 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CE | Federal | 4.000.000 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CE | State (OH) | 57.577.660 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2025 | CE | State (KY) | 60.861.354 | FY25 | |
116649 | Ohio | Hamilton | ODOT | Brent Spence Bridge Corridor | South of Dixie Highway Interchange in KY to north of Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Project including the companion bridge. Project will be delivered via design-build procurement led by ODOT | widening/relocation | 2026 | CE | State (KY) | 1.628.000 | FY25 | |
116663 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 22.90 | HAM IR 275 near SLM 22.92 | Embankment slide repair along shoulder of HAM-275 near Kilby Road | Grouped Project | 2027 | CO | State | 75.000 | ||
116663 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 22.90 | HAM IR 275 near SLM 22.92 | Embankment slide repair along shoulder of HAM-275 near Kilby Road | Grouped Project | 2025 | DD | State | 250.000 | ||
116664 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 8.30 | WAR SR 350 near SLM 8.30 | Erosion & drainage repair to the existing retaining wall along a portion of SR 350 in Warren County | Grouped Project | 2024 | ENV | State | 14.925 | ||
116664 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 350 8.30 | WAR SR 350 near SLM 8.30 | Erosion & drainage repair to the existing retaining wall along a portion of SR 350 in Warren County | Grouped Project | 2025 | RW | State | 80.000 | ||
116667 | Ohio | District | ODOT SPONSORING AGENCY | D08 Dam Removal FY2027 | TBD | Removal of an existing low head dam in District 8. Location TBD | Grouped Project | 2024 | ENV | State | 98.955 | ||
116667 | Ohio | District | ODOT SPONSORING AGENCY | D08 Dam Removal FY2027 | TBD | Removal of an existing low head dam in District 8. Location TBD | Grouped Project | 2025 | DD | State | 250.000 | ||
116865 | Ohio | Warren | Warren County TID | WAR SR 48 9.94 | the intersection of IR 71 southbound ramps and SR 48 | Install a new traffic signal at the IR 71 southbound ramps and SR 48 intersection. Extend the northbound SR 48 left turn lane to IR 71 southbound. Widen SR 48 northbound to extend the 3 lane section t | Grouped Project | 2024 | RW | State | 25.000 | ||
116865 | Ohio | Warren | Warren County TID | WAR SR 48 9.94 | the intersection of IR 71 southbound ramps and SR 48 | Install a new traffic signal at the IR 71 southbound ramps and SR 48 intersection. Extend the northbound SR 48 left turn lane to IR 71 southbound. Widen SR 48 northbound to extend the 3 lane section t | Grouped Project | 2026 | CO | State | 1.100.000 | ||
116987 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Maint FY23-24 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2023 + FY2024 | Grouped Project | 2024 | OTH | State | 100.000 | ||
116988 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Maint FY25-26 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2025 + FY2026 | Grouped Project | 2026 | OTH | State | 100.000 | ||
116988 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Maint FY25-26 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2025 + FY2026 | Grouped Project | 2025 | OTH | State | 100.000 | ||
116989 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM Tunnel Maint FY27-28 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2027 + FY2028 | Grouped Project | 2027 | OTH | State | 100.000 | ||
116991 | Ohio | District | ODOT SPONSORING AGENCY | D08 CS FY2027 | TBD | District wide crack sealing in FY2027 | Grouped Project | 2027 | CO | State | 150.000 | ||
116991 | Ohio | District | ODOT SPONSORING AGENCY | D08 CS FY2027 | TBD | District wide crack sealing in FY2027 | Grouped Project | 2027 | CO | Preservation | 600.000 | ||
117001 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 5 | Peffer Park to Talawanda Middle School and Chestnut Fields Multi-Modal Hub | Construct three segments of the Oxford Area Trail | bicycle/pedestrian/other | 2022 | PE | State | 34.174 | 4Q25 | |
117001 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 5 | Peffer Park to Talawanda Middle School and Chestnut Fields Multi-Modal Hub | Construct three segments of the Oxford Area Trail | bicycle/pedestrian/other | 2022 | RWS | State | 60.000 | 4Q25 | |
117001 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 5 | Peffer Park to Talawanda Middle School and Chestnut Fields Multi-Modal Hub | Construct three segments of the Oxford Area Trail | bicycle/pedestrian/other | 2025 | CO | OKI-CMAQ | 3.040.103 | 4Q25 | |
117001 | Ohio | Butler | City of Oxford | BUT Oxford Area Trail Phase 5 | Peffer Park to Talawanda Middle School and Chestnut Fields Multi-Modal Hub | Construct three segments of the Oxford Area Trail | bicycle/pedestrian/other | 2025 | CO | Local | 3.425.803 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2022 | PE-ENV | State | 44.762 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2022 | PE-DD | State | 7.899 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2022 | RWS | State | 60.000 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2025 | CO | OKI-CMAQ | 6.000.000 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2025 | CO | Local | 3.863.846 | 4Q25 | |
117016 | Ohio | Hamilton | Great Parks of Hamilton County | HAM WW to Glenwood Gardens Trail | West Fork Mill Creek Greenway Trail to Harbor Loop Trail in Winton Woods | Extension of trail | bicycle/pedestrian/other | 2025 | CO | Labor | 690.469 | 4Q25 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2024 | PE-ENV | Major Programs | 1.920.000 | FY28 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2024 | PE-ENV | State | 480.000 | FY28 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2026 | PE-DD | Major Programs | 1.760.000 | FY28 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2026 | PE-DD | State | 440.000 | FY28 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2026 | RW | Uncommitted | 14.900.000 | FY28 | |
117167 | Ohio | Hamilton | ODOT | HAM IR 75 10.40 | Galbraith Road to Shepard Lane | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and SB IR75 to WB SR126 ramp and unify both directions of IR75 onto existing SB alignment. | widening/relocation | 2028 | CO | Uncommitted | 172.987.000 | FY28 | |
117208 | Ohio | Hamilton | City of Cincinnati | HAM CR 674 0.53 Victory Parkway | Victory Pkwy & WH Taft intersection to Eden Park Dr & Martin Dr intersection | Major rehabilition of Park Av bridge. Improve safety by reducing vehicle lanes, adding on-street bike facility and upgrade lighting along Victory Pkwy. | maintenance/reconstruction | 2023 | PE | State | 67.446 | 3Q26 | |
117208 | Ohio | Hamilton | City of Cincinnati | HAM CR 674 0.53 Victory Parkway | Victory Pkwy & WH Taft intersection to Eden Park Dr & Martin Dr intersection | Major rehabilition of Park Av bridge. Improve safety by reducing vehicle lanes, adding on-street bike facility and upgrade lighting along Victory Pkwy. | maintenance/reconstruction | 2026 | CO | OKI-STBG | 6.000.000 | 3Q26 | |
117208 | Ohio | Hamilton | City of Cincinnati | HAM CR 674 0.53 Victory Parkway | Victory Pkwy & WH Taft intersection to Eden Park Dr & Martin Dr intersection | Major rehabilition of Park Av bridge. Improve safety by reducing vehicle lanes, adding on-street bike facility and upgrade lighting along Victory Pkwy. | maintenance/reconstruction | 2026 | CO | Local | 3.090.909 | 3Q26 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2022 | PE-ENV | State | 25.715 | 4Q25 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2022 | PE-DD | State | 4.538 | 4Q25 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2022 | RW | State | 60.000 | 4Q25 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2025 | CO | OKI-TA | 262.615 | 4Q25 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2025 | CO | Local | 751.174 | 4Q25 | |
117209 | Ohio | Hamilton | Colerain Twp | HAM CR 96 5.25 Springdale Road | From Colerain Avenue to Loralinda Drive | Remove existing 4' to 5' wide non-contiguous sidewalks, and replace with continuous 8' wide ADA compliant sidewalk. | bicycle/pedestrian/other | 2025 | CO | Labor | 70.965 | 4Q25 | |
117210 | Ohio | Clermont | City of Milford | CLE US50/SR 28 0.83/0.00 | Main St. from Five Points Intersection to Kirgan Lane. Lila Av from Five Points to Mohawk Trail | Sidwalk replacement, mid-block ped crossings, street lighting, RRFB and wayfinding signage. | bicycle/pedestrian/other | 2024 | PE-ENV | State | 141.440 | 4Q25 | |
117210 | Ohio | Clermont | City of Milford | CLE US50/SR 28 0.83/0.00 | Main St. from Five Points Intersection to Kirgan Lane. Lila Av from Five Points to Mohawk Trail | Sidwalk replacement, mid-block ped crossings, street lighting, RRFB and wayfinding signage. | bicycle/pedestrian/other | 2024 | PE-DD | State | 24.960 | 4Q25 | |
117210 | Ohio | Clermont | City of Milford | CLE US50/SR 28 0.83/0.00 | Main St. from Five Points Intersection to Kirgan Lane. Lila Av from Five Points to Mohawk Trail | Sidwalk replacement, mid-block ped crossings, street lighting, RRFB and wayfinding signage. | bicycle/pedestrian/other | 2025 | CO | OKI-TA | 750.000 | 4Q25 | |
117210 | Ohio | Clermont | City of Milford | CLE US50/SR 28 0.83/0.00 | Main St. from Five Points Intersection to Kirgan Lane. Lila Av from Five Points to Mohawk Trail | Sidwalk replacement, mid-block ped crossings, street lighting, RRFB and wayfinding signage. | bicycle/pedestrian/other | 2025 | CO | Local | 750.000 | 4Q25 | |
117237 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/WAR US 22 16.04/0.00 Ped | HAM US-22 at I-275 to WAR US-22 at Landen Dr | Relocating existing ped heads and push buttons onto pedestals for better accessibility, adding sidewalk and curb ramps to make crossings ADA compliant. Includes 30 pedestals and associated conduit, wi | Grouped Project | 2024 | RW | State | 7.500 | ||
117275 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Grouped Project | 2026 | RW | Preservation | 220.000 | ||
117275 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Grouped Project | 2026 | RW | State | 125.000 | ||
117275 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Grouped Project | 2027 | CO | State | 213.000 | ||
117275 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Grouped Project | 2025 | DD | State | 80.000 | ||
117505 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 81 2.71 Trenton Franklin | Bridge BUT CR 81 2.71 (SFN: 0930857) which carries Trenton Franklin Rd over Kemp Run | Complete bridge replacement. Improvements to the bridge approach roadway including guardrail upgrades. | Grouped Project | 2025 | CO | Local | 453.486 | ||
117505 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 81 2.71 Trenton Franklin | Bridge BUT CR 81 2.71 (SFN: 0930857) which carries Trenton Franklin Rd over Kemp Run | Complete bridge replacement. Improvements to the bridge approach roadway including guardrail upgrades. | Grouped Project | 2025 | CO | Local Programs | 586.425 | ||
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2024 | PE-DD | Major Programs | 280.000 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2024 | PE-DD | State | 70.000 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CO | State Major Rehab Bonds | 32.553.809 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CO | Garvee Bond | 24.558.136 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CO | Major Rehab | 16.618.398 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CO | State | 2.957.657 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CE | Federal | 2.911.289 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | CE | State | 4.641.872 | 4Q25 | |
117525 | Ohio | Hamilton | ODOT | HAM IR 75 8.91 | From Regina Graeter Way to SR 126/Galbraith Rd. area | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange. | widening/relocation | 2025 | OTH | Debt Service | 30.770.941 | 4Q25 | |
117578 | Ohio | Butler | Hamilton, City of | BUT Hamilton SRTS 2022 | Wasserman Rd from Victor Ct to Imperial Dr | Install sidewalks on each side of Wasserman Road from Victor Court to Imperial Drive. Storm structures and drive aprons will be added or modified where necessary to accommodate sidewalk. | Grouped Project | 2025 | CO | Local | 40.612 | ||
117578 | Ohio | Butler | Hamilton, City of | BUT Hamilton SRTS 2022 | Wasserman Rd from Victor Ct to Imperial Dr | Install sidewalks on each side of Wasserman Road from Victor Court to Imperial Drive. Storm structures and drive aprons will be added or modified where necessary to accommodate sidewalk. | Grouped Project | 2025 | CO | Local Programs | 263.109 | ||
117586 | Ohio | Hamilton | Kentucky, Commonwealth of | Roebling Brdg Insp FY 23 | HAM-CR600-0.01 | Roebling Bridge FY23 Inspection - KYTC lead Ohio River Bridge Inspection. | Grouped Project | 2024 | OTH | State | 659 | ||
117589 | Ohio | Hamilton | Kentucky, Commonwealth of | Combs-Hehl Brdg Insp FY23 | HAM-275-41.6 | Combs-Hehl Bridge Inspection - FY23 | Grouped Project | 2024 | OTH | State | 13.869 | ||
117697 | Ohio | Hamilton | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure.Earmark: OH417 | Grouped Project | 2024 | CO | Rail | 375.000 | ||
117697 | Ohio | Hamilton | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure.Earmark: OH417 | Grouped Project | 2024 | CO | Local | 700.649 | ||
117818 | Ohio | Hamilton | Cincinnati, City of | HAM State to Central: BBN | State Ave (River Rd to W. 8th St); W. 8th St (River Rd to Central Ave); Linn St (W. 6th St to Centra | Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. | Grouped Project | 2026 | CO | Local | 890.000 | ||
117821 | Ohio | Hamilton | City of Forest Park | HAM Public Roadway & Utilities | Public roadway & utility improvements | Public roadway & utility improvements | debt service | 2024 | OTH | State | 4.320.954 | FY24 | |
117839 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE 2023 CEAO Sign Upgrade | Various County Routes inside Clermont County. | 2023 CEAO Sign Upgrade for Clermont County | Grouped Project | 2024 | OTH | Local | 1.400 | ||
117839 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE 2023 CEAO Sign Upgrade | Various County Routes inside Clermont County. | 2023 CEAO Sign Upgrade for Clermont County | Grouped Project | 2024 | OTH | Local Programs | 5.600 | ||
117988 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT TR 210 0.62 Schoenling Rd | Bridge BUT TR 210 0.62 (SFN: 0933511) | Replacement of Bridge BUT-TR 210-0.62 (SFN: 0933511) on a modified alignment. | Grouped Project | 2025 | DD | Local Programs | 213.400 | ||
117996 | Ohio | Clermont | Clermont County T.I.D. | CLE CR 54 2.16 Glancy Corner Rd | Bridge CLE-CR 54-2.16 (SFN: 1358154) | Replacement of the superstructure of Bridge CLE-CR 54-2.16 (SFN: 1358154). | Grouped Project | 2024 | DD | Local Programs | 5.862 | ||
118053 | Ohio | Hamilton | Cincinnati, City of | HAM CR 457 16.23 | Harrison Ave from Kling Ave to Queen City Blvd. | Road diet on Harrison Ave from Kling Ave to Queen City Blvd including traffic signal rebuilds, pedestrian enhancements and resurfacing. | Grouped Project | 2025 | CO | Safety | 7.085.250 | ||
118053 | Ohio | Hamilton | Cincinnati, City of | HAM CR 457 16.23 | Harrison Ave from Kling Ave to Queen City Blvd. | Road diet on Harrison Ave from Kling Ave to Queen City Blvd including traffic signal rebuilds, pedestrian enhancements and resurfacing. | Grouped Project | 2025 | CO | PROTECT | 595.890 | ||
118053 | Ohio | Hamilton | Cincinnati, City of | HAM CR 457 16.23 | Harrison Ave from Kling Ave to Queen City Blvd. | Road diet on Harrison Ave from Kling Ave to Queen City Blvd including traffic signal rebuilds, pedestrian enhancements and resurfacing. | Grouped Project | 2025 | CO | Local | 936.223 | ||
118400 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Grouped Project | 2025 | RW | Safety | 25.000 | ||
118400 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Grouped Project | 2026 | RW | Safety | 250.000 | ||
118429 | Ohio | Butler | ODOT SPONSORING AGENCY | FACD08 BUT RA IR 75 9.77 | Butler I75 NB/SB Rest Areas | Expanding the footprint of the rest area on BUT-75 & Renovation of Rest Area. | Grouped Project | 2024 | DD | State | 763.433 | ||
118429 | Ohio | Butler | ODOT SPONSORING AGENCY | FACD08 BUT RA IR 75 9.77 | Butler I75 NB/SB Rest Areas | Expanding the footprint of the rest area on BUT-75 & Renovation of Rest Area. | Grouped Project | 2024 | CO | State | 86.400 | ||
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2023 | PE | State | 166.400 | 2Q26 | |
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2023 | PE-RWS | State | 60.000 | 2Q26 | |
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2025 | RW | OKI-STBG | 180.000 | 2Q26 | |
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2025 | RW | Local | 120.000 | 2Q26 | |
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2026 | CO | OKI-STBG | 4.319.275 | 2Q26 | |
118472 | Ohio | Hamilton | City of Harrison | HAM CR 14 3.49 Dry Fork Rd | Dry Fork Run Bridge over I-74 | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widen WB I-74 off-ramp. Traffic signals rebuilt and ramp meters installed. | traffic operations/safety | 2026 | CO | Local | 2.879.517 | 2Q26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2023 | PE | State | 78.632 | FY26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2025 | RW | OKI-STBG | 50.000 | FY26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2025 | RW | Local | 50.000 | FY26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2026 | CO | OKI-STBG | 358.601 | FY26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2026 | CO | Local | 594.719 | FY26 | |
118484 | Ohio | Hamilton | Anderson Twp | HAM CR 358 0.94 Clough & Newtown | Clough Pike from Copperleaf Drive to Bartels Road | Widen Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | traffic operations/safety | 2026 | CO | Labor | 95.332 | FY26 | |
118586 | Ohio | Butler | City of Oxford | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access fro Amtrak passenger rail service. Construction of parking area and sidewalk connection to adjacent BCRTA transit facility. | transit | 2023 | PE | State | 19.437 | 4Q26 | |
118586 | Ohio | Butler | City of Oxford | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access fro Amtrak passenger rail service. Construction of parking area and sidewalk connection to adjacent BCRTA transit facility. | transit | 2023 | PE-RWS | State | 60.000 | 4Q26 | |
118586 | Ohio | Butler | City of Oxford | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access fro Amtrak passenger rail service. Construction of parking area and sidewalk connection to adjacent BCRTA transit facility. | transit | 2026 | CO | OKI-STBG | 2.305.801 | 4Q26 | |
118586 | Ohio | Butler | City of Oxford | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access fro Amtrak passenger rail service. Construction of parking area and sidewalk connection to adjacent BCRTA transit facility. | transit | 2026 | CO | Local | 576.450 | 4Q26 | |
118586 | Ohio | Butler | City of Oxford | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access fro Amtrak passenger rail service. Construction of parking area and sidewalk connection to adjacent BCRTA transit facility. | transit | 2026 | CE | Local | 183.416 | 4Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2025 | PE-RWS | OKI-STBG | 96.000 | 2Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2025 | PE-RWS | Local | 24.000 | 2Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2025 | RW | OKI-STBG | 723.950 | 2Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2025 | RW | Local | 180.988 | 2Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2026 | CO | OKI-STBG | 5.344.310 | 2Q26 | |
118672 | Ohio | Hamilton | Hamilton County Engineer | HAM CR 4 1.43 | Intersections of Fields-Ertel & McCauly, Fields-Ertel & Conrey | Add turn lanes and convert McCauly from 4-way stop to signalized intersection. Add roundabout at Conrey. | traffic operations/safety | 2026 | CO | Local | 1.803.705 | 2Q26 | |
118818 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 25.45 | HAM-275 SLM 25.45 to 28.73 | Resurfacing on a portion of IR 275 in Hamilton County | Grouped Project | 2026 | CO | Preservation | 11.582.253 | ||
118818 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 25.45 | HAM-275 SLM 25.45 to 28.73 | Resurfacing on a portion of IR 275 in Hamilton County | Grouped Project | 2026 | CO | State | 1.286.917 | ||
119024 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment fro | Grouped Project | 2025 | RW | State | 40.000 | ||
119024 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment fro | Grouped Project | 2026 | RW | State | 20.000 | ||
119064 | Ohio | Butler | MetroParks of Butler County | BUT GMR Trail Middletown-Monroe | Middletown to Monroe Section | 1.6 mile Extension of Great Miami River Trail shared use trail, includes 0.7 miles shared road along Old Oxford State Road | bicycle/pedestrian/other | 2026 | CO | OKI-STBG | 128.702 | 4Q26 | |
119064 | Ohio | Butler | MetroParks of Butler County | BUT GMR Trail Middletown-Monroe | Middletown to Monroe Section | 1.6 mile Extension of Great Miami River Trail shared use trail, includes 0.7 miles shared road along Old Oxford State Road | bicycle/pedestrian/other | 2026 | CO | OKI-TA | 1.000.000 | 4Q26 | |
119064 | Ohio | Butler | MetroParks of Butler County | BUT GMR Trail Middletown-Monroe | Middletown to Monroe Section | 1.6 mile Extension of Great Miami River Trail shared use trail, includes 0.7 miles shared road along Old Oxford State Road | bicycle/pedestrian/other | 2026 | CO | Local | 282.176 | 4Q26 | |
119064 | Ohio | Butler | MetroParks of Butler County | BUT GMR Trail Middletown-Monroe | Middletown to Monroe Section | 1.6 mile Extension of Great Miami River Trail shared use trail, includes 0.7 miles shared road along Old Oxford State Road | bicycle/pedestrian/other | 2026 | CO | Labor | 98.761 | 4Q26 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | PE-RWS | OKI-TA | 36.000 | 4Q25 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | PE-RWS | Local | 36.000 | 4Q25 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | RW | OKI-TA | 15.000 | 4Q25 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | RW | Local | 15.000 | 4Q25 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | CO | OKI-TA | 214.894 | 4Q25 | |
119068 | Ohio | Hamilton | Colerain Twp | HAM CR 91 1.05 Poole Rd Sidewalk | from Colerain Avenue to Cheviot Road | Construction of sidewalk | bicycle/pedestrian/other | 2025 | CO | Local | 214.894 | 4Q25 | |
119069 | Ohio | Hamilton | City of Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | south corporation limits to Duneden Drive | Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvements, new signal system, new mid-block pedestrian crossings and EV charging stations | maintenance/reconstruction | 2026 | CO | OKI-STBG | 4.176.276 | 4Q26 | |
119069 | Ohio | Hamilton | City of Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | south corporation limits to Duneden Drive | Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvements, new signal system, new mid-block pedestrian crossings and EV charging stations | maintenance/reconstruction | 2026 | CO | OKI-TA | 400.000 | 4Q26 | |
119069 | Ohio | Hamilton | City of Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | south corporation limits to Duneden Drive | Reconstruction of Blue Ash Road including sidewalk replacement, stormwater improvements, new signal system, new mid-block pedestrian crossings and EV charging stations | maintenance/reconstruction | 2026 | CO | Local | 1.144.069 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2023 | PE-ENV | State | 141.440 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2023 | PE-DD | State | 24.960 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2023 | RWS | State | 60.000 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2025 | RW | OKI-STBG | 196.916 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2025 | RW | Local | 49.229 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2026 | CO | OKI-STBG | 1.385.382 | 4Q26 | |
119070 | Ohio | Hamilton | Delhi Twp | HAM CR 196 1.89 Delhi Av | Intersections of Delhi Pike and Delhi Towne Square, Delhi Pike and Klemme Dr | Improve safety and operation of two traffic signals and improve the operation along Delhi Pk. Install mast arm poles, backplates, improved ped safety. Widen approach of Klemme Dr south of intersection | traffic operations/safety | 2026 | CO | Local | 346.346 | 4Q26 | |
119071 | Ohio | Hamilton | City of Madeira | HAM Dawson Rd Shared Use Path | Dawson Road between Miami Avenue and McDonald Commons | New shared-use path | bicycle/pedestrian/other | 2026 | CO | OKI-TA | 747.763 | 4Q26 | |
119071 | Ohio | Hamilton | City of Madeira | HAM Dawson Rd Shared Use Path | Dawson Road between Miami Avenue and McDonald Commons | New shared-use path | bicycle/pedestrian/other | 2026 | CO | Local | 186.941 | 4Q26 | |
119072 | Ohio | Hamilton | City of Sharonville | HAM US 42 14.47 Reading Rd | from the Main St/Cornell Rd intersection to the Main St/Sharon Rd intersection | Reduce to 2 travel lanes with dedicated on-street parking. Includes sidewalk and intersection enhancements. Electric charging stations. | traffic operations/safety | 2024 | PE-ENV | State | 141.440 | 3Q26 | |
119072 | Ohio | Hamilton | City of Sharonville | HAM US 42 14.47 Reading Rd | from the Main St/Cornell Rd intersection to the Main St/Sharon Rd intersection | Reduce to 2 travel lanes with dedicated on-street parking. Includes sidewalk and intersection enhancements. Electric charging stations. | traffic operations/safety | 2024 | PE-DD | State | 24.950 | 3Q26 | |
119072 | Ohio | Hamilton | City of Sharonville | HAM US 42 14.47 Reading Rd | from the Main St/Cornell Rd intersection to the Main St/Sharon Rd intersection | Reduce to 2 travel lanes with dedicated on-street parking. Includes sidewalk and intersection enhancements. Electric charging stations. | traffic operations/safety | 2026 | CO | OKI-STBG | 3.510.544 | 3Q26 | |
119072 | Ohio | Hamilton | City of Sharonville | HAM US 42 14.47 Reading Rd | from the Main St/Cornell Rd intersection to the Main St/Sharon Rd intersection | Reduce to 2 travel lanes with dedicated on-street parking. Includes sidewalk and intersection enhancements. Electric charging stations. | traffic operations/safety | 2026 | CO | Local | 1.450.140 | 3Q26 | |
119072 | Ohio | Hamilton | City of Sharonville | HAM US 42 14.47 Reading Rd | from the Main St/Cornell Rd intersection to the Main St/Sharon Rd intersection | Reduce to 2 travel lanes with dedicated on-street parking. Includes sidewalk and intersection enhancements. Electric charging stations. | traffic operations/safety | 2026 | CE | Labor | 347.248 | 3Q26 | |
119074 | Ohio | Hamilton | Sycamore Twp | HAM School & Solzman Sidewalk | School Rd from corporation limit at Stewart Elem to Solzman Rd and along Solzman to East Kemper | Install new sidewalk | bicycle/pedestrian/other | 2026 | CO | OKI-TA | 641.224 | 2Q26 | |
119074 | Ohio | Hamilton | Sycamore Twp | HAM School & Solzman Sidewalk | School Rd from corporation limit at Stewart Elem to Solzman Rd and along Solzman to East Kemper | Install new sidewalk | bicycle/pedestrian/other | 2026 | CO | Local | 641.224 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2023 | PE | State | 11.380 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2023 | PE-RWS | State | 60.000 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2025 | RW | OKI-STBG | 400.000 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2025 | RW | Local | 100.000 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2026 | CO | OKI-STBG | 1.227.140 | 2Q26 | |
119075 | Ohio | Warren | City of Mason | WAR Tylersville & Mason Montgomery | Tylersville Rd and Mason-Montgomery Rd Intersection | Add right turn lanes on Tylersville Rd, and add left turn lanes on Mason-Montgomery Rd. New lighting, signal mast arm, adaptive system and fiber connection. | traffic operations/safety | 2026 | CO | Local | 306.785 | 2Q26 | |
119083 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 17.73 | HAM SR 126 17.73 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Grouped Project | 2026 | ENV | State | 60.000 | ||
119083 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 17.73 | HAM SR 126 17.73 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Grouped Project | 2027 | DD | State | 40.000 | ||
119137 | Ohio | Hamilton | Woodlawn, Village of | HAM Redna Terrace Reconstruction | Redna Terrace between Chester Road and Taconic Terrace | Complete removal of approximately 2,160 linear feet of concrete street and reconstruction with a 12" aggregate/concrete pavement section, including new curb and gutter, pavement markings, and traffic | Grouped Project | 2024 | CO | State | 100.000 | ||
119137 | Ohio | Hamilton | Woodlawn, Village of | HAM Redna Terrace Reconstruction | Redna Terrace between Chester Road and Taconic Terrace | Complete removal of approximately 2,160 linear feet of concrete street and reconstruction with a 12" aggregate/concrete pavement section, including new curb and gutter, pavement markings, and traffic | Grouped Project | 2024 | CO | Local | 1.059.000 | ||
119272 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 52 35.89 | HAM US 52 at SLM 35.89 | Bridge bearing repairs and some pavement repairs to improve the bump at the bridge carrying HAM-52 over Kellogg Ave | Grouped Project | 2025 | CO | State | 133.646 | ||
119293 | Ohio | Hamilton | Sharonville, City of | HAM Mosteller Rd Rehabilitation | Mosteller Road from I-275 to Crescentville Road | Road rehabilitation of Mosteller Road from I-275 to Crescentville Road and traffic signal rebuilds at Mosteller and Commerce and Mosteller and Crescentville for heavily used industrial corridor. | Grouped Project | 2024 | CO | Local | 917.000 | ||
119293 | Ohio | Hamilton | Sharonville, City of | HAM Mosteller Rd Rehabilitation | Mosteller Road from I-275 to Crescentville Road | Road rehabilitation of Mosteller Road from I-275 to Crescentville Road and traffic signal rebuilds at Mosteller and Commerce and Mosteller and Crescentville for heavily used industrial corridor. | Grouped Project | 2025 | CO | State | 100.000 | ||
119356 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Grouped Project | 2027 | ENV | Preservation | 200.000 | ||
119356 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Grouped Project | 2027 | ENV | State | 50.000 | ||
119436 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 7.80 | northbound HAM-75 at the interchange with HAM-562: SLM 7.80-7.86 | Remediation of pavement on mainline I-75. Project will install a load transfer platform to support the pavement structure. | Grouped Project | 2024 | DD | State | 91.100 | ||
119618 | Ohio | Hamilton | Kentucky, Commonwealth of | Daniel Carter Beard Repair SFY24 | HAM-471-0.00 | Daniel Carter Beard NB & SB Bridge repairs. | Grouped Project | 2024 | CO | State | 337.500 | ||
119618 | Ohio | Hamilton | Kentucky, Commonwealth of | Daniel Carter Beard Repair SFY24 | HAM-471-0.00 | Daniel Carter Beard NB & SB Bridge repairs. | Grouped Project | 2024 | CO | Local | 2.050.050 | ||
119619 | Ohio | Hamilton | Kentucky, Commonwealth of | Clay Wade Bailey Repair SFY 24 | HAM-42-0.00 | Clay Wade Bailey Bridge Repair SFY 25 | Grouped Project | 2025 | CO | State | 250.000 | ||
119619 | Ohio | Hamilton | Kentucky, Commonwealth of | Clay Wade Bailey Repair SFY 24 | HAM-42-0.00 | Clay Wade Bailey Bridge Repair SFY 25 | Grouped Project | 2024 | CO | State | 253.000 | ||
119697 | Ohio | Warren | D08 Facilities | WAR IR 71 NB SB Rest Areas | NB and SB rest areas on I-71 in Warren County | Purchase order for labor and material for addition of curb and security bollards to the I-71 NB and SB rest areas in Warren County. | Grouped Project | 2024 | OTH | State | 40.000 | ||
119700 | Ohio | Clermont | Bethel, Village of | CLE SR 125 14.08 | SR-125 (W Plane St): from SLM 14.08 (Grant Career Center driveway) to SLM 14.56 (Harris Ave) | Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks. | Grouped Project | 2025 | RW | Safety | 128.195 | ||
119734 | Ohio | Butler | Hamilton, City of | BUT South G St Bridge Demolition | South G Street Bridge (SFN 0960306) in the City of Hamilton | Demolition of the South G Street bridge (SFN 0960306). | Grouped Project | 2024 | DD | Local Programs | 17.203 | ||
119734 | Ohio | Butler | Hamilton, City of | BUT South G St Bridge Demolition | South G Street Bridge (SFN 0960306) in the City of Hamilton | Demolition of the South G Street bridge (SFN 0960306). | Grouped Project | 2025 | CO | Local Programs | 784.902 | ||
119752 | Ohio | Hamilton | Symmes, Township of | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Grouped Project | 2024 | RW | Safety | 216.993 | ||
119753 | Ohio | Hamilton | Cincinnati, City of | HAM US 42 9.25 | Reading & Summit intersection | Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal. | Grouped Project | 2026 | CO | Local | 120.000 | ||
119753 | Ohio | Hamilton | Cincinnati, City of | HAM US 42 9.25 | Reading & Summit intersection | Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal. | Grouped Project | 2026 | CO | Safety | 1.080.000 | ||
119754 | Ohio | Hamilton | Cincinnati, City of | HAM Cincinnati Ped FY25 | City of Cincinnati | Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps. | Grouped Project | 2025 | CO | Local | 109.000 | ||
119754 | Ohio | Hamilton | Cincinnati, City of | HAM Cincinnati Ped FY25 | City of Cincinnati | Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps. | Grouped Project | 2025 | CO | Safety | 981.000 | ||
119757 | Ohio | Hamilton | Loveland, City of | HAM CR 299 5.78 Loveland Madeira | SLM 5.78-6.50 | Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB. | Grouped Project | 2025 | RW | Safety | 141.876 | ||
119765 | Ohio | Butler | Monroe, City of | BUT Monroe Ped Project FY2026 | City of Monroe | Various pedestrian facility improvements throughout the City of Monroe, including new sidewalks, ADA curb ramps, and improved signage and pavement markings. | Grouped Project | 2025 | DD | Safety | 17.177 | ||
119765 | Ohio | Butler | Monroe, City of | BUT Monroe Ped Project FY2026 | City of Monroe | Various pedestrian facility improvements throughout the City of Monroe, including new sidewalks, ADA curb ramps, and improved signage and pavement markings. | Grouped Project | 2026 | CO | Safety | 627.063 | ||
119771 | Ohio | Butler | Oxford, City of | BUT Oxford S Locust Sidewalks | South Locust St from near W. Spring St to near Brookview Ct | Construct new concrete sidewalk at two locations along the east side of South Locust Street. The first proposed location is at the northeast corner of S. Locust St. and W. Spring St. The second propo | Grouped Project | 2024 | DD | Safety | 18.166 | ||
119771 | Ohio | Butler | Oxford, City of | BUT Oxford S Locust Sidewalks | South Locust St from near W. Spring St to near Brookview Ct | Construct new concrete sidewalk at two locations along the east side of South Locust Street. The first proposed location is at the northeast corner of S. Locust St. and W. Spring St. The second propo | Grouped Project | 2025 | CO | Safety | 334.800 | ||
119772 | Ohio | Butler | Hamilton, City of | BUT MR 990 0.920 | Ross Ave from Urban St to C st | Constructing curb bump outs and other improvements along Ross Avenue. | Grouped Project | 2025 | RW | Safety | 90.000 | ||
119776 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 81 0.00 | Trenton Franklin Rd (CR-81); 0.000 to 1.216 | Widen Trenton Franklin Rd (CR-81) in Butler County. Project to also include rumble stripes and removal of fixed objects within the clear zone. | Grouped Project | 2026 | CO | Local | 345.252 | ||
119776 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 81 0.00 | Trenton Franklin Rd (CR-81); 0.000 to 1.216 | Widen Trenton Franklin Rd (CR-81) in Butler County. Project to also include rumble stripes and removal of fixed objects within the clear zone. | Grouped Project | 2026 | CO | Safety | 4.438.948 | ||
119841 | Ohio | Butler | Fairfield, City of | BUT Seward & Tylersville Roundbt | Intersection of Seward and Tylersville Roads | Right of Way real estate services and acquisition for the construction of a single lane roundabout, including turn lanes on the east and west legs, to replace the existing signalized intersection of S | Grouped Project | 2024 | RW | State | 49.800 | ||
119894 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 2.50 Lg Jts | HAM IR 75: SLM 2.5 - 7.9 | GAP project in FY25 to repair longitudinal joints on a portion of HAM-75 | Grouped Project | 2025 | CO | Preservation | 2.919.830 | ||
119894 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 2.50 Lg Jts | HAM IR 75: SLM 2.5 - 7.9 | GAP project in FY25 to repair longitudinal joints on a portion of HAM-75 | Grouped Project | 2025 | CO | State | 324.426 | ||
119933 | Ohio | District | ODOT SPONSORING AGENCY | HAM Gore Point Flashers-FY24 | HAM-71SB at Reading/Gilbert and HAM-75SB at 2nd St | Purchase 2 solar gore point flashers for IR-71 south where Reading Rd and Gilbert Rd split and for IR-75 south at 2nd St. | Grouped Project | 2024 | OTH | State | 7.355 | ||
119991 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 23 2.12 Kyles Station Rd | Kyles Station Rd from 0.57 miles east of Lesourdsville West Chester Rd to 0.71 miles east of Lesourd | Replace existing bridge BUT CR 23 2.12 (SFN: 0932604) carrying Kyles Station Rd over Gregory Creek. Widen approaches, add sidewalk and upgrade guardrail. | Grouped Project | 2024 | PE-ENV | Local Programs | 20.310 | ||
119991 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 23 2.12 Kyles Station Rd | Kyles Station Rd from 0.57 miles east of Lesourdsville West Chester Rd to 0.71 miles east of Lesourd | Replace existing bridge BUT CR 23 2.12 (SFN: 0932604) carrying Kyles Station Rd over Gregory Creek. Widen approaches, add sidewalk and upgrade guardrail. | Grouped Project | 2024 | PE-ENV | Local | 5.077 | ||
119991 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT CR 23 2.12 Kyles Station Rd | Kyles Station Rd from 0.57 miles east of Lesourdsville West Chester Rd to 0.71 miles east of Lesourd | Replace existing bridge BUT CR 23 2.12 (SFN: 0932604) carrying Kyles Station Rd over Gregory Creek. Widen approaches, add sidewalk and upgrade guardrail. | Grouped Project | 2026 | PE-DD | Local Programs | 280.100 | ||
120070 | Ohio | Clinton | ODOT SPONSORING AGENCY | CLI IR-71-A-NEVI-RD2 | IR 71 WAR 11.144 - CLI 9.898 | Installing electric vehicle charging stations along IR 71. | Grouped Project | 2024 | CO | Local | 200.000 | ||
120070 | Ohio | Clinton | ODOT SPONSORING AGENCY | CLI IR-71-A-NEVI-RD2 | IR 71 WAR 11.144 - CLI 9.898 | Installing electric vehicle charging stations along IR 71. | Grouped Project | 2024 | CO | Other | 800.000 | ||
120090 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT TR 121 1.03 | Dimmick Rd and McCauly Rd | Construct a single-lane roundabout at Dimmick Road and McCauly Road. | Grouped Project | 2026 | CO | Local | 72.117 | ||
120090 | Ohio | Butler | BUTLER COUNTY ENGINEER | BUT TR 121 1.03 | Dimmick Rd and McCauly Rd | Construct a single-lane roundabout at Dimmick Road and McCauly Road. | Grouped Project | 2026 | CO | Safety | 1.030.242 | ||
120108 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-SR 747/SR 129 | BUT SR-747/BUT SR-129 interchange | Complete a feasibility study at the SR-747/SR-129 interchange to improve capacity and safety. | Grouped Project | 2024 | ENV | State | 17.000 | ||
120108 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT-SR 747/SR 129 | BUT SR-747/BUT SR-129 interchange | Complete a feasibility study at the SR-747/SR-129 interchange to improve capacity and safety. | Grouped Project | 2024 | ENV | Safety | 153.000 | ||
120142 | Ohio | Hamilton | City of Cincinnati | HAM City of Cincinnati EV Charge | Five parking facilities in Cincinnati OTR and CBD | Install EV Chargers at 5 3CDC parking facilities in Cincinnati OTR and CBD | other | 2025 | CO | OKI-CRP | 558.751 | FY25 | |
120142 | Ohio | Hamilton | City of Cincinnati | HAM City of Cincinnati EV Charge | Five parking facilities in Cincinnati OTR and CBD | Install EV Chargers at 5 3CDC parking facilities in Cincinnati OTR and CBD | other | 2025 | CO | Local | 139.688 | FY25 | |
120144 | Ohio | Hamilton | Green Twp | HAM Green Twp EV Charging | Green Twp Government Complex at Veterans Park | Install EV Chargers at Green Twp Govt. Complex/Veteran's Park parking lot | other | 2025 | CO | OKI-CRP | 193.636 | FY24 | |
120144 | Ohio | Hamilton | Green Twp | HAM Green Twp EV Charging | Green Twp Government Complex at Veterans Park | Install EV Chargers at Green Twp Govt. Complex/Veteran's Park parking lot | other | 2025 | CO | Local | 64.545 | FY24 | |
120144 | Ohio | Hamilton | Green Twp | HAM Green Twp EV Charging | Green Twp Government Complex at Veterans Park | Install EV Chargers at Green Twp Govt. Complex/Veteran's Park parking lot | other | 2025 | CE | OKI-CRP | 19.364 | FY24 | |
120144 | Ohio | Hamilton | Green Twp | HAM Green Twp EV Charging | Green Twp Government Complex at Veterans Park | Install EV Chargers at Green Twp Govt. Complex/Veteran's Park parking lot | other | 2025 | CE | Local | 6.455 | FY24 | |
120145 | Ohio | Hamilton | Hamilton County | HAM Hamilton County EV Charging | Hamilton County Communications Facility | Install EV Chargers at Hamilton County Department of Environmental Services facility | other | 2025 | CO | OKI-CRP | 29.367 | FY24 | |
120145 | Ohio | Hamilton | Hamilton County | HAM Hamilton County EV Charging | Hamilton County Communications Facility | Install EV Chargers at Hamilton County Department of Environmental Services facility | other | 2025 | CO | Local | 7.342 | FY24 | |
120145 | Ohio | Hamilton | Hamilton County | HAM Hamilton County EV Charging | Hamilton County Communications Facility | Install EV Chargers at Hamilton County Department of Environmental Services facility | other | 2025 | CE | OKI-CRP | 3.263 | FY24 | |
120145 | Ohio | Hamilton | Hamilton County | HAM Hamilton County EV Charging | Hamilton County Communications Facility | Install EV Chargers at Hamilton County Department of Environmental Services facility | other | 2025 | CE | Local | 816 | FY24 | |
120165 | Ohio | Warren | Lebanon, City of | WAR SR 48 15.34 | SR 123: from corp. to Hart Rd; US 42: from Miller Rd to corp.; SR 48: from Warren St to corp. (N of | Part 1: Construct a shared use path within the City of Lebanon along N Broadway St (SR-48) from the existing path near the fire station to Miller Rd (TR-101).Part 2: FY 25 Urban Paving project in the | Grouped Project | 2025 | CO | Preservation | 1.500.000 | ||
120165 | Ohio | Warren | Lebanon, City of | WAR SR 48 15.34 | SR 123: from corp. to Hart Rd; US 42: from Miller Rd to corp.; SR 48: from Warren St to corp. (N of | Part 1: Construct a shared use path within the City of Lebanon along N Broadway St (SR-48) from the existing path near the fire station to Miller Rd (TR-101).Part 2: FY 25 Urban Paving project in the | Grouped Project | 2025 | CO | Safety | 1.000.000 | ||
120254 | Ohio | Butler | Hamilton, City of | BUT Crawford Woods SRTS 2023 | Hancock Ave (CR-20): from SLM 0.53 (Vista Dr) to SLM 0.99 (Bender Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods E | Grouped Project | 2024 | ENV | Local Programs | 46.255 | ||
120254 | Ohio | Butler | Hamilton, City of | BUT Crawford Woods SRTS 2023 | Hancock Ave (CR-20): from SLM 0.53 (Vista Dr) to SLM 0.99 (Bender Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods E | Grouped Project | 2025 | DD | Local Programs | 17.925 | ||
120258 | Ohio | Hamilton | Madeira, City of | HAM Madeira SRTS 2023 | Shewango Way (MR-3843): from SLM 0.00 (Hosbrook Rd) to SLM 0.38 (Miami Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira. | Grouped Project | 2024 | ENV | Local Programs | 113.269 | ||
120258 | Ohio | Hamilton | Madeira, City of | HAM Madeira SRTS 2023 | Shewango Way (MR-3843): from SLM 0.00 (Hosbrook Rd) to SLM 0.38 (Miami Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira. | Grouped Project | 2025 | DD | Local Programs | 11.461 | ||
120316 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 126 1.40 | SR 126: from SLM 1.40 (west of Perry Lane) to SLM 1.86 (west of Glendale Milford Road) | Study SR 126 through Miamiville to determine recommendations to improve drainage and implement improvements. | Grouped Project | 2024 | ENV | State | 24.365 | ||
120333 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 127 14.82 | HAM-127-14.82 | Traffic analysis at US-127 & I-275 interchange. | Grouped Project | 2024 | ENV | State | 39.120 | ||
120341 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 10.15 | 0.07 to 0.54 miles north of Davis Street on I-75 northbound. | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural s | Grouped Project | 2026 | CO | State | 405.300 | ||
120369 | Ohio | Warren | Warren County Engineer | WAR TR 147 0.47 Grog Run Road | Grog Run Road: 100' either side of bridge (SFN 8333076) | Bridge rehabilitation (SFN 8333076) consisting of replacing the deteriorated superstructure. | Grouped Project | 2026 | CO | Local Programs | 540.000 | ||
120460 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR FY2024 Traffic Operations | IR-75 ramps at SR 63 (EXIT #28) | Traffic control operations on the IR-75 ramps at SR 63 in Warren County for Black Friday 2023. | Grouped Project | 2024 | OTH | State | 9.526 | ||
120545 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM CR 239 8.28 Winton Rd | 150' north and south of the structure | Removal and replacement of Bridge (SFN 3137384) on Winton Road with a culvert. | Grouped Project | 2024 | ENV | Local Programs | 174.107 | ||
120545 | Ohio | Hamilton | HAMILTON COUNTY ENGINEER | HAM CR 239 8.28 Winton Rd | 150' north and south of the structure | Removal and replacement of Bridge (SFN 3137384) on Winton Road with a culvert. | Grouped Project | 2025 | DD | Local Programs | 24.053 | ||
120571 | Ohio | Butler | Middletown, City of | BUT SR 122 9.64 | BUT SR 122: SLM 9.64 - 11.22 | FY2027 Urban Paving in the City of Middletown on a portion of US 122 | Grouped Project | 2027 | CO | Preservation | 1.435.500 | ||
120580 | Ohio | Hamilton | Kentucky, Commonwealth of | Taylor Southgate Brdg- Cable Rep | HAM-27-0.00 | Taylor Southgate Safety Cable Repairs - KYTC Lead Project | Grouped Project | 2025 | CO | Local | 247.500 | ||
120580 | Ohio | Hamilton | Kentucky, Commonwealth of | Taylor Southgate Brdg- Cable Rep | HAM-27-0.00 | Taylor Southgate Safety Cable Repairs - KYTC Lead Project | Grouped Project | 2025 | CO | State | 82.500 | ||
120664 | Ohio | Hamilton | Kentucky, Commonwealth of | Combs-Hehl Brdg T1 Repair | HAM-275-41.6 | Combs-Hehl Bridge T1 Repairs. | Grouped Project | 2025 | CO | Major Programs | 473.800 | ||
120664 | Ohio | Hamilton | Kentucky, Commonwealth of | Combs-Hehl Brdg T1 Repair | HAM-275-41.6 | Combs-Hehl Bridge T1 Repairs. | Grouped Project | 2025 | CO | State | 118.450 | ||
120673 | Ohio | Warren | Warren County Engineer | WAR CR 182 0.08 Bridge Rehab | Bridge WAR CR 182 0.08 (SFN 8333475) carrying Oregonia Road over Hawleys Run | Project will rehab bridge WAR CR 182 0.08 (SFN 8333475) carrying CR 182 (Oregonia Road) over Hawleys Run. | Grouped Project | 2027 | CO | State | 2.146.335 | ||
120723 | Ohio | Hamilton | City of Springdale | HAM CR 266 8.40 Kemper Northland | Northland Blvd and Kemper Road in the City of Springdale | Realignment of the intersection. Construction of shared use path on Kemper between Lawnview and SR 747 and connecting to the Northland Blvd SUP to the south of the intersection. | traffic operations/safety | 2027 | CO | OKI-STBG | 4.078.825 | FY27 | |
120723 | Ohio | Hamilton | City of Springdale | HAM CR 266 8.40 Kemper Northland | Northland Blvd and Kemper Road in the City of Springdale | Realignment of the intersection. Construction of shared use path on Kemper between Lawnview and SR 747 and connecting to the Northland Blvd SUP to the south of the intersection. | traffic operations/safety | 2027 | CO | Local | 1.019.706 | FY27 | |
120723 | Ohio | Hamilton | City of Springdale | HAM CR 266 8.40 Kemper Northland | Northland Blvd and Kemper Road in the City of Springdale | Realignment of the intersection. Construction of shared use path on Kemper between Lawnview and SR 747 and connecting to the Northland Blvd SUP to the south of the intersection. | traffic operations/safety | 2027 | CE | Local | 356.897 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2026 | PE-RWS | OKI-CMAQ | 48.000 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2026 | PE-RWS | Local | 12.000 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2026 | RW | OKI-CMAQ | 48.000 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2026 | RW | Local | 12.000 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2027 | CO | OKI-CMAQ | 1.653.418 | FY27 | |
120726 | Ohio | Butler | MetroParks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from TimberHill to Rockdale Rd | Continuation of Great Miami River Trail 1.1 miles | bicycle/pedestrian/other | 2027 | CO | Local | 413.355 | FY27 | |
120730 | Ohio | Warren | City of Mason | WAR Mason VAR Signals | Various routes in the city of Mason | Detection upgrades to several signals within the City of Mason. Also the addition of flashing yellow signals and upgrades to pushbuttons | traffic operations/safety | 2027 | CO | OKI-STBG | 877.972 | FY27 | |
120730 | Ohio | Warren | City of Mason | WAR Mason VAR Signals | Various routes in the city of Mason | Detection upgrades to several signals within the City of Mason. Also the addition of flashing yellow signals and upgrades to pushbuttons | traffic operations/safety | 2027 | CO | Local | 219.493 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2025 | PE-RWS | OKI-CMAQ | 177.750 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2025 | PE-RWS | Local | 47.250 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2025 | RW | OKI-CMAQ | 476.370 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2025 | RW | Local | 126.630 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2027 | CO | OKI-CMAQ | 3.982.734 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2027 | CO | Local | 1.058.701 | FY27 | |
120732 | Ohio | Hamilton | City of Loveland | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Av to just past the intersection with Valley View Ln | Improve access management, install median islands, add sidewalk and multi-use path, add roundabout at Valley View Lane | traffic operations/safety | 2027 | CE | Local | 352.900 | FY27 | |
120734 | Ohio | Warren | Warren County TID | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | Adding two-way left turn lane from east of McClure to west of Neil Armstron Way. Includes curb and gutter, storm sewers, shared use path on north side and bridge replacement | traffic operations/safety | 2027 | CO | OKI-STBG | 5.721.104 | FY27 | |
120734 | Ohio | Warren | Warren County TID | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | Adding two-way left turn lane from east of McClure to west of Neil Armstron Way. Includes curb and gutter, storm sewers, shared use path on north side and bridge replacement | traffic operations/safety | 2027 | CO | Local | 2.451.902 | FY27 | |
120734 | Ohio | Warren | Warren County TID | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | Adding two-way left turn lane from east of McClure to west of Neil Armstron Way. Includes curb and gutter, storm sewers, shared use path on north side and bridge replacement | traffic operations/safety | 2027 | CE | Local | 534.683 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2025 | PE-ENV | Federal Discretionary | 562.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2025 | PE-ENV | Local | 140.625 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2025 | PE-RWS | OKI-STBG | 39.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2025 | PE-RWS | Local | 10.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2026 | PE-DD | Federal Discretionary | 62.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2026 | PE-DD | Local | 15.625 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2026 | RW | OKI-STBG | 1.461.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2026 | RW | Local | 388.500 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2027 | CO | OKI-STBG | 4.400.608 | FY27 | |
120771 | Ohio | Butler | Butler County TID | BUT North Hamilton Xing Ph1 | Intersection of West Elkton and NW Washington, intersection of West Elkton and North B Street | Convert two intersections to roundabouts and add new sidewalk and multi-use path | traffic operations/safety | 2027 | CO | Local | 1.559.709 | FY27 | |
120782 | Ohio | Hamilton | City of Cincinnati | HAM CR 163 1.87 WNB Corridor | Westwood Northern Boulevard Corridor | Development of WNB Corridor Plan, a comprehensie corridor study focused on improvements to address safety for traffic, pedestrians and bicyclists, and improved transit | Grouped Project | 2025 | PE_ENV | Federal Discretionary | 1.517.000 | ||
120782 | Ohio | Hamilton | City of Cincinnati | HAM CR 163 1.87 WNB Corridor | Westwood Northern Boulevard Corridor | Development of WNB Corridor Plan, a comprehensie corridor study focused on improvements to address safety for traffic, pedestrians and bicyclists, and improved transit | Grouped Project | 2026 | PE-DD | Federal Discretionary | 758.000 | ||
120802 | Ohio | Hamilton | DISTRICT 8 ENGINEERING | HAM IR 74 0.00 Cable | I-74 from Indiana state line to I-275 | Install median cable barrier on I-74 from the Indiana State Line to I-275. | Grouped Project | 2026 | CO | Safety | 2.000.000 | ||
120802 | Ohio | Hamilton | DISTRICT 8 ENGINEERING | HAM IR 74 0.00 Cable | I-74 from Indiana state line to I-275 | Install median cable barrier on I-74 from the Indiana State Line to I-275. | Grouped Project | 2026 | CO | Labor | 140.000 | ||
120803 | Ohio | Warren | ODOT | WAR SR 48 24.63 | SR-48 nd Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout | traffic operations/safety | 2025 | PE-ENV | Safety | 373.333 | FY27 | |
120803 | Ohio | Warren | ODOT | WAR SR 48 24.63 | SR-48 nd Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout | traffic operations/safety | 2025 | PE-DD | Safety | 186.667 | FY27 | |
120803 | Ohio | Warren | ODOT | WAR SR 48 24.63 | SR-48 nd Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout | traffic operations/safety | 2026 | PE-RWS | Safety | 200.000 | FY27 | |
120803 | Ohio | Warren | ODOT | WAR SR 48 24.63 | SR-48 nd Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout | traffic operations/safety | 2026 | RW | Safety | 100.000 | FY27 | |
120803 | Ohio | Warren | ODOT | WAR SR 48 24.63 | SR-48 nd Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout | traffic operations/safety | 2028 | CO | Safety | 2.996.000 | FY27 | |
120804 | Ohio | Hamilton | ODOT | HAM IR 75/IR 275 Interchange | I 75 and I 275 Interchange and I 75 north to Union Centre Boulevard | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should consider additional capacity from the interchange N. to Union Centre Blvd | widening/relocation | 2025 | PE-ENV | Major New | 5.600.000 | ||
120804 | Ohio | Hamilton | ODOT | HAM IR 75/IR 275 Interchange | I 75 and I 275 Interchange and I 75 north to Union Centre Boulevard | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should consider additional capacity from the interchange N. to Union Centre Blvd | widening/relocation | 2025 | PE-ENV | State | 1.400.000 | ||
120804 | Ohio | Hamilton | ODOT | HAM IR 75/IR 275 Interchange | I 75 and I 275 Interchange and I 75 north to Union Centre Boulevard | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should consider additional capacity from the interchange N. to Union Centre Blvd | widening/relocation | 2027 | PE-DD | Uncommitted | 3.000.000 | ||
120804 | Ohio | Hamilton | ODOT | HAM IR 75/IR 275 Interchange | I 75 and I 275 Interchange and I 75 north to Union Centre Boulevard | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should consider additional capacity from the interchange N. to Union Centre Blvd | widening/relocation | 2029 | CO | Uncommitted | 61.000.000 | ||
120850 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Lick Run Connector | Extend existing paths in Lick Run project along Sunset Avenue, Rapid Run Park and Queen City Ave | new shared use path on Queen City and Rapid Run, with 2-way protected bike lane on Sunset, connecting to existing trails in Dunham CRC, Glenway Avenue and Rapid Run Park | bicycle/pedestrian/other | 2026 | RW | OKI-CMAQ | 120.000 | FY28 | |
120850 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Lick Run Connector | Extend existing paths in Lick Run project along Sunset Avenue, Rapid Run Park and Queen City Ave | new shared use path on Queen City and Rapid Run, with 2-way protected bike lane on Sunset, connecting to existing trails in Dunham CRC, Glenway Avenue and Rapid Run Park | bicycle/pedestrian/other | 2026 | RW | Local | 30.000 | FY28 | |
120850 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Lick Run Connector | Extend existing paths in Lick Run project along Sunset Avenue, Rapid Run Park and Queen City Ave | new shared use path on Queen City and Rapid Run, with 2-way protected bike lane on Sunset, connecting to existing trails in Dunham CRC, Glenway Avenue and Rapid Run Park | bicycle/pedestrian/other | 2028 | CO | OKI-CMAQ | 7.880.000 | FY28 | |
120850 | Ohio | Hamilton | City of Cincinnati | HAM Cincinnati Lick Run Connector | Extend existing paths in Lick Run project along Sunset Avenue, Rapid Run Park and Queen City Ave | new shared use path on Queen City and Rapid Run, with 2-way protected bike lane on Sunset, connecting to existing trails in Dunham CRC, Glenway Avenue and Rapid Run Park | bicycle/pedestrian/other | 2028 | CO | Local | 1.970.000 | FY28 | |
120858 | Ohio | Hamilton | City of Cincinnati | HAM Reading & Asmann Sidewalk | Reading Rd between Asmann Ave and Police District 4, Asmann Ave between Reading Rd and Victory Pkwy | New sidewalk with pedestrian bumpouts, safety island and pavement markings | bicycle/pedestrian/other | 2026 | RW | OKI-TA | 56.000 | FY27 | |
120858 | Ohio | Hamilton | City of Cincinnati | HAM Reading & Asmann Sidewalk | Reading Rd between Asmann Ave and Police District 4, Asmann Ave between Reading Rd and Victory Pkwy | New sidewalk with pedestrian bumpouts, safety island and pavement markings | bicycle/pedestrian/other | 2026 | RW | Local | 14.000 | FY27 | |
120858 | Ohio | Hamilton | City of Cincinnati | HAM Reading & Asmann Sidewalk | Reading Rd between Asmann Ave and Police District 4, Asmann Ave between Reading Rd and Victory Pkwy | New sidewalk with pedestrian bumpouts, safety island and pavement markings | bicycle/pedestrian/other | 2027 | CO | OKI-TA | 944.000 | FY27 | |
120858 | Ohio | Hamilton | City of Cincinnati | HAM Reading & Asmann Sidewalk | Reading Rd between Asmann Ave and Police District 4, Asmann Ave between Reading Rd and Victory Pkwy | New sidewalk with pedestrian bumpouts, safety island and pavement markings | bicycle/pedestrian/other | 2027 | CO | Local | 236.000 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2026 | PE-RWS | OKI-TA | 44.991 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2026 | PE-RWS | Local | 44.991 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2026 | RW | OKI-TA | 22.496 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2026 | RW | Local | 22.496 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2027 | CO | OKI-TA | 334.556 | FY27 | |
120861 | Ohio | Hamilton | Colerain Twp | HAM CR 96 3.92 Springdale Rd | Along both sides of Springdale Rd between Poole Rd and Heritageway | New and replacement sidewalk | bicycle/pedestrian/other | 2027 | CO | Local | 334.556 | FY27 | |
120878 | Ohio | Butler | City of Fairfield | BUT GMRT Fairfield Extension | Between Waterworks Park and the roundabout at River and Gray Roads | Extension of Great Miami River Trail south to existing trail network in Marsh Park | bicycle/pedestrian/other | 2027 | CO | OKI-TA | 750.306 | 2Q27 | |
120878 | Ohio | Butler | City of Fairfield | BUT GMRT Fairfield Extension | Between Waterworks Park and the roundabout at River and Gray Roads | Extension of Great Miami River Trail south to existing trail network in Marsh Park | bicycle/pedestrian/other | 2027 | CO | Local | 750.306 | 2Q27 | |
120879 | Ohio | Butler | City of Fairfield | BUT US 127 0.61 | Between Hunter Rd. and Wessel Dr. | Construction of multi-use path adjacent to Pleasant Avenue (US 127) with curb, storm sewer, water, signage, crosswalks and traffic calming | bicycle/pedestrian/other | 2027 | CO | OKI-CMAQ | 1.738.290 | FY27 | |
120879 | Ohio | Butler | City of Fairfield | BUT US 127 0.61 | Between Hunter Rd. and Wessel Dr. | Construction of multi-use path adjacent to Pleasant Avenue (US 127) with curb, storm sewer, water, signage, crosswalks and traffic calming | bicycle/pedestrian/other | 2027 | CO | Local | 744.981 | FY27 | |
120924 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Grouped Project | 2026 | ENV | State | 100.000 | ||
120995 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 15.68 | HAM SR 126: SLM 15.68-19.41 | Resurfacing a portion of SR 126 in Hamilton County | Grouped Project | 2026 | CO | State | 431.244 | ||
120995 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 126 15.68 | HAM SR 126: SLM 15.68-19.41 | Resurfacing a portion of SR 126 in Hamilton County | Grouped Project | 2026 | CO | Preservation | 1.724.976 | ||
121004 | Ohio | Hamilton | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Grouped Project | 2027 | CO | Local | 266.537 | ||
121004 | Ohio | Hamilton | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Grouped Project | 2027 | CO | Preservation | 1.066.149 | ||
121077 | Ohio | Hamilton | City of Cincinnati | HAM CR 457 19.68 Structure Demo-WHV | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 HarrisoAv in Cincinnati. Sites were acquired as part of the WHV project and get removed for construction of western approach. | bridge/culvert replacement | 2024 | PE | State | 10.387 | FY25 | |
121077 | Ohio | Hamilton | City of Cincinnati | HAM CR 457 19.68 Structure Demo-WHV | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 HarrisoAv in Cincinnati. Sites were acquired as part of the WHV project and get removed for construction of western approach. | bridge/culvert replacement | 2025 | CO | OKI-STBG | 1.120.000 | FY25 | |
121077 | Ohio | Hamilton | City of Cincinnati | HAM CR 457 19.68 Structure Demo-WHV | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 HarrisoAv in Cincinnati. Sites were acquired as part of the WHV project and get removed for construction of western approach. | bridge/culvert replacement | 2025 | CO | Local | 280.000 | FY25 | |
121077 | Ohio | Hamilton | City of Cincinnati | HAM CR 457 19.68 Structure Demo-WHV | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 HarrisoAv in Cincinnati. Sites were acquired as part of the WHV project and get removed for construction of western approach. | bridge/culvert replacement | 2025 | CE | OKI-STBG | 112.000 | FY25 | |
121077 | Ohio | Hamilton | City of Cincinnati | HAM CR 457 19.68 Structure Demo-WHV | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 HarrisoAv in Cincinnati. Sites were acquired as part of the WHV project and get removed for construction of western approach. | bridge/culvert replacement | 2025 | CE | Local | 28.000 | FY25 | |
121240 | Ohio | District | ODOT SPONSORING AGENCY | D08 SIGNS FY2026 | Various locations in D8. TBD | FY2026 District 8 Wide Sign Support Maintenance and Sign Installation Work Orders | Grouped Project | 2026 | CO | Labor | 25.000 | ||
121240 | Ohio | District | ODOT SPONSORING AGENCY | D08 SIGNS FY2026 | Various locations in D8. TBD | FY2026 District 8 Wide Sign Support Maintenance and Sign Installation Work Orders | Grouped Project | 2026 | CO | Preservation | 250.000 | ||
121354 | Ohio | District | DISTRICT 8 TRAFFIC | D08 Traffic Materials FY24 | Locations vary based on material | District wide traffic operations material purchases from the safety maintenance funds. | Grouped Project | 2024 | OTH | State | 29.030 | ||
121406 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/WAR IR 75 0.00/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Grouped Project | 2027 | CO | Preservation | 2.700.000 | ||
121406 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT/WAR IR 75 0.00/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Grouped Project | 2027 | CO | State | 300.000 | ||
121407 | Ohio | District | ODOT SPONSORING AGENCY | D08 GR FY2028 | Locations TBD | District wide guardrail improvement in District 8 | Grouped Project | 2026 | RW | Labor | 60.000 | ||
121407 | Ohio | District | ODOT SPONSORING AGENCY | D08 GR FY2028 | Locations TBD | District wide guardrail improvement in District 8 | Grouped Project | 2027 | RW | State | 300.000 | ||
121409 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR IR 71 3.50 Study | WAR-71-3.60 | Complete signal phasing and lane use study at I-71/Kings Island Dr/Western Row Rd. | Grouped Project | 2024 | OTH | State | 5.692 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2025 | PE-ENV | Preservation | 200.000 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2025 | PE-ENV | State | 191.440 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2027 | PE-DD | Preservation | 160.000 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2027 | PE-DD | State | 40.000 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2027 | RW | Safety | 90.000 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2027 | RW | State | 10.000 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2029 | CO | Preservation | 4.307.200 | ||
121423 | Ohio | Warren | ODOT | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway | Project to replace and widen bridge WAR-22-0357 that carries US 22 over Bear Creek (no additional travel lanes). A left turn will be added on EB US 22 at Old 3C Highway. | maintenance/reconstruction | 2029 | CO | State | 1.076.800 | ||
121471 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 52 35.22 | HAM US 52: 35.216-40.066 | GAP project in FY2026 for joints repairs on US 52 in Hamilton County | Grouped Project | 2026 | CO | Preservation | 560.000 | ||
121471 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 52 35.22 | HAM US 52: 35.216-40.066 | GAP project in FY2026 for joints repairs on US 52 in Hamilton County | Grouped Project | 2026 | CO | State | 140.000 | ||
121472 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-5.0 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Grouped Project | 2027 | CO | Preservation | 560.000 | ||
121472 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-5.0 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Grouped Project | 2027 | CO | State | 140.000 | ||
121473 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 3.29 | HAM IR 75: SLM 3.28 | Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue due to a landslide. | Grouped Project | 2027 | DD | State | 75.000 | ||
121506 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 275 29.30 | HAM IR 275: SLM 29.3 | Repair and reconstruction of roadway embankment along IR 275 westbound near IR-74 in Hamilton County due to a landslide. | Grouped Project | 2027 | DD | State | 150.000 | ||
121527 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Grouped Project | 2027 | DD | State | 150.000 | ||
121610 | Ohio | Warren | Warren County Park District | WAR Landen Deerfield Park | Landen Deerfield Park (2258 W. US 22/SR 3, Maineville, OH 45039) | Full depth pavement repair and application of a cape seal to the roadways and parking areas within Landon Deerfield Park. | Grouped Project | 2024 | OTH | State | 140.078 | ||
121643 | Ohio | Hamilton | Ohio Rail Development Commission | CRISI Cincinnati Planning 2024 | Cincinnati, OH Queensgate Yard | The project is designed to begin to unravel the issues in and around Queensgate and evaluate future projects to mitigate these congestion issues, as well as create a prioritized project list by which | Grouped Project | 2024 | OTH | Local | 49.946 | ||
121704 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 8.24 Ramp T | On the Ramp from I-71 North to Ridge Ave, 1,300' south of the intersection with Ridge Ave. | Project to repair or replace damaged section of concrete retaining wall along the ramps from I71 North to Ridge Rd that retains Geier Street above. | Grouped Project | 2024 | ENV | State | 200.000 | ||
121704 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 71 8.24 Ramp T | On the Ramp from I-71 North to Ridge Ave, 1,300' south of the intersection with Ridge Ave. | Project to repair or replace damaged section of concrete retaining wall along the ramps from I71 North to Ridge Rd that retains Geier Street above. | Grouped Project | 2025 | CO | State | 150.000 | ||
121735 | Ohio | Hamilton | City of Cincinnati | HAM CR 163 5.5 Hopple St Bridge | Hopple Street Bridge | Maintenance and major prevenatative project | Grouped Project | 2026 | PE-ENV | Local | 28.245 | ||
121735 | Ohio | Hamilton | City of Cincinnati | HAM CR 163 5.5 Hopple St Bridge | Hopple Street Bridge | Maintenance and major prevenatative project | Grouped Project | 2027 | CO | Local Programs | 8.945.200 | ||
121735 | Ohio | Hamilton | City of Cincinnati | HAM CR 163 5.5 Hopple St Bridge | Hopple Street Bridge | Maintenance and major prevenatative project | Grouped Project | 2027 | CO | Local | 470.800 | ||
121801 | Ohio | Hamilton | Ohio Rail Development Commission | HAM Centron Pl 155109V ORPHAN | 39.2990656, -84.4717755 DOT #155109V Centron Pl Columbus, OH | Rail removal and road reconstruction at DOT #155109V Centron Pl in Springdale, OH. Proposed for ORDC's Orphan Rail Program. | Grouped Project | 2024 | CO | State | 28.245 | ||
121828 | Ohio | Butler | City of Fairfield | City of Fairfield EV Chargers | 3 locations in the City of Fairfield (Lane Library, Waterworks Park, and Harbin Park) | Install four Level 2 chargers (TDC Match) | other | 2026 | CO | OKI-CRP | 232.499 | 3Q26 | |
121829 | Ohio | Butler | Metroparks of Butler County | VOA MetroPark EV Charger | Metroparks of Butler County VOA MetroPark | Install three level 2 charger (TRC Match) | other | 2025 | PE-DD | OKI-CRP | 18.700 | 3Q26 | |
121829 | Ohio | Butler | Metroparks of Butler County | VOA MetroPark EV Charger | Metroparks of Butler County VOA MetroPark | Install three level 2 charger (TRC Match) | other | 2025 | PE-ENV | OKI-CRP | 36.300 | 3Q26 | |
121829 | Ohio | Butler | Metroparks of Butler County | VOA MetroPark EV Charger | Metroparks of Butler County VOA MetroPark | Install three level 2 charger (TRC Match) | other | 2026 | CO | OKI-CRP | 58.213 | 3Q26 | |
121830 | Ohio | Hamilton | Anderson Twp | Anderson Center EV Chargers | Anderson Center 7850 Five Mile Road | Install two level 2 chargers (TRC Match) | other | 2026 | CO | OKI-CRP | 50.753 | 3Q26 | |
121830 | Ohio | Hamilton | Anderson Twp | Anderson Center EV Chargers | Anderson Center 7850 Five Mile Road | Install two level 2 chargers (TRC Match) | other | 2025 | CO | Local | 5.075 | 3Q26 | |
121830 | Ohio | Hamilton | Anderson Twp | Anderson Center EV Chargers | Anderson Center 7850 Five Mile Road | Install two level 2 chargers (TRC Match) | other | 2026 | CO | Labor | 5.075 | 3Q26 | |
121831 | Ohio | Hamilton | City of Cincinnati | City of Cincinnati Mt. Washington NBD EV Chargers | Mt. Washington Neighborhood Business District (NBD) | Install one dual port DC Fast Charger (TRC Match) | other | 2026 | CO | OKI-CRP | 196.000 | 4Q26 | |
121832 | Ohio | Hamilton | City of Forest Park | City of Forest Park EV Chargers | City of Forest Park Municipal Campus 1201 W. Kemper Road | Install three level 2 chargers (TRC Match) | other | 2026 | CO | OKI-CRP | 32.413 | 4Q26 | |
121837 | Ohio | Butler | City of Trenton | City of Trenton EV Chargers | City of Trenton City Hall 11 East State Street | Install two level 2 chargers (TRC Match) | other | 2025 | CO | Local | 5.075 | 4Q26 | |
121837 | Ohio | Butler | City of Trenton | City of Trenton EV Chargers | City of Trenton City Hall 11 East State Street | Install two level 2 chargers (TRC Match) | other | 2026 | CO | OKI-CRP | 54.545 | 4Q26 | |
121837 | Ohio | Butler | City of Trenton | City of Trenton EV Chargers | City of Trenton City Hall 11 East State Street | Install two level 2 chargers (TRC Match) | other | 2026 | CO | Labor | 5.075 | 4Q26 | |
121868 | Ohio | Butler | City of Fairfield | BUT Seward Turn Lane & Realignment | Seward Road | Addition of left turn lane and realignment of Seward Road to provide access to new business | Grouped Project | 2025 | CO | Local | 140.968 | ||
121868 | Ohio | Butler | City of Fairfield | BUT Seward Turn Lane & Realignment | Seward Road | Addition of left turn lane and realignment of Seward Road to provide access to new business | Grouped Project | 2026 | CO | State | 100.000 | ||
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2025 | PE-ENV | Safety | 339.300 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2025 | PE-ENV | Local | 37.700 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2026 | PE-DD | Safety | 161.100 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2026 | PE-DD | Local | 17.900 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2027 | PE-RWS | Safety | 53.577 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2027 | PE-RWS | Local | 5.953 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2027 | RW | Safety | 180.000 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2027 | RW | Local | 20.000 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2028 | CO | Safety | 1.266.023 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2028 | CO | OKI-TA | 761.243 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2028 | CO | Local | 1.705.071 | FY28 | |
121899 | Ohio | Clermont | City of Loveland | CLE SR 48 6.65 | CLE-48-6.65 to WAR-48-0.47 | Install new sidewalk on SR48 in Loveland | bicycle/pedestrian | 2028 | CE | Local | 261.263 | FY28 | |
122048 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Reconstruction of Linn St over mainline 75. Work also includes Linn St approach work, W Court St, and Winchell Av. Project part of Ph 2 of BSB Corridor Project. See PID 113361 for design funds & RW | maintenance/reconstruction | 2026 | CO | State | 53.360.000 | 2Q26 | |
122048 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Reconstruction of Linn St over mainline 75. Work also includes Linn St approach work, W Court St, and Winchell Av. Project part of Ph 2 of BSB Corridor Project. See PID 113361 for design funds & RW | maintenance/reconstruction | 2026 | CE | Federal | 2.992.160 | 2Q26 | |
122048 | Ohio | Hamilton | ODOT | HAM IR 75 1.05 | Linn St overpass to northern limits of the bridge over Findlay St | Reconstruction of Linn St over mainline 75. Work also includes Linn St approach work, W Court St, and Winchell Av. Project part of Ph 2 of BSB Corridor Project. See PID 113361 for design funds & RW | maintenance/reconstruction | 2026 | CE | State | 3.748.040 | 2Q26 | |
122143 | Ohio | Butler | City of Hamilton | Hamilton SS4A Demonstration Grant | Knightsbridge Drive from Neilan Blvd to University Blvd in the City of Hamilton | Road diet & buffered bike lane. The project would serve to reduce speeds, add dedicated bike facilities & crosswalk improvements. Collection of volume & speed data. (Safe Streets for All-SS4A) | traffic operations/safety | 2025 | CO | Federal Discretionary | 400.000 | FY25 | |
122143 | Ohio | Butler | City of Hamilton | Hamilton SS4A Demonstration Grant | Knightsbridge Drive from Neilan Blvd to University Blvd in the City of Hamilton | Road diet & buffered bike lane. The project would serve to reduce speeds, add dedicated bike facilities & crosswalk improvements. Collection of volume & speed data. (Safe Streets for All-SS4A) | traffic operations/safety | 2025 | CO | Local | 100.000 | FY25 | |
122144 | Ohio | Hamilton | City of Cincinnati | Cincinnati Landslide & Retaining Wall Mitigation | Ten locations along major routes throughout the City | Provide long-term construction remedies at roadway or utility locations prone to landslides, hillside slippage, and retaining wall failures. | maintenance/reconstruction | 2025 | CO | Federal Discretionary | 10.079.824 | FY25 | |
122144 | Ohio | Hamilton | City of Cincinnati | Cincinnati Landslide & Retaining Wall Mitigation | Ten locations along major routes throughout the City | Provide long-term construction remedies at roadway or utility locations prone to landslides, hillside slippage, and retaining wall failures. | maintenance/reconstruction | 2025 | CO | Local | 2.519.956 | FY25 | |
122301 | Ohio | Butler | City of Fairfield | BUT Seward Rd Rail Crossing Impr | Seward Road at Tylersville Road and Union Centre Blvd | Profile improvements to Seward Road at grade railroad crossing to accommodate oversized trucks using lowboy trailers | Grouped Project | 2025 | CO | Local | 60.843 | ||
122301 | Ohio | Butler | City of Fairfield | BUT Seward Rd Rail Crossing Impr | Seward Road at Tylersville Road and Union Centre Blvd | Profile improvements to Seward Road at grade railroad crossing to accommodate oversized trucks using lowboy trailers | Grouped Project | 2026 | CO | State | 100.000 | ||
122306 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM IR 75 6.47 | I-75 NB: 35 feet south of Mitchell Ave Bridge to 150' north of bridge | Project to repair settlement of NB I-75 near the HAM-74-0647 bridge over Mitchell Ave. This will be a Purchase Order contract per DOT Contract 102-25. | Grouped Project | 2025 | OTH | State | 214.360 | ||
122358 | Ohio | Hamilton | ODOT | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge | widening/relocation | 2025 | PE-ENV | Major Programs | 560.000 | FY25 | |
122358 | Ohio | Hamilton | ODOT | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge | widening/relocation | 2025 | PE-ENV | State | 140.000 | FY25 | |
122358 | Ohio | Hamilton | ODOT | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge | widening/relocation | 2026 | PE-DD | Major Programs | 160.000 | FY25 | |
122358 | Ohio | Hamilton | ODOT | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge | widening/relocation | 2026 | PE-DD | State | 40.000 | FY25 | |
122364 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE IR-275-B-NEVI-RD2B | IR 275 CLE 9.020 - HAM 36.215 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 2025 | CO | Local | 180.000 | ||
122364 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE IR-275-B-NEVI-RD2B | IR 275 CLE 9.020 - HAM 36.215 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 2025 | CO | Other | 720.000 | ||
122364 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE IR-275-B-NEVI-RD2B | IR 275 CLE 9.020 - HAM 36.215 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 2025 | DD | Local | 200.000 | ||
122364 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM/CLE IR-275-B-NEVI-RD2B | IR 275 CLE 9.020 - HAM 36.215 | Installing electric vehicle charging stations on IR 275. | Grouped Project | 2025 | DD | Other | 800.000 | ||
122798 | Ohio | Butler | City of Oxford | BUT City of Oxford EV FY2026 | Oxford Municipal Building, Uptown Surface Lot | Install two DCFC EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 905.489 | 2Q26 | |
122808 | Ohio | Hamilton | City of Springdale | Springdale EV Charging | Springdale Municipal Building, Police/Fire, Springdale Elementary campus & Parks & Recreation | Install EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 480.325 | FY26 | |
122811 | Ohio | Hamilton | Anderson Twp | Anderson Twp EV Charging Station | Rec Plex, Bauer Preserve, Ohio River Trailhead | Install four DCFC EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 1.199.305 | 3Q26 | |
122813 | Ohio | Hamilton | City of Blue Ash | Blue Ash EV Charging Station | Madtree Parks and Rec at Summit Park | Install six Level 2 EV Charging Station at Mad Tree Parks and Rec (TRC Match) | other | 2026 | CO | OKI-CRP | 87.658 | 3Q26 | |
122816 | Ohio | Hamilton | City of Cincinnati | Cincinnati NBD's EV Charging | City of Cincinnati East Price Hill, Hartwell, and Madisonville NBD's | Install three DCFC EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 998.238 | 3Q26 | |
122817 | Ohio | Hamilton | City of Cincinnati | Cincinnati 3CDC EV Charging | 8th & Sycamore, Court & Walnut, Whex, and Ziegler Park garages in CBD and OTR | Install EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 895.972 | FY26 | |
122821 | Ohio | Butler | City of Fairfield | City of Fairfield EV Charging | Fairfield Community Arts Center & Justice Center | Install four Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 338.417 | 4Q26 | |
122822 | Ohio | Butler | City of Hamilton | BUT Hamilton EV Charging | Hamilton Justice Center, Kettering Hospital, Miami University Hamilton, Potters Golf Course | Install eight DCFC EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 1.597.068 | 3Q26 | |
122823 | Ohio | Hamilton | City of Harrison | HAM Harrison ComCntr EV Charging | City of Harrison Community Center | Install two DCFC EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 186.300 | 4Q26 | |
122824 | Ohio | Hamilton | Hamilton County | Hamilton County (CHPL) EV Charging | CHPL (North Central, Anderson, Harrison, Sharonville, Walnut Hills Branches) | Install ten Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 454.582 | 4Q26 | |
122826 | Ohio | Butler | City of Middletown | Middletown EV Charging | Middletown City Building, Jacot Park, Smith Park, Downtown | Install one DCFC and eleven Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 1.492.405 | 3Q26 | |
122828 | Ohio | Clermont | Union Township | CLE Union Twp EV Charging | EPOP and Township Civic Center | Install two DCFC and 10 Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 947.540 | 4Q26 | |
122829 | Ohio | Clermont | Village of New Richmond | New Richmond EV Charging | Willow Street and Western Avenue | Install two Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 133.445 | 4Q26 | |
122830 | Ohio | Butler | West Chester Township | BUT West Chester EV Charging | MidPointe Library, Community Development Building, and Administration Building | Install five Level 2 EV Charging Stations (TRC Match) | other | 2026 | CO | OKI-CRP | 211.370 | 4Q26 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2026 | PE-RWS | Local | 812.000 | FY27 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2027 | RW | Local | 200.000 | FY27 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2028 | CO | OKI-STBG | 2.811.802 | FY27 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2028 | CO | Local | 2.811.802 | FY27 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2028 | CO | OKI-TA | 704.579 | FY27 | |
122969 | Ohio | Clermont | Clermont County TID | CLE Bach Buxton Road Corridor Improvements | Shayler Road to Clepper Lane | Widen to add two-way left turn lane, install roundabouts at Shayler and near Provision Living senior houseing, add multi-use path | traffic operations/safety | 2028 | CO | Local | 704.579 | FY27 | |
122987 | Ohio | Butler | Miami University | BUT Miami Univ Airport OXD EV | Miami University Airport (OXD) | Install EV Charging Station (TRC Match) | other | 2026 | CO | OKI-CRP | 1.000.000 | FY26 | |
123369 | Ohio | Hamilton | City of Reading | HAM US 42 10.07 Reading Rd | US 42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised median | Grouped Project | 2025 | PE-ENV | Safety | 315.000 | FY27 | |
123369 | Ohio | Hamilton | City of Reading | HAM US 42 10.07 Reading Rd | US 42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised median | Grouped Project | 2025 | PE-ENV | State | 35.000 | FY27 | |
123504 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAV VAR Signal Timing | HAM VAR Signal Timing | Signal Timing Analyses along US22 near I-71, New Haven Rd near I-74, and Fields-Ertel/Mason Montgomery | Grouped Project | 2025 | OTH | Safety | 186.049 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2019 | PE | STBG | 144.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2019 | PE | State | 36.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2021 | RW | STBG | 16.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2021 | RW | State | 4.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2024 | CO | STBG | 20.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2024 | CO | State | 5.000 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2025 | CO | STBG | 6.513.558 | FY25 | |
1383721 | Indiana | Dearborn | INDOT | SR 46 | 0.44 mile west of US 52 over Whitewater River | Bridge Deck Replacement | bridge/culvert replacement | 2025 | CO | State | 1.628.389 | FY25 | |
1383726 | Indiana | Dearborn | INDOT | SR 62 | 3.7 miles west of SR 262 over Hayes Branch | Bridge replacement | maintenance/reconstruction | 2023 | CO | STBG | 1.475.383 | FY23 | |
1383726 | Indiana | Dearborn | INDOT | SR 62 | 3.7 miles west of SR 262 over Hayes Branch | Bridge replacement | maintenance/reconstruction | 2023 | CO | State | 368.846 | FY23 | |
1600539 | Indiana | Dearborn | INDOT | SR 46 | 3.2 miles east of SR 1 | Slide correction | maintenance/reconstruction | 2021 | RW | STBG | 53.600 | FY25 | |
1600539 | Indiana | Dearborn | INDOT | SR 46 | 3.2 miles east of SR 1 | Slide correction | maintenance/reconstruction | 2021 | RW | State | 13.400 | FY25 | |
1600539 | Indiana | Dearborn | INDOT | SR 46 | 3.2 miles east of SR 1 | Slide correction | maintenance/reconstruction | 2025 | CO | STBG | 2.486.999 | FY25 | |
1600539 | Indiana | Dearborn | INDOT | SR 46 | 3.2 miles east of SR 1 | Slide correction | maintenance/reconstruction | 2025 | CO | State | 621.750 | FY25 | |
1800349 | Indiana | Dearborn | INDOT | SR 1 | 0.35 mile N of US 50 @ Central RR Comp of Indiana | Bridge Deck Replacement | Grouped Project | 2024 | CO | STBG | 8.000 | FY25 | |
1800349 | Indiana | Dearborn | INDOT | SR 1 | 0.35 mile N of US 50 @ Central RR Comp of Indiana | Bridge Deck Replacement | Grouped Project | 2025 | CO | STBG | 1.694.664 | FY25 | |
1800349 | Indiana | Dearborn | INDOT | SR 1 | 0.35 mile N of US 50 @ Central RR Comp of Indiana | Bridge Deck Replacement | Grouped Project | 2024 | CO | State | 2.000 | FY25 | |
1800349 | Indiana | Dearborn | INDOT | SR 1 | 0.35 mile N of US 50 @ Central RR Comp of Indiana | Bridge Deck Replacement | Grouped Project | 2025 | CO | State | 423.666 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2024 | PE | STBG | 48.000 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2024 | PE | State | 12.000 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2024 | CO | STBG | 26.400 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2025 | CO | STBG | 1.711.889 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2024 | CO | State | 6.600 | FY25 | |
1900094 | Indiana | Dearborn | INDOT | SR 46 | 0.95 miles W of US52 @ Logan Creek | Bridge deck replacement | Grouped Project | 2025 | CO | State | 427.973 | FY25 | |
1901701 | Indiana | Dearborn | INDOT | US 50 | Various locations on US 50 | Guardrail Attenuators, New Or Modernize | maintenance/reconstruction | 2024 | CO | STBG | 960.000 | FY24 | |
1901701 | Indiana | Dearborn | INDOT | US 50 | Various locations on US 50 | Guardrail Attenuators, New Or Modernize | maintenance/reconstruction | 2024 | CO | State | 240.000 | FY24 | |
1901706 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Grouped Project | 2024 | CO | STBG | 380.000 | FY24 | |
1901706 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Grouped Project | 2024 | CO | State | 95.000 | FY24 | |
1901790 | Indiana | Dearborn | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Grouped Project | 2024 | CO | NHPP | 385.600 | 1Q24 | |
1901790 | Indiana | Dearborn | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Grouped Project | 2024 | CO | State | 96.400 | 1Q24 | |
1901791 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2024 | CO | NHS | 676.331 | FY24 | |
1901791 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2024 | CO | State | 75.148 | FY24 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2023 | PE | STBG | 163.760 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2023 | PE | State | 40.940 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2025 | RW | NHPP | 18.000 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2025 | RW | State | 2.000 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2026 | CO | NH | 40.000 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2027 | CO | NH | 2.413.442 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2026 | CO | State | 10.000 | FY27 | |
2000090 | Indiana | Dearborn | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | 2027 | CO | State | 603.361 | FY27 | |
2000313 | Indiana | Dearborn | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Grouped Project | 2024 | CO | NHPP | 377.152 | 2Q24 | |
2000313 | Indiana | Dearborn | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Grouped Project | 2024 | CO | State | 41.906 | 2Q24 | |
2000314 | Indiana | Dearborn | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Grouped Project | 2024 | CO | NHPP | 377.152 | 2Q24 | |
2000314 | Indiana | Dearborn | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Grouped Project | 2024 | CO | State | 41.906 | 2Q24 | |
2000464 | Indiana | Dearborn | INDOT | SR 1 | SR 46 to US 52 | HMA Overlay, Preventative Maintenance | Grouped Project | 2024 | CO | STBG | 3.631.586 | FY24 | |
2000464 | Indiana | Dearborn | INDOT | SR 1 | SR 46 to US 52 | HMA Overlay, Preventative Maintenance | Grouped Project | 2024 | CO | State | 907.897 | FY24 | |
2000470 | Indiana | Dearborn | INDOT | SR 350 | 1.76 miles W of US 50 (near school entrance) to US 50 | HMA Overlay, Preventative Maintenance | Grouped Project | 2025 | CO | NHPP | 2.497.711 | FY24 | |
2000470 | Indiana | Dearborn | INDOT | SR 350 | 1.76 miles W of US 50 (near school entrance) to US 50 | HMA Overlay, Preventative Maintenance | Grouped Project | 2025 | CO | State | 624.428 | FY24 | |
2000516 | Indiana | Dearborn | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Grouped Project | 2024 | CO | STBG | 2.199.200 | FY24 | |
2000516 | Indiana | Dearborn | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Grouped Project | 2024 | CO | State | 549.800 | FY24 | |
2001806 | Indiana | Dearborn | INDOT | SR 56 | From 2 miles S of US 50 to US 50 and one location on SR 101 from US 50 to SR 48 | Small Structures and Drains Construction | Grouped Project | 2024 | RW | STBG | 28.000 | FY25 | |
2001806 | Indiana | Dearborn | INDOT | SR 56 | From 2 miles S of US 50 to US 50 and one location on SR 101 from US 50 to SR 48 | Small Structures and Drains Construction | Grouped Project | 2024 | RW | State | 7.000 | FY25 | |
2001806 | Indiana | Dearborn | INDOT | SR 56 | From 2 miles S of US 50 to US 50 and one location on SR 101 from US 50 to SR 48 | Small Structures and Drains Construction | Grouped Project | 2025 | CO | STBG | 756.318 | FY25 | |
2001806 | Indiana | Dearborn | INDOT | SR 56 | From 2 miles S of US 50 to US 50 and one location on SR 101 from US 50 to SR 48 | Small Structures and Drains Construction | Grouped Project | 2025 | CO | State | 189.080 | FY25 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2022 | PE | STBG (Group IV) | 200.000 | FY26 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2022 | PE | Local | 50.000 | FY26 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2024 | RW | STBG (Group IV) | 40.000 | FY26 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2024 | RW | Local | 10.000 | FY26 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2026 | CO | STBG (Group IV) | 2.984.000 | FY26 | |
2001817 | Indiana | Dearborn | Dearborn County | Lower Dillsboro Road (IR 1026) | 2850' west of Gatch Hill Road to 1600' west of Gatch Hill Road | Slide correction | maintenance/reconstruction | 2026 | CO | Local | 2.192.000 | FY26 | |
2001906 | Indiana | Dearborn | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | 2022 | PE | STBG | 200.000 | FY25 | |
2001906 | Indiana | Dearborn | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | 2022 | PE | State | 50.000 | FY25 | |
2001906 | Indiana | Dearborn | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | 2025 | CO | STBG | 3.192.285 | FY25 | |
2001906 | Indiana | Dearborn | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | 2025 | CO | State | 798.071 | FY25 | |
2001908 | Indiana | Dearborn | INDOT | US 50 | 2.46 miles W of SR 350 (near Dutch Hollow Rd) to SR 350 | HMA Overlay, Minor Structural | Grouped Project | 2025 | CN | NHPP | 9.868.829 | FY25 | |
2001908 | Indiana | Dearborn | INDOT | US 50 | 2.46 miles W of SR 350 (near Dutch Hollow Rd) to SR 350 | HMA Overlay, Minor Structural | Grouped Project | 2025 | CN | State | 2.467.207 | FY25 | |
2001908 | Indiana | Dearborn | INDOT | US 50 | 2.46 miles W of SR 350 (near Dutch Hollow Rd) to SR 350 | HMA Overlay, Minor Structural | Grouped Project | 2025 | CE | NHPP | 513.952 | FY25 | |
2001908 | Indiana | Dearborn | INDOT | US 50 | 2.46 miles W of SR 350 (near Dutch Hollow Rd) to SR 350 | HMA Overlay, Minor Structural | Grouped Project | 2025 | CE | State | 128.488 | FY25 | |
2001911 | Indiana | Dearborn | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Grouped Project | 2028 | CO | STBG | 2.611.930 | FY25 | |
2001911 | Indiana | Dearborn | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Grouped Project | 2028 | CO | State | 652.983 | FY25 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2024 | RW | STBG | 8.000 | FY27 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2024 | RW | State | 2.000 | FY27 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2027 | CO | STBG | 429.722 | FY27 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2026 | CO | STBG | 24.000 | FY27 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2027 | CO | State | 107.430 | FY27 | |
2001948 | Indiana | Dearborn | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Grouped Project | 2026 | CO | State | 6.000 | FY27 | |
2002035 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 0.94 mile E of SR 1 | Arch Reconstruction or Repair | Grouped Project | 2024 | RW | STBG | 8.000 | FY25 | |
2002035 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 0.94 mile E of SR 1 | Arch Reconstruction or Repair | Grouped Project | 2024 | RW | State | 2.000 | FY25 | |
2002035 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 0.94 mile E of SR 1 | Arch Reconstruction or Repair | Grouped Project | 2025 | CO | STBG | 343.621 | FY25 | |
2002035 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 0.94 mile E of SR 1 | Arch Reconstruction or Repair | Grouped Project | 2025 | CO | State | 85.905 | FY25 | |
2002036 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Grouped Project | 2025 | CO | STBG | 310.508 | FY25 | |
2002036 | Indiana | Dearborn | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Grouped Project | 2025 | CO | State | 77.627 | FY25 | |
2021 RTP-1 | Kentucky | Campbell | City of Dayton | Sargeant Park Trail | Sargeant Park in the City of Dayton | Construction of new trails, trailside and trailhead facilities and maintenance of existing trails at Sargeant Park | bicycle/pedestrian/other | 2021 | CO | Rec Trail Funds | 91.043 | FY23 | |
2021 RTP-1 | Kentucky | Campbell | City of Dayton | Sargeant Park Trail | Sargeant Park in the City of Dayton | Construction of new trails, trailside and trailhead facilities and maintenance of existing trails at Sargeant Park | bicycle/pedestrian/other | 2021 | CO | Local | 2.276 | FY23 | |
2100015 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2025 | CO | STBG | 1.104.000 | FY25 | |
2100015 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2025 | CO | State | 276.000 | FY25 | |
2100157 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2026 | CN | STBG | 1.104.000 | FY26 | |
2100157 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2026 | CN | State | 276.000 | FY26 | |
2100189 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2026 | CO | STBG | 600.000 | FY26 | |
2100189 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2026 | CO | State | 150.000 | FY26 | |
2100556 | Indiana | Dearborn | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Grouped Project | 2025 | RW | STBG | 24.000 | FY26 | |
2100556 | Indiana | Dearborn | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Grouped Project | 2025 | RW | State | 6.000 | FY26 | |
2100556 | Indiana | Dearborn | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Grouped Project | 2026 | CO | STBG | 532.558 | FY26 | |
2100556 | Indiana | Dearborn | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Grouped Project | 2026 | CO | State | 133.139 | FY26 | |
2100585 | Indiana | Dearborn | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Grouped Project | 2024 | CO | NHPP | 12.000 | FY26 | |
2100585 | Indiana | Dearborn | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Grouped Project | 2026 | CO | NH | 1.253.600 | FY26 | |
2100585 | Indiana | Dearborn | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Grouped Project | 2024 | CO | State | 3.000 | FY26 | |
2100585 | Indiana | Dearborn | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Grouped Project | 2026 | CO | State | 313.400 | FY26 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2024 | PE | Local Bridge | 24.565 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2026 | PE | Local Bridge | 14.422 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2023 | PE | Local Bridge | 101.965 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2025 | PE | Local Bridge | 78.814 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2026 | PE | Local | 3.605 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2025 | PE | Local | 19.703 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2023 | PE | Local | 25.491 | FY27 | |
2101783 | Indiana | Dearborn | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | 2024 | PE | Local | 6.141 | FY27 | |
2101785 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Repair of Replace Lighting | Grouped Project | 2025 | CO | STBG | 2.080.000 | FY25 | |
2101785 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Repair of Replace Lighting | Grouped Project | 2025 | CO | State | 520.000 | FY25 | |
2200005 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Signing Installation / Repair | Grouped Project | 2027 | CO | Federal | 1.010.339 | FY27 | |
2200005 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Signing Installation / Repair | Grouped Project | 2027 | CO | State | 252.585 | FY27 | |
2200475 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Pavement Patching | Grouped Project | 2024 | CO | STBG | 800.000 | FY24 | |
2200475 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Pavement Patching | Grouped Project | 2024 | CO | State | 200.000 | FY24 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2024 | PE | NHPP | 405.000 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2024 | PE | State | 45.000 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2025 | RW | NHPP | 27.000 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2025 | RW | State | 3.000 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2025 | CO | NHPP | 18.000 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2027 | CO | NH | 1.616.667 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2027 | CO | State | 179.630 | FY27 | |
2200487 | Indiana | Dearborn | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Grouped Project | 2025 | CO | State | 2.000 | FY27 | |
2200671 | Indiana | Dearborn | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Grouped Project | 2024 | PE | NHS | 80.000 | FY27 | |
2200671 | Indiana | Dearborn | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Grouped Project | 2024 | PE | State | 20.000 | FY27 | |
2200671 | Indiana | Dearborn | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Grouped Project | 2027 | CO | NH | 384.368 | FY27 | |
2200671 | Indiana | Dearborn | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Grouped Project | 2027 | CO | State | 96.092 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2024 | PE | NHPP | 162.000 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2024 | PE | State | 18.000 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2027 | CN | NHPP | 1.410.936 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2026 | CN | NHPP | 9.000 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2027 | CN | State | 352.734 | FY27 | |
2200757 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Grouped Project | 2026 | CN | State | 1.000 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2024 | PE | NHPP | 162.000 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2024 | PE | State | 18.000 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2026 | CN | NHPP | 9.000 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2027 | CN | NHPP | 1.514.027 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2026 | CN | State | 1.000 | FY27 | |
2200758 | Indiana | Dearborn | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Grouped Project | 2027 | CN | State | 168.225 | FY27 | |
2200838 | Indiana | Dearborn | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Grouped Project | 2024 | PE | NHPP | 416.000 | FY27 | |
2200838 | Indiana | Dearborn | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Grouped Project | 2024 | PE | State | 104.000 | FY27 | |
2200838 | Indiana | Dearborn | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Grouped Project | 2027 | CO | NH | 9.731.540 | FY27 | |
2200838 | Indiana | Dearborn | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Grouped Project | 2027 | CO | State | 2.432.885 | FY27 | |
2200839 | Indiana | Dearborn | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Grouped Project | 2024 | PE | NHPP | 324.000 | FY27 | |
2200839 | Indiana | Dearborn | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Grouped Project | 2024 | PE | State | 36.000 | FY27 | |
2200839 | Indiana | Dearborn | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Grouped Project | 2027 | CO | NH | 4.068.000 | FY27 | |
2200839 | Indiana | Dearborn | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Grouped Project | 2027 | CO | State | 452.000 | FY27 | |
2200877 | Indiana | Dearborn | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Grouped Project | 2026 | CO | STBG | 347.909 | FY26 | |
2200877 | Indiana | Dearborn | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Grouped Project | 2026 | CO | State | 86.977 | FY26 | |
2200935 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2027 | CN | STBG | 600.000 | FY27 | |
2200935 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2027 | CN | State | 150.000 | FY27 | |
2200936 | Indiana | Dearborn | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2024 | PE | STBG | 60.000 | FY27 | |
2200936 | Indiana | Dearborn | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2024 | PE | State | 15.000 | FY27 | |
2200936 | Indiana | Dearborn | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2027 | CO | STBG | 168.000 | FY27 | |
2200936 | Indiana | Dearborn | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2027 | CO | State | 42.000 | FY27 | |
2200937 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2027 | CN | STBG | 2.045.240 | FY27 | |
2200937 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2027 | CN | State | 511.310 | FY27 | |
2200939 | Indiana | Dearborn | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Grouped Project | 2024 | PE | HSIP | 315.000 | FY27 | |
2200939 | Indiana | Dearborn | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Grouped Project | 2024 | PE | State | 35.000 | FY27 | |
2200939 | Indiana | Dearborn | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Grouped Project | 2027 | CN | STBG | 600.000 | FY27 | |
2200939 | Indiana | Dearborn | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Grouped Project | 2027 | CN | State | 150.000 | FY27 | |
2200940 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2024 | PE | STBG | 400.000 | FY27 | |
2200940 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2024 | PE | State | 100.000 | FY27 | |
2200940 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2027 | CN | STBG | 2.592.000 | FY27 | |
2200940 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Grouped Project | 2027 | CN | State | 648.000 | FY27 | |
2201149 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2027 | CN | STBG | 760.000 | FY27 | |
2201149 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2027 | CN | State | 190.000 | FY27 | |
2201216 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2025 | CO | STBG | 702.594 | FY25 | |
2201216 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Grouped Project | 2025 | CO | State | 175.649 | FY25 | |
2201627 | Indiana | Dearborn | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | 2027 | RW | Federal | 20.000 | FY29 | |
2201627 | Indiana | Dearborn | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | 2027 | RW | Local | 5.000 | FY29 | |
2201627 | Indiana | Dearborn | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | 2029 | CO | Federal | 1.932.000 | FY29 | |
2201627 | Indiana | Dearborn | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | 2029 | CO | Local | 483.000 | FY29 | |
2300013 | Indiana | Dearborn | INDOT | Various | IDIQ, various locations throughout the Seymour District | District Wide Bridge Maintenance | Grouped Project | 2024 | CO | STBG | 800.000 | FY24 | |
2300013 | Indiana | Dearborn | INDOT | Various | IDIQ, various locations throughout the Seymour District | District Wide Bridge Maintenance | Grouped Project | 2024 | CO | State | 200.000 | FY24 | |
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2025 | CO | STBG | 16.972.550 | ||
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2026 | CO | STBG | 16.972.536 | ||
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2024 | CO | STBG | 16.972.585 | ||
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2026 | CO | State | 4.243.146 | ||
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2025 | CO | State | 4.243.137 | ||
2300274 | Indiana | Dearborn | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Grouped Project | 2024 | CO | State | 4.243.134 | ||
2300671 | Indiana | Dearborn | INDOT | Statewide Protect Program Development | Various | Protect Program Development for Infrastructure Investment & Jobs Act | Grouped Project | 2024 | PE | STBG | 400.000 | FY24 | |
2300671 | Indiana | Dearborn | INDOT | Statewide Protect Program Development | Various | Protect Program Development for Infrastructure Investment & Jobs Act | Grouped Project | 2024 | PE | State | 100.000 | FY24 | |
2300791 | Indiana | Dearborn | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Grouped Project | 2025 | PE | STBG | 120.000 | FY28 | |
2300791 | Indiana | Dearborn | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Grouped Project | 2025 | PE | State | 30.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2025 | PE | STBG | 200.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2025 | PE | State | 50.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2026 | RW | STBG | 48.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2026 | RW | State | 12.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2028 | CO | STBG | 772.800 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2027 | CO | STBG | 48.000 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2028 | CO | State | 193.200 | FY28 | |
2300990 | Indiana | Dearborn | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Grouped Project | 2027 | CO | State | 12.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2024 | PE | STBG | 200.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2024 | PE | State | 50.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2025 | RW | STBG | 24.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2025 | RW | State | 6.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2027 | CO | STBG | 32.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2028 | CO | STBG | 429.647 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2027 | CO | State | 8.000 | FY28 | |
2300991 | Indiana | Dearborn | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Grouped Project | 2028 | CO | State | 107.412 | FY28 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2025 | PE | NHPP | 240.000 | FY25 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2025 | PE | State | 60.000 | FY25 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2026 | RW | NH | 16.000 | FY25 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2026 | RW | State | 4.000 | FY25 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2027 | CO | NH | 353.859 | FY25 | |
2301163 | Indiana | Dearborn | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Grouped Project | 2027 | CO | State | 88.465 | FY25 | |
2301236 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2028 | CO | HSIP | 2.805.240 | FY28 | |
2301236 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Grouped Project | 2028 | CO | State | 701.310 | FY28 | |
2301237 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings | Grouped Project | 2028 | CO | STBG | 600.000 | FY28 | |
2301237 | Indiana | Dearborn | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings | Grouped Project | 2028 | CO | State | 150.000 | FY28 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2025 | PE | Local Bridge | 380.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2025 | PE | Local | 115.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2028 | RW | Local Bridge | 28.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2028 | RW | Local | 7.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | UT | Local Bridge | 60.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | UT | Local | 15.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | CO | Local Bridge | 1.280.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | CO | Local | 320.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | CE | Local Bridge | 192.000 | FY30 | |
2301597 | Indiana | Dearborn | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | 2030 | CE | Local | 48.000 | FY30 | |
2301653 | Indiana | Dearborn | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Grouped Project | 2025 | CO | STBG | 2.000.000 | FY25 | |
2301653 | Indiana | Dearborn | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Grouped Project | 2027 | CO | STBG | 1.680.000 | FY25 | |
2301653 | Indiana | Dearborn | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Grouped Project | 2025 | CO | State | 500.000 | FY25 | |
2301653 | Indiana | Dearborn | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Grouped Project | 2027 | CO | State | 420.000 | FY25 | |
2400032 | Indiana | Dearborn | INDOT | Signing Installation/Repari | Scenic Byway Corridor in 13 Counties along Ohio River | Signing Installation and Repair | Grouped Project | 2025 | CN | NHS | 720.000 | FY25 | |
2400032 | Indiana | Dearborn | INDOT | Signing Installation/Repari | Scenic Byway Corridor in 13 Counties along Ohio River | Signing Installation and Repair | Grouped Project | 2025 | CN | State | 80.000 | FY25 | |
2400591 | Indiana | Dearborn | INDOT | Various | Soil nail repair on MSE failures - South Districts | Other Type Project (Miscellaneous) | Grouped Project | 2026 | CN | STP | 1.600.000 | FY26 | |
2400591 | Indiana | Dearborn | INDOT | Various | Soil nail repair on MSE failures - South Districts | Other Type Project (Miscellaneous) | Grouped Project | 2026 | CN | State | 400.000 | FY26 | |
2400745 | Indiana | Dearborn | INDOT | I-74 | I-74 from SR-101 to SR-1 I-74 from SR-101 to SR-1 I-74 from SR-101 to SR-1 | Pavement Patching | Grouped Project | 2026 | CO | NH | 6.300.000 | FY27 | |
2400745 | Indiana | Dearborn | INDOT | I-74 | I-74 from SR-101 to SR-1 I-74 from SR-101 to SR-1 I-74 from SR-101 to SR-1 | Pavement Patching | Grouped Project | 2026 | CO | State | 700.000 | FY27 | |
2400746 | Indiana | Dearborn | INDOT | I-74 | I-74 from SR-1 to US-52 | Pavement Patching | Grouped Project | 2027 | CO | NH | 2.400.000 | FY27 | |
2400746 | Indiana | Dearborn | INDOT | I-74 | I-74 from SR-1 to US-52 | Pavement Patching | Grouped Project | 2027 | CO | State | 600.000 | FY27 | |
2401476 | Indiana | Dearborn | INDOT | SR 101 | 0.87 miles N or SR 350 and 0.71 miles S of SR 350 | Small Structure Replacement | Grouped Project | 2026 | PE | STBG | 320.000 | FY26 | |
2401476 | Indiana | Dearborn | INDOT | SR 101 | 0.87 miles N or SR 350 and 0.71 miles S of SR 350 | Small Structure Replacement | Grouped Project | 2026 | PE | State | 80.000 | FY26 | |
2401477 | Indiana | Dearborn | INDOT | SR 129 | 5.84 mile S of US 421 and 5.61 miles S of US 421 | Small Structure Replacement | Grouped Project | 2026 | PE | STBG | 240.000 | FY26 | |
2401477 | Indiana | Dearborn | INDOT | SR 129 | 5.84 mile S of US 421 and 5.61 miles S of US 421 | Small Structure Replacement | Grouped Project | 2026 | PE | State | 60.000 | FY26 | |
2401480 | Indiana | Dearborn | INDOT | SR 48 | 4.05 miles E of SR 101 | Small Structure Replacement | Grouped Project | 2026 | PE | STBG | 160.000 | FY26 | |
2401480 | Indiana | Dearborn | INDOT | SR 48 | 4.05 miles E of SR 101 | Small Structure Replacement | Grouped Project | 2026 | PE | State | 40.000 | FY26 | |
2401483 | Indiana | Dearborn | INDOT | SR 229 | 4.68 Miles S of US 52 | Small Structure Replacement | Grouped Project | 2026 | PE | STBG | 160.000 | FY26 | |
2401483 | Indiana | Dearborn | INDOT | SR 229 | 4.68 Miles S of US 52 | Small Structure Replacement | Grouped Project | 2026 | PE | State | 40.000 | FY26 | |
2401484 | Indiana | Dearborn | INDOT | SR 156 | 4.45 miles S of SR 250 | Small Structure Replacement | Grouped Project | 2026 | PE | STBG | 240.000 | FY26 | |
2401484 | Indiana | Dearborn | INDOT | SR 156 | 4.45 miles S of SR 250 | Small Structure Replacement | Grouped Project | 2026 | PE | State | 60.000 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2018 | PE | State | 101.000 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2021 | PE-ENV | State | 15.966 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2022 | PE-ENV | State | 9.468 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2024 | RW | State | 138.773 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2026 | CO | Preservation | 2.665.016 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2026 | CO | Labor | 233.189 | FY26 | |
25349 | Ohio | Hamilton | ODOT | HAM SR 264 10.42 (Glenway Ave) | From 4.15 to 4.22 miles north of US 50. | Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment | bridge/culvert replacement | 2026 | CO | State | 666.254 | FY26 | |
6-10028.10 | Kentucky | Boone | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Remediate the rejectable indications found during the inspection and testing of the T1 steel on the bridge (shared cost with INDOT at 50%) | Grouped Project | 2024 | CO | FBP | 5.760.000 | FY24 | |
6-10028.10 | Kentucky | Boone | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Remediate the rejectable indications found during the inspection and testing of the T1 steel on the bridge (shared cost with INDOT at 50%) | Grouped Project | 2024 | CO | State | 1.440.000 | FY24 | |
6-10044 | Kentucky | Kenton | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Grouped Project | 2025 | D | Federal Bridge | 1.280.000 | FY25 | |
6-10044 | Kentucky | Kenton | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Grouped Project | 2025 | D | State | 320.000 | FY25 | |
6-10044 | Kentucky | Kenton | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Grouped Project | 2025 | CO | Federal Bridge | 8.480.000 | FY25 | |
6-10044 | Kentucky | Kenton | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Grouped Project | 2025 | CO | State | 2.120.000 | FY25 | |
6-10051 | Kentucky | Campbell | KYTC | IR 275 | I-275 over Ohio River from BMP 73.061 to EMP 73.333 | Address deficiencies of bridge (includes item # 6-10053) | Grouped Project | 2025 | CO | Federal Bridge | 3.080.000 | FY25 | |
6-10051 | Kentucky | Campbell | KYTC | IR 275 | I-275 over Ohio River from BMP 73.061 to EMP 73.333 | Address deficiencies of bridge (includes item # 6-10053) | Grouped Project | 2025 | CO | State | 770.000 | FY25 | |
6-10060 | Kentucky | Campbell | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Grouped Project | 2024 | D | Federal Bridge Program | 40.000 | ||
6-10060 | Kentucky | Campbell | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Grouped Project | 2024 | D | State | 10.000 | ||
6-10060 | Kentucky | Campbell | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Grouped Project | 2024 | CO | Federal Bridge Program | 400.000 | ||
6-10060 | Kentucky | Campbell | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Grouped Project | 2024 | CO | State | 100.000 | ||
6-1070 | Kentucky | Kenton | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR | bridge/culvert replacement | 2023 | CO | SPP | 2.250.000 | FY23 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2021 | D | NHPP | 3.271.200 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2021 | D | State | 878.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2025 | RW | BRO | 2.152.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2025 | RW | State | 538.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2025 | UT | BRO | 1.016.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2025 | UT | BRO | 254.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2026 | CO | BRO | 24.000.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2027 | CO | BRO | 24.000.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2028 | CO | BRO | 28.000.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2028 | CO | State | 7.000.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2026 | CO | State | 6.000.000 | FY26 | |
6-1086 | Kentucky | Kenton | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB | bridge/culvert replacement | 2027 | CO | State | 6.000.000 | FY26 | |
6-1087 | Kentucky | Boone | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | 2027 | D | FBP | 372.000 | FY27 | |
6-1087 | Kentucky | Boone | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | 2027 | D | State | 93.000 | FY27 | |
6-1087 | Kentucky | Boone | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | 2027 | CO | BRX | 3.788.000 | FY27 | |
6-1087 | Kentucky | Boone | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | 2027 | CO | State | 947.000 | FY27 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2021 | D | OKI-SNK | 158.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2021 | D | Local | 30.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2023 | D | Local | 12.500 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2021 | D-SF | OKI-SNK | 12.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2021 | D-SF | State | 3.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2023 | RW | OKI-SNK | 79.200 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2023 | RW | Local | 20.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2025 | CO | OKI-SNK | 910.000 | FY25 | |
6-114 | Kentucky | Boone | Boone County | KY 20 | at Aviation Blvd. | Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection. | traffic operations/safety | 2025 | CO | Local | 227.500 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2021 | D | OKI-SNK | 86.400 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2021 | D | Local | 21.600 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2021 | D-SF | OKI-SNK | 12.000 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2021 | D-SF | State | 2.400 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | RW | OKI-SNK | 16.000 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | RW | Local | 2.560 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | UT | OKI-SNK | 320.000 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | UT | Local | 80.000 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | CO | OKI-SNK | 360.000 | FY25 | |
6-115 | Kentucky | Campbell | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, add bike lane and replace sidewalks | maintenance/reconstruction | 2025 | CO | Local | 90.000 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2024 | D | OKI-SNK | 98.198 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2024 | D | Local | 24.550 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2024 | D-SF | OKI-SNK | 26.500 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2024 | D-SF | State | 8.500 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2025 | RW | OKI-SNK | 150.400 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2025 | RW | Local | 37.600 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2025 | UT | Local | 1.000 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2025 | CO | OKI-SNK | 648.513 | FY25 | |
6-123 | Kentucky | Kenton | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | 2025 | CO | Local | 162.128 | FY25 | |
6-124 | Kentucky | Campbell | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2023 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-124 | Kentucky | Campbell | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2023 | D-SF | State | 2.500 | FY25 | |
6-124 | Kentucky | Campbell | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 2.418.428 | FY25 | |
6-124 | Kentucky | Campbell | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2025 | CO | Local | 604.607 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2022 | D | OKI-SNK | 128.000 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2022 | D | Local | 32.000 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2022 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2022 | D-SF | State | 2.500 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 622.000 | FY25 | |
6-127 | Kentucky | Campbell | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | 2025 | CO | Local | 155.500 | FY25 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2024 | RW | STBG | 4.000.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2025 | RW | STBG | 7.184.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2024 | RW | State | 1.000.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2025 | RW | State | 1.796.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2025 | UT | STBG | 1.400.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2025 | UT | State | 350.000 | FY26 | |
6-162.40 | Kentucky | Kenton | KYTC | KY 536 | Williamswood Rd/Calvary Drive to KY 17 | Improve safety and reduce congestion, widen to 2 lanes each direction on new alignment | widening/relocation | 2026 | CO | Uncommitted | 34.000.000 | FY26 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2022 | D | NH | 4.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2022 | D | State | 1.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2022 | RW | NH | 4.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2023 | RW | NH | 12.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2022 | RW | State | 1.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2023 | RW | State | 3.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2030 | CO | NH | 114.072.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2028 | CO | NH | 4.000.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2029 | CO | NH | 51.464.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2029 | CO | State | 12.866.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2030 | CO | State | 28.518.000 | FY30 | |
6-17.00 | Kentucky | Kenton | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | 2028 | CO | State | 1.000.000 | FY30 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | D | OKI-SNK | 92.000 | FY25 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | D | Local | 23.000 | FY25 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | D-SF | State | 2.500 | FY25 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 590.000 | FY25 | |
6-177 | Kentucky | Campbell | NKU | 3 Mile Road | Between existing roundabouts at Nunn Drive and Norse Blvd | Construct new sidewalk with curb, gutter and storm inlets | bicycle/pedestrian/other | 2025 | CO | Local | 147.500 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2021 | D | OKI-SNK | 100.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2021 | D | Local | 25.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2021 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2021 | D-SF | State | 2.500 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | RW | OKI-SNK | 40.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | RW | Local | 10.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | UT | OKI-SNK | 40.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | UT | Local | 10.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | CO | OKI-SNK | 482.000 | FY25 | |
6-178 | Kentucky | Kenton | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | 2025 | CO | Local | 120.500 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2022 | D | OKI-SNK | 12.000 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2022 | D | Local | 3.000 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2022 | D-SF | OKI-SNK | 5.000 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2022 | D-SF | State | 1.250 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2025 | CO | OKI-SNK | 223.000 | FY25 | |
6-179 | Kentucky | Kenton | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | 2025 | CO | Local | 55.750 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2022 | D-SF | OKI-SNK | 30.000 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2022 | D-SF | State | 7.500 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2022 | D | OKI-SNK | 280.000 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2022 | D | Local | 280.000 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2025 | RW | OKI-SNK | 100.000 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2025 | RW | Local | 100.000 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 2.028.487 | FY25 | |
6-185 | Kentucky | Boone | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | 2025 | CO | Local | 2.028.487 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2025 | D | NHPM | 3.217.857 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2025 | D | State | 804.464 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2027 | CO | STBG | 16.000.000 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2025 | CO | STBG | 12.960.711 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2025 | CO | State | 3.240.178 | FY25 | |
6-20001 | Kentucky | Boone | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Grouped Project | 2027 | CO | State | 4.000.000 | FY25 | |
6-20007 | Kentucky | Boone | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Grouped Project | 2030 | D | NHPP | 652.000 | FY30 | |
6-20007 | Kentucky | Boone | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Grouped Project | 2030 | D | State | 163.000 | FY30 | |
6-20007 | Kentucky | Boone | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Grouped Project | 2030 | C | NHPP | 6.520.000 | FY30 | |
6-20007 | Kentucky | Boone | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Grouped Project | 2030 | C | State | 1.630.000 | FY30 | |
6-20012 | Kentucky | Campbell | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Grouped Project | 2026 | D | STBG | 120.000 | FY27 | |
6-20012 | Kentucky | Campbell | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Grouped Project | 2026 | D | State | 30.000 | FY27 | |
6-20012 | Kentucky | Campbell | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Grouped Project | 2027 | CO | STBG | 1.080.000 | FY27 | |
6-20012 | Kentucky | Campbell | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Grouped Project | 2027 | CO | State | 270.000 | FY27 | |
6-20013 | Kentucky | Campbell | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Grouped Project | 2024 | D | STBG | 180.000 | FY25 | |
6-20013 | Kentucky | Campbell | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Grouped Project | 2024 | D | State | 45.000 | FY25 | |
6-20013 | Kentucky | Campbell | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Grouped Project | 2025 | CO | STBG | 2.250.000 | FY25 | |
6-20013 | Kentucky | Campbell | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Grouped Project | 2025 | CO | State | 562.500 | FY25 | |
6-20014 | Kentucky | Campbell | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Grouped Project | 2026 | D | STBG | 110.000 | FY25 | |
6-20014 | Kentucky | Campbell | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Grouped Project | 2026 | D | State | 27.500 | FY25 | |
6-20014 | Kentucky | Campbell | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Grouped Project | 2026 | CO | STBG | 2.090.000 | FY25 | |
6-20014 | Kentucky | Campbell | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Grouped Project | 2026 | CO | State | 522.500 | FY25 | |
6-20017 | Kentucky | Campbell | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Grouped Project | 2030 | D | STP5 | 32.000 | FY26 | |
6-20017 | Kentucky | Campbell | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Grouped Project | 2030 | D | State | 8.000 | FY26 | |
6-20017 | Kentucky | Campbell | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Grouped Project | 2030 | CO | STP5 | 608.000 | FY26 | |
6-20017 | Kentucky | Campbell | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Grouped Project | 2030 | CO | State | 152.000 | FY26 | |
6-20040 | Kentucky | Kenton | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Grouped Project | 2024 | D | NHPP | 320.000 | FY25 | |
6-20040 | Kentucky | Kenton | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Grouped Project | 2024 | D | State | 80.000 | FY25 | |
6-20040 | Kentucky | Kenton | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Grouped Project | 2025 | CO | PM | 2.000.000 | FY25 | |
6-20040 | Kentucky | Kenton | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Grouped Project | 2026 | CO | PM | 2.000.000 | FY25 | |
6-20044 | Kentucky | Kenton | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Grouped Project | 2027 | D | STP5 | 14.000 | FY27 | |
6-20044 | Kentucky | Kenton | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Grouped Project | 2027 | D | State | 3.500 | FY27 | |
6-20044 | Kentucky | Kenton | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Grouped Project | 2027 | CO | STP5 | 266.000 | FY27 | |
6-20044 | Kentucky | Kenton | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Grouped Project | 2027 | CO | State | 66.500 | FY27 | |
6-20045 | Kentucky | Kenton | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Grouped Project | 2030 | D | STP5 | 9.000 | FY30 | |
6-20045 | Kentucky | Kenton | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Grouped Project | 2030 | D | State | 2.250 | FY30 | |
6-20045 | Kentucky | Kenton | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Grouped Project | 2030 | CO | STP5 | 160.000 | FY30 | |
6-20045 | Kentucky | Kenton | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Grouped Project | 2030 | CO | State | 40.000 | FY30 | |
6-20046 | Kentucky | Kenton | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Grouped Project | 2024 | D | STBG | 100.000 | FY24 | |
6-20046 | Kentucky | Kenton | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Grouped Project | 2024 | D | State | 25.000 | FY24 | |
6-20046 | Kentucky | Kenton | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Grouped Project | 2024 | CO | STBG | 1.000.000 | FY24 | |
6-20046 | Kentucky | Kenton | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Grouped Project | 2024 | CO | State | 250.000 | FY24 | |
6-20047 | Kentucky | Boone | KYTC | US 42 | MP 10.25 to MP 11.53 | Address condition | Grouped Project | 2025 | CO | STBG | 504.000 | ||
6-20047 | Kentucky | Boone | KYTC | US 42 | MP 10.25 to MP 11.53 | Address condition | Grouped Project | 2025 | CO | State | 126.000 | ||
6-20049 | Kentucky | Campbell | KYTC | KY 8 | KY 8 from MP 15.97 to MP 19.36 | Address pavement condition of KY 8 | Grouped Project | 2026 | D | STP5 | 221.480 | FY26 | |
6-20049 | Kentucky | Campbell | KYTC | KY 8 | KY 8 from MP 15.97 to MP 19.36 | Address pavement condition of KY 8 | Grouped Project | 2026 | D | State | 55.370 | FY26 | |
6-20049 | Kentucky | Campbell | KYTC | KY 8 | KY 8 from MP 15.97 to MP 19.36 | Address pavement condition of KY 8 | Grouped Project | 2026 | CO | STP5 | 4.208.120 | FY26 | |
6-20049 | Kentucky | Campbell | KYTC | KY 8 | KY 8 from MP 15.97 to MP 19.36 | Address pavement condition of KY 8 | Grouped Project | 2026 | CO | State | 1.052.030 | FY26 | |
6-22128 | Kentucky | Boone | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Grouped Project | 2030 | D | NHPP | 80.000 | ||
6-22128 | Kentucky | Boone | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Grouped Project | 2030 | D | State | 20.000 | ||
6-22128 | Kentucky | Boone | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Grouped Project | 2030 | CO | NHPP | 800.000 | ||
6-22128 | Kentucky | Boone | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Grouped Project | 2030 | CO | State | 200.000 | ||
6-23 | Kentucky | Campbell | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | 2025 | PL | NH | 400.000 | FY29 | |
6-23 | Kentucky | Campbell | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | 2025 | PL | State | 100.000 | FY29 | |
6-23 | Kentucky | Campbell | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | 2027 | D | NH | 1.600.000 | FY29 | |
6-23 | Kentucky | Campbell | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | 2027 | D | State | 400.000 | FY29 | |
6-23 | Kentucky | Campbell | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | 2029 | CO | Uncommitted | 22.200.000 | FY29 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2024 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2024 | D-SF | State | 2.500 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2024 | D | OKI-SNK | 94.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2024 | D | Local | 23.500 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | RW | OKI-SNK | 100.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | RW | Local | 25.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | UT | OKI-SNK | 80.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | UT | Local | 20.000 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 332.541 | FY25 | |
6-297 | Kentucky | Campbell | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | 2025 | CO | Local | 83.135 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2022 | D | OKI-TA | 10.000 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2022 | D | Local | 2.500 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2022 | D-SF | OKI-TA | 5.000 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2022 | D-SF | State | 1.000 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 757.000 | FY25 | |
6-3017 | Kentucky | Campbell | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | 2025 | CO | Local | 189.250 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2023 | D | OKI-TA | 60.000 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2023 | D | Local | 15.000 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 10.000 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | State | 2.500 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 50.000 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2025 | RW | Local | 12.500 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 300.000 | FY25 | |
6-3027 | Kentucky | Boone | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | 2025 | CO | Local | 75.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2023 | D | OKI-TA | 24.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2023 | D | Local | 6.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2023 | D-SF | OKI-TA | 5.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2023 | D-SF | State | 1.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 16.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | RW | Local | 4.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 16.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | UT | Local | 4.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 127.000 | FY25 | |
6-3028 | Kentucky | Kenton | City of Elsmere | Garvey Avenue Howell Elementary Sidewalk | Along Garvey Avenue from Shaw Av to Florence Ct | Replacement of sidewalk | bicycle/pedestrian/other | 2025 | CO | Local | 31.750 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2022 | D | OKI-TA | 54.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2022 | D | Local | 13.500 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2022 | D-SF | OKI-TA | 6.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2022 | D-SF | State | 1.500 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 8.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | RW | Local | 2.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 8.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | UT | Local | 2.000 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 212.493 | FY25 | |
6-3030.00 | Kentucky | Campbell | City of Bellevue | Lincoln Road Sidewalk | Along Lincoln Road | New sidewalk between Van Voast Av and Ward Av, replace bad segmens of sidewalk in other locations near Grandview Elementary | bicycle/pedestrian/other | 2025 | CO | Local | 53.123 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2022 | D | OKI-TA | 80.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2022 | D | Local | 20.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2022 | D-SF | OKI-TA | 8.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2022 | D-SF | State | 2.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2024 | RW | OKI-TAP | 52.448 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2024 | RW | Local | 13.112 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 20.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2025 | UT | Local | 5.000 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 196.482 | FY25 | |
6-3031.00 | Kentucky | Kenton | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | 2025 | CO | Local | 49.120 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2024 | D | OKI-TAP | 72.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2024 | D | Local | 18.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 8.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2024 | D-SF | State | 2.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 48.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2025 | UT | Local | 12.000 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 307.994 | FY25 | |
6-3033 | Kentucky | Campbell | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | 2025 | CO | Local | 76.999 | FY25 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2023 | D | OKI-TAP | 40.000 | FY26 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2023 | D | Local | 40.000 | FY26 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2023 | D-SF | OKI-TAP | 10.000 | FY26 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2023 | D-SF | State | 2.500 | FY26 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2026 | CO | OKI-TAP | 514.831 | FY26 | |
6-3034 | Kentucky | Boone | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | 2026 | CO | Local | 514.831 | FY26 | |
6-3035 | Kentucky | Kenton | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 5.000 | FY25 | |
6-3035 | Kentucky | Kenton | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | State | 1.250 | FY25 | |
6-3035 | Kentucky | Kenton | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 139.072 | FY25 | |
6-3035 | Kentucky | Kenton | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | 2025 | CO | Local | 34.768 | FY25 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2024 | D | OKI-TAP | 63.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2024 | D | Local | 15.750 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 9.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2024 | D-SF | State | 2.250 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 20.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2025 | RW | Local | 5.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 16.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2025 | UT | Local | 4.000 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2026 | CO | OKI-TAP | 168.992 | FY26 | |
6-3036 | Kentucky | Kenton | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | 2026 | CO | Local | 42.248 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2024 | D | OKI-TAP | 27.795 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2024 | D | Local | 3.750 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 2.210 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2024 | D-SF | State | 1.250 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 52.800 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2025 | RW | Local | 13.200 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2026 | CO | OKI-TAP | 237.842 | FY26 | |
6-3037 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalks Phase 4 | from Morschel Rd. to east corp. limit | Install new sidewalk and upgraded sidewalk | bicycle/pedestrian/other | 2026 | CO | Local | 59.461 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2023 | D | CMAQ | 80.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2023 | D | Local | 20.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2023 | D-SF | CMAQ | 10.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2023 | D-SF | State | 2.500 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2025 | RW | CMAQ | 100.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2025 | RW | Local | 25.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2026 | CO | CMAQ | 480.000 | FY26 | |
6-3038 | Kentucky | Boone | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | 2026 | CO | Local | 120.000 | FY26 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D | OKI-TAP | 48.160 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D | Local | 12.040 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | OKI-TAP | 10.000 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2024 | D-SF | State | 11.841 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2026 | UT | OKI-TAP | 52.000 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2026 | UT | Local | 13.000 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2027 | CO | OKI-TAP | 373.470 | FY27 | |
6-3040 | Kentucky | Campbell | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | 2027 | CO | Local | 93.368 | FY27 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2025 | D | OKI-TAP | 60.000 | FY28 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2025 | D | Local | 20.000 | FY28 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2025 | D-SF | OKI-TAP | 42.000 | FY28 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2025 | D-SF | State | 10.500 | FY28 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2028 | CO | OKI-TAP | 360.000 | FY28 | |
6-3041 | Kentucky | Boone | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | 2028 | CO | Local | 120.000 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2025 | D | OKI-TAP | 83.383 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2025 | D | Local | 55.589 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2025 | D-SF | OKI-TAP | 61.812 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2025 | D-SF | State | 15.453 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2026 | RW | OKI-TAP | 34.438 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2026 | RW | Local | 22.959 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2028 | CO | OKI-TAP | 500.299 | FY28 | |
6-3042 | Kentucky | Kenton | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | 2028 | CO | Local | 333.533 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2025 | D | OKI-TAP | 84.000 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2025 | D | Local | 21.000 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2025 | D-SF | OKI-TAP | 65.000 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2025 | D-SF | State | 16.250 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2028 | CO | OKI-TAP | 566.000 | FY28 | |
6-3043 | Kentucky | Kenton | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | 2028 | CO | Local | 141.500 | FY28 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2022 | D-SF | OKI-SNK | 12.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2022 | D-SF | State | 3.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2022 | D | OKI-SNK | 84.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2022 | D | Local | 21.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | RW | OKI-SNK | 116.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | RW | Local | 29.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | UT | OKI-SNK | 80.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | UT | Local | 20.000 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | CO | OKI-SNK | 807.112 | FY25 | |
6-321 | Kentucky | Kenton | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | 2025 | CO | Local | 201.778 | FY25 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2018 | D | TAP | 85.000 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2018 | D-SF | TAP | 8.500 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2022 | RW | TAP | 431.200 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2022 | RW | Local | 107.800 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2022 | UT | TAP | 16.000 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2022 | UT | Local | 4.000 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2023 | CO | TAP | 464.239 | FY23 | |
6-3213 | Kentucky | Kenton | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | 2023 | CO | Local | 116.060 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | D | TAP | 40.000 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | D-SF | TAP | 5.500 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | RW | TAP | 146.000 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | RW | Local | 36.500 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | CO | TAP | 146.759 | FY23 | |
6-3214 | Kentucky | Campbell | City of Silver Grove | KY 8 Sidewalk Phase 2 | South side of KY 8 from KY 8 to KY 547 | Upgrade 1400' of sidewalk | bicycle/pedestrian/other | 2021 | CO | Local | 36.690 | FY23 | |
6-3220 | Kentucky | Boone | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | 2025 | D-SF | OKI-TAP | 8.000 | FY25 | |
6-3220 | Kentucky | Boone | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | 2025 | D-SF | State | 2.000 | FY25 | |
6-3220 | Kentucky | Boone | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 425.711 | FY25 | |
6-3220 | Kentucky | Boone | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | 2025 | CO | Local | 106.428 | FY25 | |
6-3221 | Kentucky | Campbell | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | 2023 | D-SF | TAP | 5.000 | FY24 | |
6-3221 | Kentucky | Campbell | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | 2023 | UT | TAP | 82.828 | FY24 | |
6-3221 | Kentucky | Campbell | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | 2023 | UT | Local | 18.825 | FY24 | |
6-3221 | Kentucky | Campbell | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | 2023 | CO | TAP | 66.721 | FY24 | |
6-3221 | Kentucky | Campbell | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | 2023 | CO | Local | 15.164 | FY24 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2020 | D | TAP | 100.000 | FY23 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2020 | D-SF | TAP | 10.000 | FY23 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2021 | RW | TAP | 4.000 | FY23 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2021 | RW | Local | 1.000 | FY23 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2021 | CO | TAP | 124.576 | FY23 | |
6-3228 | Kentucky | Campbell | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | 2021 | CO | Local | 31.144 | FY23 | |
6-3229 | Kentucky | Boone | Boone County | Burlington KY 18 Sidewalks | North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | 2021 | D | OKI-TA | 59.800 | FY25 | |
6-3229 | Kentucky | Boone | Boone County | Burlington KY 18 Sidewalks | North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | 2021 | D-SF | OKI-TA | 6.250 | FY25 | |
6-3229 | Kentucky | Boone | Boone County | Burlington KY 18 Sidewalks | North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | 2021 | D | Local | 14.950 | FY25 | |
6-3229 | Kentucky | Boone | Boone County | Burlington KY 18 Sidewalks | North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 432.000 | FY25 | |
6-3229 | Kentucky | Boone | Boone County | Burlington KY 18 Sidewalks | North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | 2025 | CO | Local | 108.000 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2021 | D | OKI-TA | 43.000 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2021 | D-SF | OKI-TA | 5.000 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2021 | D | Local | 10.750 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2025 | UT | OKI-TAP | 78.080 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2025 | UT | Local | 19.520 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 264.584 | FY25 | |
6-3231 | Kentucky | Boone | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | 2025 | CO | Local | 66.146 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | D | OKI-TAP | 27.795 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | D-SF | OKI-TAP | 2.790 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | D | Local | 6.949 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | RW | OKI-TAP | 8.000 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | RW | Local | 2.000 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | CO | OKI-TAP | 154.924 | FY25 | |
6-3232 | Kentucky | Campbell | City of Silver Grove | SilverGrove KY 8 Sidewalks Phase 3 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | 2025 | CO | Local | 38.731 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2024 | D-SF | OKI-SNK | 24.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2024 | D-SF | State | 6.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2024 | D | OKI-SNK | 132.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2024 | D | Local | 33.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | RW | OKI-SNK | 340.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | RW | Local | 85.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | UT | OKI-SNK | 194.000 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | UT | Local | 48.500 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | CO | OKI-SNK | 621.594 | FY25 | |
6-340 | Kentucky | Campbell | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | 2025 | CO | Local | 155.398 | FY25 | |
6-352 | Kentucky | Campbell | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | 2015 | D | SPP | 2.550.000 | FY24 | |
6-352 | Kentucky | Campbell | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | 2022 | RW | SPP | 1.500.000 | FY24 | |
6-352 | Kentucky | Campbell | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | 2023 | UT | SPP | 1.500.000 | FY24 | |
6-352 | Kentucky | Campbell | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | 2024 | CO | SPP | 1.500.000 | FY24 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2024 | D | OKI-SNK | 148.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2024 | D | Local | 37.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2024 | D-SF | OKI-SNK | 16.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2024 | D-SF | State | 4.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2025 | RW | OKI-SNK | 120.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2025 | RW | Local | 30.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2025 | UT | OKI-SNK | 120.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2025 | UT | Local | 30.000 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2026 | CO | OKI-SNK | 1.362.786 | FY26 | |
6-372 | Kentucky | Campbell | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along both sides of Covert Run | maintenance/reconstruction | 2026 | CO | Local | 340.697 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2024 | D | OKI-SNK | 58.000 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2024 | D | Local | 58.000 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2024 | D-SF | OKI-SNK | 16.000 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2024 | D-SF | State | 4.000 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2026 | CO | OKI-SNK | 572.035 | FY26 | |
6-373 | Kentucky | Boone | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | 2026 | CO | Local | 572.035 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2024 | D | OKI-SNK | 191.858 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2024 | D | Local | 47.965 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2024 | D-SF | OKI-SNK | 21.000 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2024 | D-SF | State | 5.250 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2026 | CO | OKI-SNK | 722.059 | FY26 | |
6-374 | Kentucky | Kenton | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | 2026 | CO | Local | 180.515 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2024 | D | OKI-SNK | 8.000 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2024 | D | Local | 2.000 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2024 | D-SF | OKI-SNK | 5.000 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2024 | D-SF | State | 1.250 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2026 | CO | OKI-SNK | 582.474 | FY26 | |
6-375 | Kentucky | Campbell | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | 2026 | CO | Local | 145.619 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2023 | D-SF | OKI-SNK | 30.000 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2023 | D-SF | State | 7.500 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2025 | RW | OKI-SNK | 212.000 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2025 | RW | Local | 53.000 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2025 | UT | OKI-SNK | 500.000 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2025 | UT | Local | 125.000 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2026 | CO | OKI-SNK | 3.056.173 | FY26 | |
6-376 | Kentucky | Kenton | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | 2026 | CO | Local | 764.043 | FY26 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2024 | D | OKI-CRP | 100.000 | FY25 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2024 | D | Local | 25.000 | FY25 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2024 | D-SF | OKI-CRP | 10.000 | FY25 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2024 | D-SF | State | 2.500 | FY25 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2025 | CO | OKI-CRP | 640.000 | FY25 | |
6-379 | Kentucky | Boone | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | 2025 | CO | Local | 160.000 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2024 | D | OKI-CRP | 100.000 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2024 | D | Local | 25.000 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2024 | D-SF | OKI-CRP | 10.000 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2024 | D-SF | State | 2.500 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2025 | CO | OKI-CRP | 500.000 | FY25 | |
6-380 | Kentucky | Kenton | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | 2025 | CO | Local | 125.000 | FY25 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2024 | D | OKI-SNK | 51.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2024 | D | Local | 34.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2024 | D-SF | OKI-SNK | 9.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2024 | D-SF | State | 2.250 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2026 | RW | OKI-SNK | 33.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2026 | RW | Local | 22.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2026 | UT | OKI-SNK | 27.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2026 | UT | Local | 18.000 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2027 | CO | OKI-SNK | 1.285.200 | FY27 | |
6-381 | Kentucky | Kenton | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | 2027 | CO | Local | 856.800 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2024 | D | OKI-SNK | 142.319 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2024 | D | Local | 76.634 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2024 | D-SF | OKI-SNK | 22.000 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2024 | D-SF | State | 5.500 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2026 | UT | OKI-SNK | 579.703 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2026 | UT | Local | 312.148 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2027 | CO | OKI-SNK | 1.176.111 | FY27 | |
6-382 | Kentucky | Kenton | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | 2027 | CO | Local | 633.291 | FY27 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | D | OKI-CRP | 87.500 | FY26 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | D | Local | 37.500 | FY26 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | D-SF | OKI-CRP | 10.000 | FY26 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | D-SF | State | 2.500 | FY26 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | CO | OKI-CRP | 2.152.500 | FY26 | |
6-386 | Kentucky | Boone | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | 2025 | CO | Local | 922.500 | FY26 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2025 | D | OKI-SNK | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2025 | D | Local | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2025 | D-SF | OKI-SNK | 30.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2025 | D-SF | State | 7.500 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2027 | RW | OKI-SNK | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2027 | RW | Local | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2027 | UT | OKI-SNK | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2027 | UT | Local | 150.000 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2028 | CO | OKI-SNK | 897.859 | FY28 | |
6-389 | Kentucky | Boone | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | 2028 | CO | Local | 897.859 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2025 | D | OKI-SNK | 72.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2025 | D | Local | 48.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2025 | D-SF | OKI-SNK | 15.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2025 | D-SF | State | 3.750 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2027 | RW | OKI-SNK | 9.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2027 | RW | Local | 6.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2027 | UT | OKI-SNK | 30.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2027 | UT | Local | 20.000 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2028 | CO | OKI-SNK | 770.839 | FY28 | |
6-390 | Kentucky | Kenton | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | 2028 | CO | Local | 513.893 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2025 | D | OKI-SNK | 321.236 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2025 | D | Local | 80.309 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2025 | D-SF | OKI-SNK | 30.000 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2025 | D-SF | State | 7.500 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2027 | RW | OKI-SNK | 225.600 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2027 | RW | Local | 56.400 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2027 | UT | OKI-SNK | 200.000 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2027 | UT | Local | 50.000 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2028 | CO | OKI-SNK | 2.269.091 | FY28 | |
6-391 | Kentucky | Campbell | City of Highland Heights | US27 Multi-Use Path and Sidewalk | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct multi-use path on north/west side | bicycle/pedestrian | 2028 | CO | Local | 567.273 | FY28 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2016 | D | OKI-SNK | 95.000 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2022 | D | OKI-SNK | 10.880 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2016 | D | Local | 23.750 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2022 | D | Local | 2.720 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2022 | D-SF | OKI-SNK | 9.874 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2022 | RW | OKI-SNK | 28.720 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2022 | RW | Local | 7.180 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2025 | CO | OKI-SNK | 976.117 | FY25 | |
6-427 | Kentucky | Campbell | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | 2025 | CO | Local | 244.029 | FY25 | |
6-428.30 | Kentucky | Kenton | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | 2019 | D | OKI-SNK | 449.000 | FY25 | |
6-428.30 | Kentucky | Kenton | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | 2019 | D | Local | 299.333 | FY25 | |
6-428.30 | Kentucky | Kenton | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | 2019 | D-SF | OKI-SNK | 44.900 | FY25 | |
6-428.30 | Kentucky | Kenton | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | 2025 | CO | OKI-SNK | 3.027.380 | FY25 | |
6-428.30 | Kentucky | Kenton | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | 2025 | CO | Local | 2.018.253 | FY25 | |
6-4313 | Kentucky | Kenton | KYTC | KY 3716 | from MP 2.25 to 2.30 | Install guardrail on KY 3716 | traffic operations/safety | 2024 | CO | STBG | 8.800 | FY24 | |
6-4313 | Kentucky | Kenton | KYTC | KY 3716 | from MP 2.25 to 2.30 | Install guardrail on KY 3716 | traffic operations/safety | 2024 | CO | State | 2.200 | FY24 | |
6-4316 | Kentucky | Kenton | KYTC | KY 8 | from MP 2.37 to 2.61 | Install guardrails on KY 8 | traffic operations/safety | 2026 | CO | GR | 51.000 | FY26 | |
6-4318 | Kentucky | Boone | KYTC | KY 338 | KY 338 | Install guardrails | Grouped Project | 2026 | CO | HSIP | 4.800 | FY26 | |
6-4318 | Kentucky | Boone | KYTC | KY 338 | KY 338 | Install guardrails | Grouped Project | 2026 | CO | State | 1.200 | FY26 | |
6-435 | Kentucky | Kenton | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | 2018 | D | OKI-SNK | 5.000 | FY25 | |
6-435 | Kentucky | Kenton | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | 2025 | RW | OKI-SNK | 44.800 | FY25 | |
6-435 | Kentucky | Kenton | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | 2025 | RW | Local | 11.200 | FY25 | |
6-435 | Kentucky | Kenton | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 219.346 | FY25 | |
6-435 | Kentucky | Kenton | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | 2025 | CO | Local | 75.147 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2017 | D | OKI-SNK | 264.000 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2017 | D | Local | 46.875 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2019 | RW | OKI-SNK | 48.000 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2019 | RW | Local | 12.500 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2025 | UT | OKI-SNK | 125.000 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2025 | UT | Local | 31.250 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 1.100.000 | FY25 | |
6-441 | Kentucky | Kenton | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | 2025 | CO | Local | 275.000 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2017 | D | OKI-SNK | 9.000 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2023 | D | OKI-SNK | 147.303 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2017 | D | Local | 2.250 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2023 | D | Local | 36.826 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2024 | D-SF | OKI-SNK | 6.000 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2024 | D-SF | State | 1.500 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2024 | RW | OKI-SNK | 246.697 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2024 | RW | Local | 61.674 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2025 | CO | OKI-SNK | 531.080 | FY25 | |
6-442 | Kentucky | Boone | Boone County | Camp Ernst Road | Intersection with Longbranch Road | Improve safety and traffic congestion at the Camp Ernst Road and Longbranch Road intersection | traffic operations/safety | 2025 | CO | Local | 132.770 | FY25 | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2021 | D | NH | 1.500.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2021 | D | State | 375.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2027 | RW | NH | 12.000.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2027 | RW | NH | 20.000.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2027 | RW | State | 3.000.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2027 | RW | State | 5.000.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2030 | UT | NH | 3.480.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2030 | UT | State | 870.000 | UNSC | |
6-446 | Kentucky | Boone | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | 2031 | CO | Uncommitted | 13.000.000 | UNSC | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2022 | D | STBG | 2.976.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2022 | D | State | 744.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2025 | RW | STBG | 17.600.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2025 | RW | State | 4.400.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2025 | UT | STBG | 7.600.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2025 | UT | State | 1.900.000 | FY27 | |
6-447 | Kentucky | Boone | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | 2029 | CO | SPP | 3.000.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2023 | D | STP | 120.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2024 | RW | STBG | 8.400.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2024 | RW | State | 2.100.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2025 | UT | STBG | 1.600.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2025 | UT | State | 400.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2027 | CO | STBG | 8.400.000 | FY27 | |
6-449 | Kentucky | Kenton | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | 2027 | CO | State | 2.100.000 | FY27 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2023 | D | STPF | 2.800.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2023 | D | State | 700.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2027 | RW | STPF | 3.744.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2027 | RW | State | 936.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2027 | UT | STPF | 2.400.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2027 | UT | State | 600.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2028 | CO | STPF | 22.400.000 | FY28 | |
6-450 | Kentucky | Kenton | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | 2028 | CO | State | 5.600.000 | FY28 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2019 | D | OKI-SNK | 833.360 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2019 | D | Local | 208.340 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2019 | D-SF | OKI-SNK | 105.000 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | RW | OKI-SNK | 93.600 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | RW | Local | 23.400 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | UT | OKI-SNK | 1.520.000 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | UT | Local | 380.000 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | CO | OKI-SNK | 3.840.000 | FY25 | |
6-451 | Kentucky | Campbell | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | 2025 | CO | Local | 960.000 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2020 | D | OKI-SNK | 102.500 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2024 | D-SF | OKI-SNK | 40.000 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2020 | D | Local | 102.500 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2025 | RW | OKI-SNK | 120.000 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2025 | RW | Local | 120.000 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 750.000 | FY25 | |
6-459 | Kentucky | Boone | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | 2025 | CO | Local | 750.000 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2023 | D | OKI-SNK | 95.560 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2023 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2023 | D | Local | 23.140 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2025 | RW | OKI-SNK | 8.000 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2025 | RW | Local | 2.000 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 600.970 | FY25 | |
6-461 | Kentucky | Kenton | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | 2025 | CO | Local | 150.243 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2021 | D | OKI-SNK | 75.630 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2021 | D-SF | OKI-SNK | 10.000 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2021 | D | Local | 18.908 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2025 | UT | OKI-SNK | 40.000 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2025 | UT | Local | 10.000 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 2.013.904 | FY25 | |
6-462 | Kentucky | Campbell | City of Dayton | Dayton Riverfront Commons-Phase 2 & Eastern Trail | Between Berry Street and Fourth Avenue (KY 8) | Continuation of Riverfront Commons multi-use path | bicycle/pedestrian/other | 2025 | CO | Local | 503.476 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2021 | D | OKI-SNK | 173.456 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2021 | D-SF | OKI-SNk | 19.000 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2021 | D | Local | 42.114 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2024 | RW | OKI-SNK | 117.442 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2024 | RW | Local | 29.361 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2025 | CO | OKI-SNK | 621.168 | FY25 | |
6-463 | Kentucky | Kenton | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | 2025 | CO | Local | 155.292 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2020 | D | OKI-SNK | 222.732 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2020 | D | Local | 55.683 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2020 | D-SF | OKI-SNK | 30.935 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2020 | D-SF | State | 6.187 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2025 | CO | OKI-SNK | 2.139.540 | FY25 | |
6-466 | Kentucky | Boone | City of Florence | Florence Signal Upgrade | US 42, Mall Road and Ewing Blvd | Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network | traffic operations/safety | 2025 | CO | Local | 676.068 | FY25 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2027 | D | NH | 1.600.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2027 | D | State | 400.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2028 | RW | NH | 16.000.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2028 | RW | State | 4.000.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2028 | UT | NH | 8.000.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2028 | UT | State | 2.000.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2030 | CO | NHPP | 208.000.000 | FY30 | |
6-79.00 | Kentucky | Kenton | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | 2030 | CO | State | 52.000.000 | FY30 | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2022 | Pl | NH | 872.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2022 | Pl | State | 218.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2025 | D | NH | 2.400.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2025 | D | NH | 600.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2026 | RW | NH | 1.600.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2027 | RW | NH | 8.000.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2026 | RW | State | 400.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2027 | RW | State | 2.000.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2028 | UT | NH | 1.200.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2028 | UT | State | 300.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2030 | CO | Uncommitted | 75.000.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2029 | CO | NH | 20.000.000 | UNSC | |
6-80.00 | Kentucky | Kenton | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | 2029 | CO | State | 5.000.000 | UNSC | |
6-80000 | Kentucky | Boone | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | 2022 | D | SPP | 2.080.000 | UNSC | |
6-80000 | Kentucky | Boone | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | 2027 | RW | Uncommitted | 1.500.000 | UNSC | |
6-80000 | Kentucky | Boone | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | 2027 | UT | Uncommitted | 3.380.000 | UNSC | |
6-80000 | Kentucky | Boone | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | 2028 | CO | Uncommitted | 22.780.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2026 | RW | STBG | 800.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2027 | RW | STBG | 1.200.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2027 | RW | State | 300.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2026 | RW | State | 200.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2027 | UT | STBG | 1.120.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2027 | UT | State | 280.000 | UNSC | |
6-80001 | Kentucky | Boone | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | 2028 | CO | Uncommitted | 4.500.000 | UNSC | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2022 | D | STBG | 1.328.000 | FY24 | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2022 | D | State | 332.000 | FY24 | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2023 | RW | STBG | 1.304.000 | FY24 | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2023 | RW | State | 326.000 | FY24 | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2024 | CO | STBG | 5.160.000 | FY24 | |
6-80002 | Kentucky | Kenton | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | 2024 | CO | State | 1.290.000 | FY24 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2025 | D | STBG | 2.000.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2025 | D | State | 500.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2028 | RW | STBG | 8.800.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2028 | RW | State | 2.200.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2029 | UT | STBG | 1.200.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2029 | UT | State | 300.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2030 | CO | STBG | 20.000.000 | FY30 | |
6-80100 | Kentucky | Boone | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | 2030 | CO | State | 5.000.000 | FY30 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2022 | D | SPP | 1.930.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2022 | RW | STBG | 2.700.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2022 | RW | State | 600.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2025 | UT | STBG | 2.312.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2025 | UT | State | 300.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2027 | CO | STBG | 12.800.000 | FY27 | |
6-80101 | Kentucky | Boone | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | 2027 | CO | State | 3.200.000 | FY27 | |
6-80102 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | 2022 | D | SPP | 3.000.000 | UNSC | |
6-80102 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | 2023 | RW | STBG | 10.400.000 | UNSC | |
6-80102 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | 2023 | RW | State | 2.600.000 | UNSC | |
6-80102 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | 2026 | UT | Uncommitted | 4.200.000 | UNSC | |
6-80102 | Kentucky | Boone | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | 2028 | CO | Uncommitted | 23.000.000 | UNSC | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2025 | D | NH | 2.400.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2025 | D | State | 600.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2028 | RW | NH | 14.264.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2028 | RW | State | 3.566.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2028 | UT | NH | 4.480.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2028 | UT | State | 1.120.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2029 | CO | NH | 24.000.000 | FY29 | |
6-80105 | Kentucky | Kenton | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | 2029 | CO | State | 6.000.000 | FY29 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2022 | D | STBG | 800.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2022 | D | State | 200.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2025 | RW | STBG | 4.000.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2025 | RW | State | 1.000.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2026 | UT | STBG | 1.596.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2026 | UT | State | 400.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2027 | CO | STBG | 7.600.000 | FY27 | |
6-80150 | Kentucky | Boone | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | 2027 | CO | State | 1.900.000 | FY27 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2023 | D | NH | 2.400.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2023 | D | State | 600.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2028 | RW | STP2 | 14.400.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2028 | RW | State | 3.600.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2028 | UT | STP2 | 8.000.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2028 | UT | State | 2.000.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2030 | CO | STP2 | 88.000.000 | FY30 | |
6-80203 | Kentucky | Kenton | KYTC | KY 536 | KY 16 to Campbell County Line | Reconstruct to a 4-lane urban section | widening/relocation | 2030 | CO | State | 22.000.000 | FY30 | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2024 | D | STP2 | 3.608.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2024 | D | State | 902.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2026 | RW | STP2 | 4.000.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2027 | RW | STP2 | 8.000.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2026 | RW | State | 1.000.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2027 | RW | State | 2.000.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2026 | UT | STP2 | 2.000.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2026 | UT | State | 500.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2027 | CO | STP2 | 22.400.000 | UNSC | |
6-80207 | Kentucky | Boone | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | 2028 | CO | State | 5.600.000 | UNSC | |
6-80209 | Kentucky | Boone | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | 2022 | D | STBG | 432.800 | UNSC | |
6-80209 | Kentucky | Boone | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | 2022 | D | State | 108.200 | UNSC | |
6-80209 | Kentucky | Boone | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | 2027 | RW | Uncommitted | 1.000.000 | UNSC | |
6-80209 | Kentucky | Boone | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | 2026 | UT | Uncommitted | 300.000 | UNSC | |
6-80209 | Kentucky | Boone | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | 2028 | CO | Uncommitted | 4.600.000 | UNSC | |
6-80212 | Kentucky | Boone | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | 2024 | D | Federal | 4.800.000 | UNSC | |
6-80212 | Kentucky | Boone | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | 2024 | D | State | 1.200.000 | UNSC | |
6-80212 | Kentucky | Boone | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | 2028 | CO | Uncommitted | 66.000.000 | UNSC | |
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2025 | D | STBG | 3.968.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2025 | D | State | 992.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2028 | RW | STBG | 12.480.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2028 | RW | State | 3.120.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2029 | UT | STBG | 2.728.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2029 | UT | State | 682.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2030 | CO | STBG | 29.760.000 | ||
6-80304 | Kentucky | Boone | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | 2030 | CO | State | 7.440.000 | ||
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2025 | D | STPF | 600.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2025 | D | State | 150.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2027 | RW | STPF | 1.200.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2027 | RW | State | 300.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2027 | UT | STPF | 600.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2027 | UT | State | 150.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2028 | CO | STPF | 6.200.000 | FY28 | |
6-80314 | Kentucky | Campbell | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | 2028 | CO | State | 1.550.000 | FY28 | |
6-80352 | Kentucky | Boone | KYTC | I-75 @ KY 14/16 | I-75 (MP 171) South ramp to KY 14/16 Mary Grubbs Highway | Add additional exit lane and align lights to provide 2 left turn lanes and 1 right turn lane. Ramp only work. | traffic operations/safety | 2025 | CO | SAF | 1.350.000 | FY25 | |
6-80352 | Kentucky | Boone | KYTC | I-75 @ KY 14/16 | I-75 (MP 171) South ramp to KY 14/16 Mary Grubbs Highway | Add additional exit lane and align lights to provide 2 left turn lanes and 1 right turn lane. Ramp only work. | traffic operations/safety | 2025 | CO | State | 150.000 | FY25 | |
6-81.00 | Kentucky | Campbell | KYTC | IR 471 | from MP 0.0 to 5.016 | Study corridor for congestion improvements | Grouped Project | 2024 | PL | NHPP | 1.200.000 | FY22 | |
6-81.00 | Kentucky | Campbell | KYTC | IR 471 | from MP 0.0 to 5.016 | Study corridor for congestion improvements | Grouped Project | 2024 | PL | State | 300.000 | FY22 | |
6-8105.06 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd | widening/relocation | 2023 | D | STBG | 800.000 | FY25 | |
6-8105.06 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd | widening/relocation | 2023 | D | State | 200.000 | FY25 | |
6-8105.07 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | 2023 | RW | STBG | 4.971.200 | FY25 | |
6-8105.07 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | 2023 | RW | State | 1.242.800 | FY25 | |
6-8105.07 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | 2025 | UT | Uncommitted | 1.760.000 | FY25 | |
6-8105.07 | Kentucky | Campbell | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | 2026 | CO | Uncommitted | 12.410.000 | FY25 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2017 | D | TAP | 300.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | RW | TAP | 320.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | RW | Local | 80.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | UT | TAP | 120.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | UT | Local | 30.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | CO | TAP | 1.120.000 | FY23 | |
6-8815 | Kentucky | Kenton | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | 2020 | CO | Local | 280.000 | FY23 | |
6-8915 | Kentucky | Kenton | KYTC | IR 275 | From US 25 (Dixie Hwy) westbound (toll credits) | Construct a sound barrier wall | maintenance/reconstruction | 2017 | D | STP | 100.000 | FY23 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2021 | D | STBG | 456.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2021 | D | State | 114.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2027 | RW | STBG | 8.000.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2026 | RW | STBG | 6.400.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2026 | RW | State | 1.600.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2027 | RW | State | 2.000.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2028 | UT | STBG | 1.872.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2028 | UT | State | 468.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2028 | CO | STBG | 4.800.000 | FY29 | |
6-8951 | Kentucky | Kenton | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | 2028 | CO | State | 1.200.000 | FY29 | |
6-8954 | Kentucky | Kenton | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | 2021 | D | BR | 400.000 | FY23 | |
6-8954 | Kentucky | Kenton | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | 2021 | RW | BR | 750.000 | FY23 | |
6-8954 | Kentucky | Kenton | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | 2021 | UT | BR | 500.000 | FY23 | |
6-8954 | Kentucky | Kenton | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | 2021 | CO | BR | 1.500.000 | FY23 | |
6-9029 | Kentucky | Campbell | KYTC | KY 1120 | from MP 1.6 to 1.66 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 35.438 | FY25 | |
6-9029 | Kentucky | Campbell | KYTC | KY 1120 | from MP 1.6 to 1.66 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 3.938 | FY25 | |
6-903.00 | Kentucky | Boone | KYTC | District 6 Safety Program-various | Various Off Ramps in District 6 | Installation of Wrong Way Driving Signs and Pavement Markings | Grouped Project | 2024 | CO | HSIP | 1.515.200 | FY24 | |
6-903.00 | Kentucky | Boone | KYTC | District 6 Safety Program-various | Various Off Ramps in District 6 | Installation of Wrong Way Driving Signs and Pavement Markings | Grouped Project | 2024 | CO | State | 378.800 | FY24 | |
6-9030 | Kentucky | Campbell | KYTC | US 27 | from MP 16.5 to 16.64 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 116.438 | FY25 | |
6-9030 | Kentucky | Campbell | KYTC | US 27 | from MP 16.5 to 16.64 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 12.938 | FY25 | |
6-9031 | Kentucky | Campbell | KYTC | US 27 | from MP 16.62 to 16.734 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 81.000 | FY25 | |
6-9031 | Kentucky | Campbell | KYTC | US 27 | from MP 16.62 to 16.734 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 9.000 | FY25 | |
6-9032 | Kentucky | Kenton | KYTC | I-75 Ramp 131 | from MP 0.15 to 0.341 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 45.563 | FY25 | |
6-9032 | Kentucky | Kenton | KYTC | I-75 Ramp 131 | from MP 0.15 to 0.341 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 5.063 | FY25 | |
6-9033 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.167 to 13.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 283.500 | FY25 | |
6-9033 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.167 to 13.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 31.500 | FY25 | |
6-9034 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.48 to 13.80 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 222.750 | FY25 | |
6-9034 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.48 to 13.80 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 24.750 | FY25 | |
6-9035 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.9 to 14.022 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 45.563 | FY25 | |
6-9035 | Kentucky | Kenton | KYTC | KY 16 | from MP 13.9 to 14.022 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 5.062 | FY25 | |
6-9036 | Kentucky | Kenton | KYTC | KY 16 | from MP 7.85 to 8.1 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 151.875 | FY25 | |
6-9036 | Kentucky | Kenton | KYTC | KY 16 | from MP 7.85 to 8.1 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 16.875 | FY25 | |
6-9037 | Kentucky | Kenton | KYTC | KY 536 | from MP 6.08 to 6.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 45.563 | FY25 | |
6-9037 | Kentucky | Kenton | KYTC | KY 536 | from MP 6.08 to 6.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 5.062 | FY25 | |
6-9038 | Kentucky | Kenton | KYTC | KY 536 | from MP 7.42 to 7.60 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 46.123 | FY25 | |
6-9038 | Kentucky | Kenton | KYTC | KY 536 | from MP 7.42 to 7.60 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 5.125 | FY25 | |
6-9039 | Kentucky | Kenton | KYTC | KY 2045 | from MP 0.0 to 1.34 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 389.813 | FY25 | |
6-9039 | Kentucky | Kenton | KYTC | KY 2045 | from MP 0.0 to 1.34 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 43.312 | FY25 | |
6-9040 | Kentucky | Kenton | KYTC | KY 2373 | from MP 0.3 to 0.6 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 151.875 | FY25 | |
6-9040 | Kentucky | Kenton | KYTC | KY 2373 | from MP 0.3 to 0.6 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 16.875 | FY25 | |
6-944.00 | Kentucky | Boone | KYTC | US 42 | on US 42 from MP 5.03 to MP 5.24 in Boone County, KY | Installation of High Friction Surface Treatment on US 42 from MP 5.03 to MP 5.24 in Boone County, KY. (2022BOP) | Grouped Project | 2024 | CO | HSIP | 72.000 | ||
6-944.00 | Kentucky | Boone | KYTC | US 42 | on US 42 from MP 5.03 to MP 5.24 in Boone County, KY | Installation of High Friction Surface Treatment on US 42 from MP 5.03 to MP 5.24 in Boone County, KY. (2022BOP) | Grouped Project | 2024 | CO | State | 8.000 | ||
6-946.00 | Kentucky | Kenton | KYTC | KY 371 | on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY. (2022BOP) | Grouped Project | 2024 | CO | HSIP | 103.950 | ||
6-946.00 | Kentucky | Kenton | KYTC | KY 371 | on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY. (2022BOP) | Grouped Project | 2024 | CO | State | 11.550 | ||
6-951 | Kentucky | Boone | KYTC | KY 18 | from MP 16.35 to 16.55 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 70.875 | FY25 | |
6-951 | Kentucky | Boone | KYTC | KY 18 | from MP 16.35 to 16.55 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 7.875 | FY25 | |
6-952 | Kentucky | Boone | KYTC | US 25 | from MP 8.35 to 8.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 50.625 | FY25 | |
6-952 | Kentucky | Boone | KYTC | US 25 | from MP 8.35 to 8.45 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 5.625 | FY25 | |
6-953 | Kentucky | Boone | KYTC | US 25 | from MP 8.45 to 8.55 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 35.438 | FY25 | |
6-953 | Kentucky | Boone | KYTC | US 25 | from MP 8.45 to 8.55 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 3.938 | FY25 | |
6-954 | Kentucky | Campbell | KYTC | I-471 Ramp 111 | from MP 0.10 to 0.264 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 182.250 | FY25 | |
6-954 | Kentucky | Campbell | KYTC | I-471 Ramp 111 | from MP 0.10 to 0.264 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 20.250 | FY25 | |
6-955 | Kentucky | Campbell | KYTC | I-471 Ramp 131 | from MP 0.35 to 0.40 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 131.625 | FY25 | |
6-955 | Kentucky | Campbell | KYTC | I-471 Ramp 131 | from MP 0.35 to 0.40 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 14.625 | FY25 | |
6-956 | Kentucky | Campbell | KYTC | KY 1120 | from MP 1.3 to 1.5 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | HSIP | 101.250 | FY25 | |
6-956 | Kentucky | Campbell | KYTC | KY 1120 | from MP 1.3 to 1.5 | Installation of High Friction Surface Treatment | Grouped Project | 2025 | CO | State | 11.250 | FY25 | |
75630 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 123 12.95 | From 2.02 miles south of IR 71 to 2.0 miles South of IR 71. | Rehabiltate Bridge No. WAR-123-1296, SFN: 8304351 over a tributary of Halls Creek by replacing the inlet wingwalls, patching and performing other minor rehabilitation items. | Grouped Project | 2025 | DD | State | 30.000 | ||
75630 | Ohio | Warren | ODOT SPONSORING AGENCY | WAR SR 123 12.95 | From 2.02 miles south of IR 71 to 2.0 miles South of IR 71. | Rehabiltate Bridge No. WAR-123-1296, SFN: 8304351 over a tributary of Halls Creek by replacing the inlet wingwalls, patching and performing other minor rehabilitation items. | Grouped Project | 2025 | RW | State | 24.000 | ||
77925 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32- | Grouped Project | 2026 | CO | State | 1.417.712 | ||
77930 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 42 9.75/12.22 | HAM US 42 from SLM 9.75-9.87 & 12.29-13.12 | Resurfacing a portion of US 42 in Hamilton County | Grouped Project | 2027 | CO | Preservation | 485.896 | ||
77930 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 42 9.75/12.22 | HAM US 42 from SLM 9.75-9.87 & 12.29-13.12 | Resurfacing a portion of US 42 in Hamilton County | Grouped Project | 2027 | CO | State | 121.474 | ||
81468 | Ohio | Clermont | ODOT SPONSORING AGENCY | CLE SR 756 0.10 | Begin 0.10 miles S of SR 232 to 0.20 miles S. of SR 232. | Rehabilitate Bridge CLE-756-0013. Replace concrete deck and provide pier protection. | Grouped Project | 2027 | ENV | State | 85.000 | ||
86461 | Ohio | Hamilton | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Grouped Project | 2027 | CO | Local | 401.315 | ||
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2012 | PE | NHS | 1.270.500 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2012 | PE | State | 139.500 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2016 | RW | Major New | 120.000 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2016 | RW | State | 107.702 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2024 | CO | Major Programs | 30.445.674 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2024 | CO | Preservation | 1.644.000 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2024 | CO | Federa Labor | 2.131.197 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2024 | CO | State | 5.819.129 | FY30 | |
88124 | Ohio | Hamilton | ODOT | HAM IR 75 10.10 | 1010 Bridge over Mill creek to Galbraith Road (phase 3) | Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements | widening/relocation | 2030 | CO | Unscheduled | 52.046.876 | FY30 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2012 | PE-DD | NHS | 1.298.040 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2012 | PE-DD | State | 463.331 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2021 | PE-ENV | State | 7.491 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2020 | RW | Major New | 952.236 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2024 | RW | Major New | 3.440.000 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2020 | RW | State | 238.090 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2024 | RW | State | 860.000 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2026 | CO | Major New | 54.000.000 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2026 | CO | State | 13.500.000 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2026 | CE | Federal Labor | 3.780.000 | 3Q26 | |
88129 | Ohio | Hamilton | ODOT | IR 75 | Railroad bridge 11.09 on southbound IR 75 in the split | Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 | bridge/culvert replacement | 2026 | CE | State Labor | 945.000 | 3Q26 | |
88672 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Surface treatment on a portion of US 27 in Hamilton County | Grouped Project | 2027 | CO | Preservation | 6.459.456 | ||
88672 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Surface treatment on a portion of US 27 in Hamilton County | Grouped Project | 2027 | CO | State | 1.614.864 | ||
96694 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM US 42 14.36 | US42 in Sharonville: 0.02 to 0.09 miles north of the intersection with East Sharon Rd. | Repair the bridge size culvert HAM-42-1437 that carries Northbound US 42 over a tributary of Sharon Creek. | Grouped Project | 2024 | CO | State | 645.000 | ||
98508 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM BS FY 2026 | HAM CO: varies. | Hamilton County bridge sealing contract for 2026. Bridge locations will be determined at a later date. | Grouped Project | 2026 | CO | Preservation | 1.574.487 | ||
98508 | Ohio | Hamilton | ODOT SPONSORING AGENCY | HAM BS FY 2026 | HAM CO: varies. | Hamilton County bridge sealing contract for 2026. Bridge locations will be determined at a later date. | Grouped Project | 2026 | CO | State | 174.943 | ||
98569 | Ohio | Butler | ODOT SPONSORING AGENCY | BUT SR 503 0.00 | BUT SR 503: SLM 0- 6.05 | Resurfacing a portion of SR 503 in Butler County | Grouped Project | 2026 | CO | State | 317.110 | ||
NKY-RAISE1 | Kentucky | Campbell | City of Bellevue | Northern Kentucky Riverfront Commons | along the Ohio River between Ludlow and Melbourne | Planning and design of the approximately 20-mile multimodal transportation corridor | bicycle/pedestrian/other | 2024 | D | Federal Discretionary | 3.774.940 | FY24 | |
NKY-RAISE1 | Kentucky | Campbell | City of Bellevue | Northern Kentucky Riverfront Commons | along the Ohio River between Ludlow and Melbourne | Planning and design of the approximately 20-mile multimodal transportation corridor | bicycle/pedestrian/other | 2024 | D | Local | 943.735 | FY24 | |
NKY-RAISE2 | Kentucky | Boone | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | 2025 | D | Federal Discretionary | 2.941.250 | FY30 | |
NKY-RAISE2 | Kentucky | Boone | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | 2025 | D | Local | 1.333.750 | FY30 | |
NKY-RAISE2 | Kentucky | Boone | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | 2030 | CO | Uncommitted | 40.000.000 | FY30 | |
NP-CFI1 | Ohio | Hamilton | City of Cincinnati | Cincinnati EV Charging Infrastructure | at least 15 locations in the City of Cincinnati | Developing an Equitable and Accessible EV Charging Infrastructure with two to four publicly accessible Level 2 EC charging ports that are either in or adjacent to disadvantaged communities | other | 2025 | CO | Federal Discretionary | 854.547 | FY25 | |
NP-CFI1 | Ohio | Hamilton | City of Cincinnati | Cincinnati EV Charging Infrastructure | at least 15 locations in the City of Cincinnati | Developing an Equitable and Accessible EV Charging Infrastructure with two to four publicly accessible Level 2 EC charging ports that are either in or adjacent to disadvantaged communities | other | 2025 | CO | Local | 213.637 | FY25 | |
RTP21R-029 | Kentucky | Campbell | City of Newport | Purple Bridge Maintenance and Upgrades | Purple People Bridge over the Ohio River in Newport | Address maintenance needs, especially the joint between the bridge stations. Project also includes repainting and improving the electrical and plumbing services to the bridge | bridge/culvert replacement | 2022 | CO | Recreational Trails Funds | 175.000 | FY23 | |
RTP21R-029 | Kentucky | Campbell | City of Newport | Purple Bridge Maintenance and Upgrades | Purple People Bridge over the Ohio River in Newport | Address maintenance needs, especially the joint between the bridge stations. Project also includes repainting and improving the electrical and plumbing services to the bridge | bridge/culvert replacement | 2022 | CO | Local | 43.750 | FY23 | |
SS4A-1 | Kentucky | Boone | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | 2025 | D | Federal Discretionary | 10.000 | FY25 | |
SS4A-1 | Kentucky | Boone | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | 2025 | D | Local | 2.500 | FY25 | |
SS4A-1 | Kentucky | Boone | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | 2025 | CO | Federal Discretionary | 699.064 | FY25 | |
SS4A-1 | Kentucky | Boone | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | 2025 | CO | Local | 174.766 | FY25 |
TIP Transit Projects
OID | State | County | LPA Sponsor | PID | FTA ALI Code | Year | Facility | Location | Description | Fund Type | Funding |
---|---|---|---|---|---|---|---|---|---|---|---|
10.286 | Ohio | Butler | Butler County Regional Transit Authority | 104272 | 30.09.03 | 2024 | BCRTA Operating Assistance | Butler County | Operating Assistance | 5307-Urban Formula | 1.300.000 |
10.286 | Ohio | Butler | Butler County Regional Transit Authority | 104272 | 30.09.03 | 2024 | BCRTA Operating Assistance | Butler County | Operating Assistance | Local | 1.300.000 |
10.290 | Ohio | Butler | Butler County Regional Transit Authority | 104280 | 11.7A.00 | 2024 | BCRTA Prev Maintenance | Butler County | Preventive Maintenance | 5307-Urban Formula | 600.000 |
10.290 | Ohio | Butler | Butler County Regional Transit Authority | 104280 | 11.7A.00 | 2024 | BCRTA Prev Maintenance | Butler County | Preventive Maintenance | Local | 150.000 |
10.274 | Ohio | Butler | Butler County Regional Transit Authority | 104384 | 11.7C.00 | 2024 | BCRTA ADA Operating | Butler County | ADA Operating Assistance | 5307-Urban Formula | 150.000 |
10.274 | Ohio | Butler | Butler County Regional Transit Authority | 104384 | 11.7C.00 | 2024 | BCRTA ADA Operating | Butler County | ADA Operating Assistance | Local | 37.500 |
10.294 | Ohio | Butler | Butler County Regional Transit Authority | 104389 | 11.49.09 | 2024 | BCRTA Security Equipment | Butler County | Security Equipment | 5307-Urban Formula | 15.000 |
10.294 | Ohio | Butler | Butler County Regional Transit Authority | 104389 | 11.49.09 | 2024 | BCRTA Security Equipment | Butler County | Security Equipment | Local | 3.750 |
10.298 | Ohio | Butler | Butler County Regional Transit Authority | 104394 | 11.42.20 | 2024 | BCRTA Shop/Office Equipment | Butler County | Shop/Office Equipment | 5307-Urban Formula | 35.000 |
10.298 | Ohio | Butler | Butler County Regional Transit Authority | 104394 | 11.42.20 | 2024 | BCRTA Shop/Office Equipment | Butler County | Shop/Office Equipment | Local | 8.750 |
10.306 | Ohio | Butler | Butler County Regional Transit Authority | 104400 | 11.32.10 | 2024 | BCRTA Transit Enhancements | Butler County | Transit Enhancements | 5307-Urban Formula | 15.000 |
10.306 | Ohio | Butler | Butler County Regional Transit Authority | 104400 | 11.32.10 | 2024 | BCRTA Transit Enhancements | Butler County | Transit Enhancements | Local | 3.750 |
10.278 | Ohio | Butler | Butler County Regional Transit Authority | 104453 | 11.44.03 | 2024 | BCRTA Facility Improvements | Butler County | Facility Improvements | 5307-Urban Formula | 25.000 |
10.278 | Ohio | Butler | Butler County Regional Transit Authority | 104453 | 11.44.03 | 2024 | BCRTA Facility Improvements | Butler County | Facility Improvements | 5339-Bus & Bus Facilities | 150.000 |
10.278 | Ohio | Butler | Butler County Regional Transit Authority | 104453 | 11.44.03 | 2024 | BCRTA Facility Improvements | Butler County | Facility Improvements | Local | 43.750 |
10.282 | Ohio | Butler | Butler County Regional Transit Authority | 112170 | 11.12.04 | 2024 | BCRTA Small Bus Replacement | Butler County | Small Replacement Buses | 5339-Bus & Bus Facilities | 100.000 |
10.282 | Ohio | Butler | Butler County Regional Transit Authority | 112170 | 11.12.04 | 2024 | BCRTA Small Bus Replacement | Butler County | Small Replacement Buses | Local | 25.000 |
10.310 | Ohio | Butler | Butler County Regional Transit Authority | 112173 | 11.43.03 | 2024 | BCRTA Facility Construction | Butler County | Construct facility | 5307-Urban Formula | 100.000 |
10.310 | Ohio | Butler | Butler County Regional Transit Authority | 112173 | 11.43.03 | 2024 | BCRTA Facility Construction | Butler County | Construct facility | Local | 25.000 |
10.310 | Ohio | Butler | Butler County Regional Transit Authority | 112173 | 11.43.03 | 2024 | BCRTA Facility Construction | Butler County | Construct facility | State | 581.287 |
11.182 | Ohio | Butler | Butler County Regional Transit Authority | 115997 | 11.12.02 | 2026 | BCRTA EPIC Bus Replacements FY26 | Butler County | Bus replacements using OKI CMAQ funds as a flex fund transfer for Environmentally Preventing Increasing Carbon (EPIC) vehicles | Local | 1.250.000 |
11.182 | Ohio | Butler | Butler County Regional Transit Authority | 115997 | 11.12.02 | 2026 | BCRTA EPIC Bus Replacements FY26 | Butler County | Bus replacements using OKI CMAQ funds as a flex fund transfer for Environmentally Preventing Increasing Carbon (EPIC) vehicles | OKI-CMAQ | 5.000.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2024 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | 5307-Urban Formula | 1.500.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2024 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | Local | 1.500.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2025 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | 5307-Urban Formula | 1.700.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2025 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | Local | 1.700.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2026 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | 5307-Urban Formula | 1.500.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2026 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | Local | 1.269.900 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2026 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | State | 230.100 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2027 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | 5307-Urban Formula | 1.500.000 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2027 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | Local | 1.269.900 |
11.815 | Ohio | Butler | Butler County Regional Transit Authority | 117998 | 30.09.03 | 2027 | BCRTA Operating Assistance | Butler County | Special Rule Operating 1-75 Buses | State | 230.100 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2024 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | 5307-Urban Formula | 1.000.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2024 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | Local | 250.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2025 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | 5307-Urban Formula | 1.000.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2025 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | Local | 200.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2025 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | State OTP2 | 50.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2026 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | 5307-Urban Formula | 600.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2026 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | Local | 150.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2027 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | 5307-Urban Formula | 600.000 |
11.816 | Ohio | Butler | Butler County Regional Transit Authority | 117999 | 11.7A.00 | 2027 | BCRTA Preventative Maintenance | Butler County | Other Capital Items (Bus-Preventative Maintenance) | Local | 150.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2024 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | 5307-Urban Formula | 600.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2024 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | Local | 150.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2025 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | 5307-Urban Formula | 900.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2025 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | Local | 225.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2026 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | 5307-Urban Formula | 150.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2026 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | Local | 37.500 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2027 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | 5307-Urban Formula | 150.000 |
11.817 | Ohio | Butler | Butler County Regional Transit Authority | 118001 | 11.7C.00 | 2027 | BCRTA ADA Operating | Butler County | Other Capital Items (Bus-Non fixed Route ADA Paratransit) | Local | 37.500 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2025 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | 5307-Urban Formula | 300.000 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2025 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | Federal Flex (ODOT) | 294.810 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2025 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | Local | 73.703 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2025 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | Local | 75.000 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2026 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | 5307-Urban Formula | 15.000 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2026 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | Local | 3.750 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2027 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | 5307-Urban Formula | 15.000 |
11.818 | Ohio | Butler | Butler County Regional Transit Authority | 118004 | 11.42.09 | 2027 | BCRTA Security Equipment | Butler County | Acquisition-Surveillance/Security (Bus) | Local | 3.750 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2024 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | 5307-Urban Formula | 35.000 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2024 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | Local | 8.750 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2025 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | 5307-Urban Formula | 300.000 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2025 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | Local | 75.000 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2026 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | 5307-Urban Formula | 35.000 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2026 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | Local | 8.750 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2027 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | 5307-Urban Formula | 35.000 |
11.819 | Ohio | Butler | Butler County Regional Transit Authority | 118006 | 11.42.20 | 2027 | BCRTA Shop/Office Equipment | Butler County | Acquisition - Miscellaneous Equipment | Local | 8.750 |
11.306 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.07 | 2025 | BCRTA Software/Hardware | Butler County | Acquisition-ADP Hardware | 5307-Urban Formula | 100.000 |
11.306 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.07 | 2025 | BCRTA Software/Hardware | Butler County | Acquisition-ADP Hardware | Federal Flex (ODOT) | 124.508 |
11.306 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.07 | 2025 | BCRTA Software/Hardware | Butler County | Acquisition-ADP Hardware | Local | 25.000 |
11.306 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.07 | 2025 | BCRTA Software/Hardware | Butler County | Acquisition-ADP Hardware | Local | 31.127 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2025 | BCRTA Software/Hardware | Butler County | Software/Hardware | Federal Flex (ODOT) | 126.944 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2025 | BCRTA Software/Hardware | Butler County | Software/Hardware | Local | 31.736 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2026 | BCRTA Software/Hardware | Butler County | Software/Hardware | 5307-Urban Formula | 120.000 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2026 | BCRTA Software/Hardware | Butler County | Software/Hardware | Local | 30.000 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2027 | BCRTA Software/Hardware | Butler County | Software/Hardware | 5307-Urban Formula | 120.000 |
11.957 | Ohio | Butler | Butler County Regional Transit Authority | 118007 | 11.42.08 | 2027 | BCRTA Software/Hardware | Butler County | Software/Hardware | Local | 30.000 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2024 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | 5307-Urban Formula | 15.000 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2024 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | Local | 3.750 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2025 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | 5307-Urban Formula | 15.000 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2025 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | Local | 3.750 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2026 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | 5307-Urban Formula | 15.000 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2026 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | Local | 3.750 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2027 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | 5307-Urban Formula | 15.000 |
11.308 | Ohio | Butler | Butler County Regional Transit Authority | 118013 | 11.32.20 | 2027 | BCRTA Bus Station/Stops/Terminals | Butler County | Transit Enhancements | Local | 3.750 |
11.946 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.09 | 2025 | BCRTA Vehicle security equipment | Butler County | Vehicle sequirity equipment | 5307-Urban Formula | 420.000 |
11.946 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.09 | 2025 | BCRTA Vehicle security equipment | Butler County | Vehicle sequirity equipment | Local | 105.000 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2024 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | 5339-(non-ODOT) | 250.000 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2024 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | Local | 62.500 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2025 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | 5339-(non-ODOT) | 250.000 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2025 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | Local | 62.500 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2026 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | 5339-(non-ODOT) | 250.000 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2026 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | Local | 62.500 |
11.310 | Ohio | Butler | Butler County Regional Transit Authority | 118014 | 11.42.20 | 2027 | BCRTA Equipment | Butler County | Acquisition-Miscellaneous Equipment | Local | 62.500 |
11.935 | Ohio | Butler | Butler County Regional Transit Authority | 119837 | 11.12.04 | 2025 | BCRTA Small bus replace with Low Emission Vehicles | Butler County | Small bus replacements with low emission vehicles with Lo/No Program | Local | 200.000 |
11.935 | Ohio | Butler | Butler County Regional Transit Authority | 119837 | 11.12.04 | 2025 | BCRTA Small bus replace with Low Emission Vehicles | Butler County | Small bus replacements with low emission vehicles with Lo/No Program | Section 5339c | 800.000 |
11.936 | Ohio | Butler | Butler County Regional Transit Authority | 119837 | 11.44.05 | 2025 | BCRTA Low Emission Vehicle Infrastructure | Butler County | Low Emission Infrastructure with Lo/No Program | Local | 87.500 |
11.936 | Ohio | Butler | Butler County Regional Transit Authority | 119837 | 11.44.05 | 2025 | BCRTA Low Emission Vehicle Infrastructure | Butler County | Low Emission Infrastructure with Lo/No Program | Section 5339c | 350.000 |
11.937 | Ohio | Butler | Butler County Regional Transit Authority | 120091 | 44.24.00 | 2025 | BCRTA/City of Oxford Planning Study AoPP/5307 | Butler County | BCRTA/City of Oxford Planning Study for Bike/Ped access to transit | 5307-AoPP | 150.000 |
11.937 | Ohio | Butler | Butler County Regional Transit Authority | 120091 | 44.24.00 | 2025 | BCRTA/City of Oxford Planning Study AoPP/5307 | Butler County | BCRTA/City of Oxford Planning Study for Bike/Ped access to transit | Local | 16.667 |
12.175 | Ohio | Butler | Butler County Regional Transit Authority | 121404 | 11.7L.00 | 2025 | BCRTA Mobility Management | Butler County | BCRTA 5310 Program Mobility Management | 5310 (non-ODOT) | 50.000 |
12.175 | Ohio | Butler | Butler County Regional Transit Authority | 121404 | 11.7L.00 | 2025 | BCRTA Mobility Management | Butler County | BCRTA 5310 Program Mobility Management | Local | 50.000 |
12.526 | Ohio | Butler | Butler County Regional Transit Authority | 122718 | 11.43.05 | 2025 | BCRTA Lot Expansion | Butler County | BCRTA Lot Expansion | Federal-STBG Flex | 2.500.000 |
12.526 | Ohio | Butler | Butler County Regional Transit Authority | 122718 | 11.43.05 | 2025 | BCRTA Lot Expansion | Butler County | BCRTA Lot Expansion | Local | 1.000.000 |
12.526 | Ohio | Butler | Butler County Regional Transit Authority | 122718 | 11.43.05 | 2025 | BCRTA Lot Expansion | Butler County | BCRTA Lot Expansion | State | 421.937 |
11.947 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.44.03 | 2024 | Facility Renovation/Rehabilitation | City of Cincinnati Streetcar | Cincinnati Streetcar Facility Renovation/Rehabilitation | Federal Flex Funds (OTP2) CRP -TDC Match | 900.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2024 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | 5307-Urban Formula | 300.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2024 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Federal Flex Funds (OTP2) | 75.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2024 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 18.750 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2024 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 75.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2025 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | 5307-Urban Formula | 283.375 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2025 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Federal Flex Funds (OTP2) | 800.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2025 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 70.845 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2025 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 200.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2025 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | State | 36.080 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2026 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | 5307-Urban Formula | 400.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2026 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 100.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2027 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | 5307-Urban Formula | 450.000 |
11.820 | Ohio | Hamilton | City of Cincinnati Streetcar | 118231 | 12.7A.00 | 2027 | Rail preventative maintenance | City of Cincinnati Streetcar | Cincinnati Streetcar Rail Preventative Maintenance | Local | 112.500 |
12.748 | Ohio | Hamilton | City of Cincinnati Streetcar | 123010 | 12.42.07 | 2025 | Headway Management and realtime arrival integratio | City of Cincinnati Streetcar | Hardware and software purchase for headway management and realtime arrival integration | Federal Flex STBG (OWMP) | 1.213.200 |
12.748 | Ohio | Hamilton | City of Cincinnati Streetcar | 123010 | 12.42.07 | 2025 | Headway Management and realtime arrival integratio | City of Cincinnati Streetcar | Hardware and software purchase for headway management and realtime arrival integration | Local | 303.300 |
12.747 | Ohio | Hamilton | City of Cincinnati Streetcar | 123010 | 44.23.02 | 2025 | Headway Management and realtime arrival integratio | City of Cincinnati Streetcar | Streetcar technology analysis for headway management and realtime arrival integration | Local | 27.778 |
12.747 | Ohio | Hamilton | City of Cincinnati Streetcar | 123010 | 44.23.02 | 2025 | Headway Management and realtime arrival integratio | City of Cincinnati Streetcar | Streetcar technology analysis for headway management and realtime arrival integration | Section 5307 (AoPP) | 250.000 |
11.166 | Ohio | Clermont | Clermont Transportation Connection | 106744 | 11.42.10 | 2024 | CTC Office and Vehicle Equipment | Clermont County | Office and Vehicle Equipment (grant from FY18) | Local | 40.000 |
11.166 | Ohio | Clermont | Clermont Transportation Connection | 106744 | 11.42.10 | 2024 | CTC Office and Vehicle Equipment | Clermont County | Office and Vehicle Equipment (grant from FY18) | Section 5339 | 200.000 |
10.395 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 11.42.09 | 2024 | CTC Capital Items | Clermont County | Security & Routing System | 5307-Urban Formula | 100.000 |
10.395 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 11.42.09 | 2024 | CTC Capital Items | Clermont County | Security & Routing System | Local | 25.000 |
12.750 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 30.09.03 | 2025 | CTC Operating Assistance | Clermont County | Operations Funding | 5307-Urban Formula | 600.000 |
12.750 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 30.09.03 | 2025 | CTC Operating Assistance | Clermont County | Operations Funding | Local | 402.005 |
12.750 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 30.09.03 | 2025 | CTC Operating Assistance | Clermont County | Operations Funding | State | 197.995 |
12.751 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 44.24.00 | 2025 | CTC Transportation Study | Clermont County | Transportation Study | 5307-Urban Formula | 80.000 |
12.751 | Ohio | Clermont | Clermont Transportation Connection | 111956 | 44.24.00 | 2025 | CTC Transportation Study | Clermont County | Transportation Study | Local | 20.000 |
11.255 | Ohio | Clermont | Clermont Transportation Connection | 115456 | 11.12.04 | 2024 | CTC Replacement Vehicles | Clermont County | Replacement vehicles | 5307-Urban Formula | 680.000 |
11.255 | Ohio | Clermont | Clermont Transportation Connection | 115456 | 11.12.04 | 2024 | CTC Replacement Vehicles | Clermont County | Replacement vehicles | State | 234.440 |
11.920 | Ohio | Clermont | Clermont Transportation Connection | 118745 | 11.41.03 | 2024 | CTC Facility Construction Project | Clermont County | Facility Construction | 5307-Urban Formula (TDC Match) | 5.055.027 |
12.165 | Ohio | Clermont | Clermont Transportation Connection | 121315 | 11.13.15 | 2024 | CTC Expansion Vehicle | Clermont County | Expansion Vehicle | Local | 30.000 |
12.165 | Ohio | Clermont | Clermont Transportation Connection | 121315 | 11.13.15 | 2024 | CTC Expansion Vehicle | Clermont County | Expansion Vehicle | Section 5339 | 150.000 |
10.460 | Ohio | Butler | Middletown Transit Service | 104379 | 30.09.03 | 2024 | Middletown Transit Operating | City of Middletown | Operating Assistance | 5307-Urban Formula | 1.200.000 |
10.460 | Ohio | Butler | Middletown Transit Service | 104379 | 30.09.03 | 2024 | Middletown Transit Operating | City of Middletown | Operating Assistance | Local | 975.000 |
10.460 | Ohio | Butler | Middletown Transit Service | 104379 | 30.09.03 | 2024 | Middletown Transit Operating | City of Middletown | Operating Assistance | State | 225.000 |
10.461 | Ohio | Butler | Middletown Transit Service | 104381 | 11.7A.00 | 2024 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | 5307-Urban Formula | 200.000 |
10.461 | Ohio | Butler | Middletown Transit Service | 104381 | 11.7A.00 | 2024 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | Local | 50.000 |
10.462 | Ohio | Butler | Middletown Transit Service | 104382 | 11.7C.00 | 2024 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | 5307-Urban Formula | 80.000 |
10.462 | Ohio | Butler | Middletown Transit Service | 104382 | 11.7C.00 | 2024 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | Local | 20.000 |
11.932 | Ohio | Butler | Middletown Transit Service | 116519 | 44.26.15 | 2024 | MTS Transit Hub Planning | City of Middletown | Transit Hub Planning (TDC Match) | CRP Flex | 125.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2024 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | 5307-Urban Formula | 5.500.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2024 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | Local | 4.968.177 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2024 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | State | 531.824 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2025 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | 5307-Urban Formula | 1.200.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2025 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | Local | 900.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2025 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | State | 300.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2026 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | 5307-Urban Formula | 1.200.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2026 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | Local | 1.200.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2027 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | 5307-Urban Formula | 1.200.000 |
11.376 | Ohio | Butler | Middletown Transit Service | 118298 | 30.09.01 | 2027 | Middletown Transit 24-27 Operating | City of Middletown | Operating Assistance | Local | 1.200.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2024 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | 5307-Urban Formula | 1.000.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2024 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | Local | 250.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2025 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | 5307-Urban Formula | 120.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2025 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | Local | 30.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2026 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | 5307-Urban Formula | 120.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2026 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | Local | 30.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2027 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | 5307-Urban Formula | 120.000 |
11.380 | Ohio | Butler | Middletown Transit Service | 118299 | 11.7C.00 | 2027 | Middletown Transit ADA Asst | City of Middletown | ADA Operating Assistance | Local | 30.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2024 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | 5307-Urban Formula | 1.500.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2024 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | Local | 375.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2025 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | 5307-Urban Formula | 200.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2025 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | Local | 50.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2026 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | 5307-Urban Formula | 200.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2026 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | Local | 50.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2027 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | 5307-Urban Formula | 200.000 |
11.378 | Ohio | Butler | Middletown Transit Service | 118300 | 11.7A.00 | 2027 | Middletown Transit Prev Maint | City of Middletown | Preventive Maintenance | Local | 50.000 |
11.934 | Ohio | Butler | Middletown Transit Service | 120269 | 11.34.02 | 2024 | S24 Middletown Capital Projects | City of Middletown | MTS Facility renovation | 5307-Urban Formula | 400.000 |
11.934 | Ohio | Butler | Middletown Transit Service | 120269 | 11.34.02 | 2024 | S24 Middletown Capital Projects | City of Middletown | MTS Facility renovation | Local | 100.000 |
11.933 | Ohio | Butler | Middletown Transit Service | 120269 | 11.34.07 | 2024 | S24 Middletown Capital Projects | City of Middletown | MTS Access control | 5307-Urban Formula | 75.000 |
11.933 | Ohio | Butler | Middletown Transit Service | 120269 | 11.34.07 | 2024 | S24 Middletown Capital Projects | City of Middletown | MTS Access control | Local | 18.750 |
11.949 | Ohio | Butler | Middletown Transit Service | 120540 | 44.26.13 | 2024 | MTS Transportation Development Plan | City of Middletown | Transportation Development Plan | 5307-Urban Formula | 70.000 |
11.949 | Ohio | Butler | Middletown Transit Service | 120540 | 44.26.13 | 2024 | MTS Transportation Development Plan | City of Middletown | Transportation Development Plan | Local | 14.000 |
11.950 | Ohio | Butler | Middletown Transit Service | 120540 | 44.26.13 | 2024 | NEORide Sm. Urban Coordinator Funding (TDC Match) | City of Middletown | NEORide Sm. Urban Coordinator Funding | 5307-Urban Formula | 1.146.156 |
12.527 | Ohio | Butler | Middletown Transit Service | 122659 | 11.12.04 | 2025 | Middletown Replacement Bus | City of Middletown | Replacement Bus (TDC Match) | Section 5339 | 138.000 |
12.528 | Ohio | Butler | Middletown Transit Service | 122659 | 11.12.04 | 2025 | Middletown Replacement Bus | City of Middletown | Replacement Bus | 5307 - Urban Formula | 60.000 |
12.528 | Ohio | Butler | Middletown Transit Service | 122659 | 11.12.04 | 2025 | Middletown Replacement Bus | City of Middletown | Replacement Bus | Local | 15.000 |
11.904 | Ohio | Hamilton | OKI | 115206 | 11.46.08 | 2024 | OK Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient - Software Leased | 5310 (non-ODOT) | 325.406 |
11.904 | Ohio | Hamilton | OKI | 115206 | 11.46.08 | 2024 | OK Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient - Software Leased | Local | 56.251 |
11.247 | Ohio | Hamilton | OKI | 115206 | 11.7L.00 | 2024 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) OKI Subrecipient - Mobility Management | 5310 (non-ODOT) | 978.081 |
11.247 | Ohio | Hamilton | OKI | 115206 | 11.7L.00 | 2024 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) OKI Subrecipient - Mobility Management | Local | 131.497 |
12.223 | Ohio | Hamilton | OKI | 119540 | 11.12.04 | 2025 | OKI Subrecipient Vehicle | OKI Region | 5310 (non-ODOT) OKI Subrecipient Vehicle | 5310 (non-ODOT) | 345.497 |
12.223 | Ohio | Hamilton | OKI | 119540 | 11.12.04 | 2025 | OKI Subrecipient Vehicle | OKI Region | 5310 (non-ODOT) OKI Subrecipient Vehicle | Local | 121.258 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2025 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | 5310 (non-ODOT) | 100.800 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2025 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | Local | 39.200 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2026 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | 5310 (non-ODOT) | 1.315.487 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2026 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | Local | 328.872 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2027 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | 5310 (non-ODOT) | 1.315.457 |
11.894 | Ohio | Hamilton | OKI | 119540 | 11.12.15 | 2027 | OKI Subrecipient Replacement Vehicles | OKI Region | 5310 (non-ODOT) OKI Subrecipient Replacement Vehicles | Local | 328.872 |
12.224 | Ohio | Hamilton | OKI | 119540 | 11.13.15 | 2025 | OKI Subrecipient Vehicle | OKI Region | 5310 (non-ODOT) OKI Subrecipient Vehicle | 5310 (non-ODOT) | 43.615 |
12.224 | Ohio | Hamilton | OKI | 119540 | 11.13.15 | 2025 | OKI Subrecipient Vehicle | OKI Region | 5310 (non-ODOT) OKI Subrecipient Vehicle | Local | 16.962 |
12.225 | Ohio | Hamilton | OKI | 119540 | 11.42.07 | 2025 | OKI Subrecipient Transportation Server | OKI Region | 5310 (non-ODOT) OKI Subrecipient Transportation Server | 5310 (non-ODOT) | 8.000 |
12.225 | Ohio | Hamilton | OKI | 119540 | 11.42.07 | 2025 | OKI Subrecipient Transportation Server | OKI Region | 5310 (non-ODOT) OKI Subrecipient Transportation Server | Local | 2.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2024 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | 5310 (non-ODOT) | 100.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2024 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | Local | 25.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2025 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | 5310 (non-ODOT) | 100.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2025 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | Local | 25.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2026 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | 5310 (non-ODOT) | 100.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2026 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | Local | 25.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2027 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | 5310 (non-ODOT) | 100.000 |
11.898 | Ohio | Hamilton | OKI | 119540 | 11.42.08 | 2027 | OKI Subrecipient Software | OKI Region | 5310 (non-ODOT) OKI Subrecipient Software | Local | 25.000 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2025 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | 5310 (non-ODOT) | 1.795 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2025 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | Local | 449 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2026 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | 5310 (non-ODOT) | 33.543 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2026 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | Local | 8.386 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2027 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | 5310 (non-ODOT) | 33.543 |
11.896 | Ohio | Hamilton | OKI | 119540 | 11.42.09 | 2027 | OKI Subrecipient Bus Support Equipment | OKI Region | 5310 (non-ODOT) Subrecipient Bus Support Equipment Surveillance | Local | 8.386 |
12.222 | Ohio | Hamilton | OKI | 119540 | 11.46.08 | 2025 | OKI Subrecipient Software | OKI Region | 5310 (non-OD0T) OKI Subrecipient Software | 5310 (non-ODOT) | 156.160 |
12.222 | Ohio | Hamilton | OKI | 119540 | 11.46.08 | 2025 | OKI Subrecipient Software | OKI Region | 5310 (non-OD0T) OKI Subrecipient Software | Local | 39.041 |
12.226 | Ohio | Hamilton | OKI | 119540 | 11.71.13 | 2025 | OKI Subrecipient Third Party Contract for Services | OKI Region | 5310 (non-ODOT) OKI Subrecipient Third Party Contract for Services | 5310 (non-ODOT) | 146.567 |
12.226 | Ohio | Hamilton | OKI | 119540 | 11.71.13 | 2025 | OKI Subrecipient Third Party Contract for Services | OKI Region | 5310 (non-ODOT) OKI Subrecipient Third Party Contract for Services | Local | 56.999 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2025 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | 5310 (non-ODOT) | 225.943 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2025 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | Local | 72.404 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2026 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | 5310 (non-ODOT) | 101.671 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2026 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | Local | 25.418 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2027 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | 5310 (non-ODOT) | 101.671 |
11.897 | Ohio | Hamilton | OKI | 119540 | 11.7A.00 | 2027 | OKI Subrecipient Preventative Maintenance | OKI Region | 5310 (non-ODOT) OKI Subrecipient Preventative Maintenance | Local | 25.418 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2025 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | 5310 (non-ODOT) | 684.021 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2025 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | Local | 221.009 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2026 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | 5310 (non-ODOT) | 400.000 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2026 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | Local | 100.000 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2027 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | 5310 (non-ODOT) | 400.000 |
11.895 | Ohio | Hamilton | OKI | 119540 | 11.7L.00 | 2027 | OKI Subrecipient Mobility Management | OKI Region | 5310 (non-ODOT) Subrecipient Mobility Management | Local | 100.000 |
12.227 | Ohio | Hamilton | OKI | 119540 | 11.80.00 | 2025 | OKI 5310 Program Administration | OKI Region | 5310 (non-ODOT) OKI Program Administration | 5310 (non-ODOT) | 219.217 |
11.893 | Ohio | Hamilton | OKI | 119540 | 44.26.12 | 2026 | OKI 5310 Oversight | OKI Region | Coordination of Non-Emergency Human Service Transportation | 5310 (non-ODOT) | 216.745 |
11.893 | Ohio | Hamilton | OKI | 119540 | 44.26.12 | 2027 | OKI 5310 Oversight | OKI Region | Coordination of Non-Emergency Human Service Transportation | 5310 (non-ODOT) | 216.745 |
6.556 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 109079 | 11.43.03 | 2026 | HAM Uptown Smart Hub | Within an area bounded by Reading Road (US 42), Whitter Avenue, I-71 and MLK Drive | Multi-modal transportation facility with fixed route bus and institutional shuttles. Includes park and ride and connection to bike/ped facilities | Local | 1.655.159 |
6.556 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 109079 | 11.43.03 | 2026 | HAM Uptown Smart Hub | Within an area bounded by Reading Road (US 42), Whitter Avenue, I-71 and MLK Drive | Multi-modal transportation facility with fixed route bus and institutional shuttles. Includes park and ride and connection to bike/ped facilities | OKI-CMAQ | 6.600.000 |
11.398 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112049 | 11.76.91 | 2024 | SORTA Walnut Hills Transit Center | Hamilton County | FY23 Walnut Hills Land Acquisition | Federal Flex Funds (CRP) | 437.546 |
11.398 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112049 | 11.76.91 | 2024 | SORTA Walnut Hills Transit Center | Hamilton County | FY23 Walnut Hills Land Acquisition | Local | 87.501 |
10.442 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112054 | 11.12.01 | 2024 | SORTA 2023 Bus Replacements 5339 | Hamilton County | SORTA Bus Replacements 5339 | 5339-Bus & Bus Facilities | 729.781 |
10.442 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112054 | 11.12.01 | 2024 | SORTA 2023 Bus Replacements 5339 | Hamilton County | SORTA Bus Replacements 5339 | Local | 146.350 |
10.443 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112055 | 11.12.04 | 2024 | SORTA 2023 Vehicle Replacements | Hamilton County | Vehicle Replacements | 5339 (Non-ODOT) | 875.000 |
10.443 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112055 | 11.12.04 | 2024 | SORTA 2023 Vehicle Replacements | Hamilton County | Vehicle Replacements | Local | 219.400 |
10.444 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112056 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus Replacements | 5339 - Bus & Bus Facil | 4.000.000 |
10.444 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112056 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus Replacements | Local | 1.000.000 |
10.445 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112058 | 11.7A.00 | 2024 | SORTA 2023 Facility Preventive Maintenance | Hamilton County | Govt. Square Transit Center Refurbishment | 5337 | 17.789 |
10.445 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112058 | 11.7A.00 | 2024 | SORTA 2023 Facility Preventive Maintenance | Hamilton County | Govt. Square Transit Center Refurbishment | Local | 3.750 |
10.446 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112059 | 30.09.01 | 2024 | SORTA 2024 Operating | Hamilton County | Operating | Local | 77.704.288 |
10.447 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112060 | 11.7A.00 | 2025 | SORTA Preventive Maintenance | Hamilton County | Preventative Maintenance | 5307-Urban Formula | 17.076.046 |
10.447 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112060 | 11.7A.00 | 2025 | SORTA Preventive Maintenance | Hamilton County | Preventative Maintenance | Local | 4.269.012 |
10.449 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112064 | 11.7C.00 | 2025 | SORTA ADA Paratransit Service | Hamilton County | Access Paratransit Service | 5307-Urban Formula | 1.918.657 |
10.449 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112064 | 11.7C.00 | 2025 | SORTA ADA Paratransit Service | Hamilton County | Access Paratransit Service | Local | 479.664 |
10.429 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112071 | 11.12.01 | 2024 | SORTA 5339C-LowNo Hybrid Buses | Hamilton County | Bus Replacements (40' buses) | 5339c - Bus & Bus Facil | 9.816.000 |
11.266 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112071 | 11.32.20 | 2024 | SORTA 5339A 2022-Electric Infrastructure | Hamilton County | Electric Charging Stations | 5339-Bus & Bus Facilities | 263.120 |
11.266 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112071 | 11.32.20 | 2024 | SORTA 5339A 2022-Electric Infrastructure | Hamilton County | Electric Charging Stations | Local | 65.780 |
11.265 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112071 | 11.34.02 | 2024 | SORTA 5339A 2022-Electric Infrastructure | Hamilton County | Electric Infrastructure: Design & Construction | 5339-Bus & Bus Facilities | 55.840 |
11.265 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112071 | 11.34.02 | 2024 | SORTA 5339A 2022-Electric Infrastructure | Hamilton County | Electric Infrastructure: Design & Construction | Local | 13.960 |
10.437 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112072 | 30.09.01 | 2024 | SORTA 2024 Operating | Hamilton County | SORTA 2024 Operating | Local | 1.720.000 |
11.952 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112074 | 30.09.01 | 2024 | SORTA 2023 Operating Assistance | Hamilton County | SORTA 2023 Operating Assistance | Local | 77.704.288 |
10.440 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112076 | 11.12.01 | 2024 | SORTA 2024 Bus Replacements FFT | Hamilton County | Bus Replacements | Federal Flex (DERG) | 1.560.000 |
10.440 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112076 | 11.12.01 | 2024 | SORTA 2024 Bus Replacements FFT | Hamilton County | Bus Replacements | Local | 1.040.000 |
10.455 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112078 | 11.42.09 | 2025 | SORTA Security Equipment | Hamilton County | Security Equipment | 5307-Urban Formula | 191.866 |
10.455 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112078 | 11.42.09 | 2025 | SORTA Security Equipment | Hamilton County | Security Equipment | Local | 47.967 |
10.434 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112079 | 11.7C.00 | 2024 | SORTA ADA Paratransit Service | Hamilton County | Access Paratransit Service | 5307-Urban Formula | 1.025.367 |
10.434 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112079 | 11.7C.00 | 2024 | SORTA ADA Paratransit Service | Hamilton County | Access Paratransit Service | Local | 256.342 |
10.456 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112080 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus Replacements | 5339-Bus & Bus Facilities | 900.000 |
10.456 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112080 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus Replacements | Local | 225.000 |
10.457 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112084 | 11.12.04 | 2024 | SORTA 2024 Bus Replacements | Hamilton County | Bus Replacements - Paratransit | 5339-Bus & Bus Facilities | 600.000 |
10.457 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112084 | 11.12.04 | 2024 | SORTA 2024 Bus Replacements | Hamilton County | Bus Replacements - Paratransit | Local | 150.000 |
10.458 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112086 | 11.12.01 | 2024 | SORTA 2024 Bus Replacements | Hamilton County | Bus Replacements - 40 foot bus | 5339-Bus & Bus Facilities | 10.000.000 |
10.458 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112086 | 11.12.01 | 2024 | SORTA 2024 Bus Replacements | Hamilton County | Bus Replacements - 40 foot bus | Local | 2.500.000 |
10.459 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112089 | 11.7A.00 | 2024 | SORTA Facility Preventive Maintenance | Hamilton County | Govt. Square Transit Center Refurbishment | 5337 | 15.000 |
10.459 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112089 | 11.7A.00 | 2024 | SORTA Facility Preventive Maintenance | Hamilton County | Govt. Square Transit Center Refurbishment | Local | 3.750 |
11.923 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112095 | 11.12.01 | 2024 | BRT Buses - Reading and Hamilton Corridors | Hamilton County | BRT Buses for Reading Rd and Hamilton Av Corridors | Local | 50.000.000 |
11.924 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112095 | 13.21.01 | 2024 | BRT Buses - Reading and Hamilton Corridors | Hamilton County | BRT Buses for Reading Rd and Hamilton Av Corridors | Local | 40.000.000 |
11.925 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 112095 | 13.23.01 | 2024 | BRT Routes - Construction | Hamilton County | BRT Routes Construction | Local | 210.000.000 |
10.069 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 114348 | 11.12.01 | 2024 | SORTA OKI Bus Replacement FY 24 | Hamilton County | Replacement of 15 10' buses with clean diesel technology buses | Local | 2.509.155 |
10.069 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 114348 | 11.12.01 | 2024 | SORTA OKI Bus Replacement FY 24 | Hamilton County | Replacement of 15 10' buses with clean diesel technology buses | OKI-CMAQ | 5.854.695 |
11.152 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115246 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus and Bus Facilities-1 Bus Replacement FFY2020 | 5339 - Bus & Bus Facil | 795.095 |
11.152 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115246 | 11.12.01 | 2024 | SORTA Bus Replacements | Hamilton County | Bus and Bus Facilities-1 Bus Replacement FFY2020 | Loca | 198.774 |
11.153 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115246 | 11.12.04 | 2024 | SORTA Bus Replacements | Hamilton County | Bus and Bus Facilities--14 <30' Paratransit Bus Replacement FFY2020 | 5339 - Bus & Bus Facil | 1.620.175 |
11.153 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115246 | 11.12.04 | 2024 | SORTA Bus Replacements | Hamilton County | Bus and Bus Facilities--14 <30' Paratransit Bus Replacement FFY2020 | Local | 405.044 |
11.183 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115941 | 11.12.01 | 2025 | SORTA OKI Bus Replacements FY25 | Hamilton County | Bus replacements for SORTA through OKI's CMAQ program for SFY25 | Local | 2.495.568 |
11.183 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115941 | 11.12.01 | 2025 | SORTA OKI Bus Replacements FY25 | Hamilton County | Bus replacements for SORTA through OKI's CMAQ program for SFY25 | OKI-CMAQ | 5.822.993 |
11.184 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115942 | 11.33.03 | 2026 | SORTA North College Hill Transit Center | Along Goodman Av. And Galbraith Rd. | SORTA's North College Hill Transit Center construction project through OKI's CMAQ program for SFY25 | Local | 1.513.336 |
11.184 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 115942 | 11.33.03 | 2026 | SORTA North College Hill Transit Center | Along Goodman Av. And Galbraith Rd. | SORTA's North College Hill Transit Center construction project through OKI's CMAQ program for SFY25 | OKI-CMAQ | 3.531.118 |
11.232 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 116549 | 11.31.04 | 2024 | SORTA Walnut Hills Transit Center | Hamilton County | Walnut Hills Transit Center Construction (funding from Colerain P&R Award-2014 STP and Areas of Persistent Poverty Program) | 5307-AoPP | 341.550 |
11.232 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 116549 | 11.31.04 | 2024 | SORTA Walnut Hills Transit Center | Hamilton County | Walnut Hills Transit Center Construction (funding from Colerain P&R Award-2014 STP and Areas of Persistent Poverty Program) | Local | 38.160 |
11.168 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117303 | 11.42.20 | 2024 | SORTA Management Systems Upgrade | Hamilton County | Procurement and Asset Management System | 5307-Urban Formula | 2.370.723 |
11.168 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117303 | 11.42.20 | 2024 | SORTA Management Systems Upgrade | Hamilton County | Procurement and Asset Management System | Local | 592.681 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | 5339 (Non-ODOT) | 150.000 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | Federal Discretionary | 4.300.000 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | Federal Flex Transfer (ODOT) | 700.000 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | Local | 30.000 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | Local | 150.000 |
11.267 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 117304 | 11.33.10 | 2024 | SORTA Bus Stop Enhancements | Hamilton County | Bus Stop Enhancements | Local | 750.000 |
11.821 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118362 | 11.12.01 | 2024 | SORTA 2024 Bus Replacement DERG | Hamilton County | 2023 DERG Bus Replacements-40' | Federal Flex (CMAQ) | 2.498.453 |
11.821 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118362 | 11.12.01 | 2024 | SORTA 2024 Bus Replacement DERG | Hamilton County | 2023 DERG Bus Replacements-40' | Local | 1.287.082 |
11.822 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118363 | 30.09.01 | 2025 | SORTA 2025 Operating | Hamilton County | Operating | Local | 77.704.288 |
11.823 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118364 | 11.7A.00 | 0 | SORTA 2025 Preventative Maintenance UTP | Hamilton County | Preventative Maintenance UTP | State | 2.000.000 |
11.824 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118365 | 11.7C.00 | 2025 | SORTA 2025 ADA Paratransit | Hamilton County | ADA Paratransit | 5307-Urban Formula | 1.918.657 |
11.824 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118365 | 11.7C.00 | 2025 | SORTA 2025 ADA Paratransit | Hamilton County | ADA Paratransit | Local | 479.664 |
11.825 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118368 | 11.7A.00 | 2025 | SORTA 2025 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | 5307-Urban Formula | 17.076.046 |
11.825 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118368 | 11.7A.00 | 2025 | SORTA 2025 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | Local | 4.269.011 |
12.169 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.33.09 | 2025 | SORTA Real-time E-Paper Signs | Hamilton County | Real-time E-Paper Signs | Local | 337.500 |
12.169 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.33.09 | 2025 | SORTA Real-time E-Paper Signs | Hamilton County | Real-time E-Paper Signs | STBG | 1.350.000 |
11.826 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.09 | 2025 | SORTA 2025 Security Equipment | Hamilton County | Security Equipment | 5307-Urban Formula | 191.866 |
11.826 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.09 | 2025 | SORTA 2025 Security Equipment | Hamilton County | Security Equipment | Local | 47.967 |
11.826 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.09 | 2025 | SORTA 2025 Security Equipment | Hamilton County | Security Equipment | Local | 80.000 |
11.826 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.09 | 2025 | SORTA 2025 Security Equipment | Hamilton County | Security Equipment | STBG | 200.000 |
12.168 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.20 | 2025 | SORTA On-Location Handheld Data Collection | Hamilton County | On-Location Handheld Data Collection | Local | 40.000 |
12.168 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118369 | 11.42.20 | 2025 | SORTA On-Location Handheld Data Collection | Hamilton County | On-Location Handheld Data Collection | STBG | 160.000 |
11.827 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118370 | 11.12.01 | 2025 | SORTA 2026 Bus Replacement DERG | Hamilton County | Bus Replacement with 40' Fixed Route Hybrid Buses | Federal Flex (DERG) | 4.886.708 |
11.827 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118370 | 11.12.01 | 2025 | SORTA 2026 Bus Replacement DERG | Hamilton County | Bus Replacement with 40' Fixed Route Hybrid Buses | Local | 3.108.268 |
11.828 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118371 | 11.12.01 | 2025 | SORTA 2025 Bus Replacement 5339 | Hamilton County | Bus Replacement | 5339-Bus & Bus Facilities | 900.000 |
11.828 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118371 | 11.12.01 | 2025 | SORTA 2025 Bus Replacement 5339 | Hamilton County | Bus Replacement | Local | 225.000 |
11.829 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118372 | 11.12.04 | 2025 | SORTA 2025 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | 5339 (Non-ODOT) | 600.000 |
11.829 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118372 | 11.12.04 | 2025 | SORTA 2025 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | Local | 150.000 |
11.404 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118373 | 11.12.01 | 2025 | SORTA Bus Replacements | Hamilton County | Bus Replacements-40' | 5339-Bus & Bus Facilities | 10.000.000 |
11.404 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118373 | 11.12.01 | 2025 | SORTA Bus Replacements | Hamilton County | Bus Replacements-40' | Local | 2.500.000 |
11.830 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118374 | 11.7A.00 | 2025 | SORTA 2025 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | 5337 | 37.376 |
11.830 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118374 | 11.7A.00 | 2025 | SORTA 2025 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | Local | 9.344 |
11.831 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118376 | 30.09.01 | 2026 | SORTA 2026 Operating | Hamilton County | Operating | Local | 77.704.288 |
11.832 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118377 | 11.7A.00 | 2026 | SORTA 2026 Preventative Maintenance UTP | Hamilton County | Preventative Maintenance UTP | State | 2.000.000 |
11.833 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118378 | 11.7C.00 | 2026 | SORTA 2026 ADA Paratransit | Hamilton County | ADA Paratransit | 5307-Urban Formula | 1.522.875 |
11.833 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118378 | 11.7C.00 | 2026 | SORTA 2026 ADA Paratransit | Hamilton County | ADA Paratransit | Local | 380.719 |
11.834 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118379 | 11.42.09 | 2026 | SORTA 2026 Security Equipment | Hamilton County | Security Equipment | 5307-Urban Formula | 271.250 |
11.834 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118379 | 11.42.09 | 2026 | SORTA 2026 Security Equipment | Hamilton County | Security Equipment | Local | 67.813 |
11.835 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118380 | 11.7A.00 | 2026 | SORTA 2026 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | 5307-Urban Formula | 13.705.875 |
11.835 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118380 | 11.7A.00 | 2026 | SORTA 2026 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | Local | 3.426.469 |
11.836 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118381 | 11.12.01 | 2026 | SORTA 2026 Bus Replacement DERG | Hamilton County | Bus Replacement | Federal Flex (DERG) | 768.800 |
11.836 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118381 | 11.12.01 | 2026 | SORTA 2026 Bus Replacement DERG | Hamilton County | Bus Replacement | Local | 192.200 |
11.837 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118382 | 11.12.01 | 2026 | SORTA 2026 Bus Replacement 5339 | Hamilton County | Bus Replacement | 5339 (Non-ODOT) | 900.000 |
11.837 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118382 | 11.12.01 | 2026 | SORTA 2026 Bus Replacement 5339 | Hamilton County | Bus Replacement | Local | 225.000 |
11.838 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118383 | 11.12.04 | 2026 | SORTA 2026 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | 5339 (Non-ODOT) | 600.000 |
11.838 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118383 | 11.12.04 | 2026 | SORTA 2026 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | Local | 150.000 |
11.839 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118384 | 11.12.01 | 2026 | SORTA 2026 40' Bus Replacement 5339b | Hamilton County | Bus Replacement | 5339 (Non-ODOT) | 10.000.000 |
11.839 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118384 | 11.12.01 | 2026 | SORTA 2026 40' Bus Replacement 5339b | Hamilton County | Bus Replacement | Local | 2.500.000 |
11.840 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118385 | 11.7A.00 | 2026 | SORTA 2026 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | 5337 | 15.000 |
11.840 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118385 | 11.7A.00 | 2026 | SORTA 2026 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | Local | 3.750 |
11.447 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118386 | 11.33.03 | 2027 | SORTA Bond Hill Garage Construction/Renovation | Hamilton County | Construction/ renovation of Bond Hill Garage | Local | 3.428.571 |
11.447 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118386 | 11.33.03 | 2027 | SORTA Bond Hill Garage Construction/Renovation | Hamilton County | Construction/ renovation of Bond Hill Garage | OKI-STBG | 8.000.000 |
11.448 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118387 | 11.12.01 | 2026 | SORTA OKI Bus Replacements FY26 | Hamilton County | Replacement of 6 diesel buses with new 40' electric buses; associated charging equipment. | Local | 2.715.562 |
11.448 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118387 | 11.12.01 | 2026 | SORTA OKI Bus Replacements FY26 | Hamilton County | Replacement of 6 diesel buses with new 40' electric buses; associated charging equipment. | OKI-CMAQ | 6.336.311 |
11.841 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118389 | 30.09.01 | 2027 | SORTA 2027 Operating | Hamilton County | Operating | Local | 77.704.288 |
11.842 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118390 | 11.7A.00 | 2027 | SORTA 2027 Preventative Maintenance UTP | Hamilton County | Preventative Maintenance UTP | State | 2.000.000 |
11.843 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118391 | 11.7C.00 | 2027 | SORTA 2027 ADA Paratransit | Hamilton County | ADA Paratransit | 5307-Urban Formula | 1.522.875 |
11.843 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118391 | 11.7C.00 | 2027 | SORTA 2027 ADA Paratransit | Hamilton County | ADA Paratransit | Local | 380.719 |
11.844 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118392 | 11.42.09 | 2027 | SORTA 2027 Security Equipment | Hamilton County | Security Equipment | 5307-Urban Formula | 271.250 |
11.844 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118392 | 11.42.09 | 2027 | SORTA 2027 Security Equipment | Hamilton County | Security Equipment | Local | 67.813 |
11.845 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118393 | 11.7A.00 | 2027 | SORTA 2027 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | 5307-Urban Formula | 13.705.875 |
11.845 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118393 | 11.7A.00 | 2027 | SORTA 2027 Prev Maintenance 5307 | Hamilton County | Preventative Maintenance 5307 | Local | 3.426.469 |
11.846 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118394 | 11.12.01 | 2027 | SORTA 2027 Bus Replacement DERG | Hamilton County | Bus Replacement | Federal Flex (DERG) | 768.800 |
11.846 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118394 | 11.12.01 | 2027 | SORTA 2027 Bus Replacement DERG | Hamilton County | Bus Replacement | Local | 192.200 |
11.847 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118395 | 11.12.01 | 2027 | SORTA 2027 Bus Replacement 5339 | Hamilton County | Bus Replacement | 5339 (Non-ODOT) | 900.000 |
11.847 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118395 | 11.12.01 | 2027 | SORTA 2027 Bus Replacement 5339 | Hamilton County | Bus Replacement | Local | 225.000 |
11.848 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118396 | 11.12.04 | 2027 | SORTA 2027 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | 5339 (Non-ODOT) | 600.000 |
11.848 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118396 | 11.12.04 | 2027 | SORTA 2027 Para Bus Replacement 5339 | Hamilton County | Paratransit Bus Replacement | Local | 150.000 |
11.849 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118397 | 11.12.01 | 2027 | SORTA 2027 40' Bus Replacement 5339b | Hamilton County | Bus Replacement | 5339 (Non-ODOT) | 10.000.000 |
11.849 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118397 | 11.12.01 | 2027 | SORTA 2027 40' Bus Replacement 5339b | Hamilton County | Bus Replacement | Local | 2.500.000 |
11.850 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118398 | 11.7A.00 | 2027 | SORTA 2027 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | 5337 | 15.000 |
11.850 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 118398 | 11.7A.00 | 2027 | SORTA 2027 Facility Preventative Maintenance 5337 | Hamilton County | Facility Preventative Maintenance | Local | 3.750 |
11.926 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120030 | 11.12.01 | 2024 | Bus Replacements | Hamilton County | Bus Replacements - LowNo Hybrid Buses | Discretionary | 9.806.428 |
11.926 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120030 | 11.12.01 | 2024 | Bus Replacements | Hamilton County | Bus Replacements - LowNo Hybrid Buses | Local | 4.303.541 |
11.931 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120092 | 11.71.11 | 2024 | SORTA On-Board Survey | Hamilton County | Customer On-board Survey for Environmental Justice Title VI and growing ridership base | 5307-AoPP | 363.545 |
11.931 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120092 | 11.71.11 | 2024 | SORTA On-Board Survey | Hamilton County | Customer On-board Survey for Environmental Justice Title VI and growing ridership base | Local | 91.455 |
12.152 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120661 | 11.13.04 | 2024 | SORTA MetroNow | Hamilton County | SORTA MetroNow | Federal Flex (ODOT) | 672.000 |
12.152 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120661 | 11.13.04 | 2024 | SORTA MetroNow | Hamilton County | SORTA MetroNow | Local | 336.000 |
11.954 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120725 | 11.12.01 | 2027 | SORTA Battery Electric Buses for BRT | Hamilton County | New battery electric buses for use on BRT corridors | Local | 3.428.571 |
11.954 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 120725 | 11.12.01 | 2027 | SORTA Battery Electric Buses for BRT | Hamilton County | New battery electric buses for use on BRT corridors | OKI-STBG | 8.000.000 |
12.166 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 121221 | 44.22.00 | 2024 | SORTA Long Range Transportation Plan | Hamilton County | Planning project(s) for SORTA. Includes SFY24 OWMP flex award from ODOT-Transit | Local | 121.280 |
12.166 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 121221 | 44.22.00 | 2024 | SORTA Long Range Transportation Plan | Hamilton County | Planning project(s) for SORTA. Includes SFY24 OWMP flex award from ODOT-Transit | STBG | 485.120 |
12.549 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.12.01 | 2025 | SORTA 40' Bus Replacements | Hamilton County | 40' Fixed Route Hybrid Buses | Federal-STBG Flex (ODOT) | 2.277.600 |
12.549 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.12.01 | 2025 | SORTA 40' Bus Replacements | Hamilton County | 40' Fixed Route Hybrid Buses | Local | 569.400 |
12.550 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.13.04 | 2025 | SORTA MetroNow Vehicles | Hamilton County | MetroNow Vehicles | Federal-STBG Flex (ODOT) | 1.092.000 |
12.550 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.13.04 | 2025 | SORTA MetroNow Vehicles | Hamilton County | MetroNow Vehicles | Local | 273.000 |
12.547 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.33.10 | 2025 | SORTA One Seat Ride Paratransit Equipment | Hamilton County | Paratransit Equipment | Federal-STBG Flex (ODOT) | 381.584 |
12.547 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.33.10 | 2025 | SORTA One Seat Ride Paratransit Equipment | Hamilton County | Paratransit Equipment | Local | 95.396 |
12.548 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.7C.00 | 2025 | SORTA One Seat Ride Paratransit Operatations | Hamilton County | Paratransit Operations | Federal-STBG Flex (ODOT) | 326.052 |
12.548 | Ohio | Hamilton | Southwest Ohio Regional Transit Authority | 122906 | 11.7C.00 | 2025 | SORTA One Seat Ride Paratransit Operatations | Hamilton County | Paratransit Operations | Local | 326.052 |
12.173 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.04 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | 5307-Urban Formula | 204.800 |
12.173 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.04 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | Local | 2.000 |
12.173 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.04 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | State | 49.200 |
10.758 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | 5307-Urban Formula | 36.000 |
10.758 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | Local | 1.000 |
10.758 | Ohio | Warren | Warren County Transit Service | 111793 | 11.12.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | State | 8.000 |
12.172 | Ohio | Warren | Warren County Transit Service | 111793 | 11.13.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | 5307-Urban Formula | 72.000 |
12.172 | Ohio | Warren | Warren County Transit Service | 111793 | 11.13.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | Local | 2.000 |
12.172 | Ohio | Warren | Warren County Transit Service | 111793 | 11.13.15 | 2024 | WCTS 2024 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | State | 16.000 |
10.771 | Ohio | Warren | Warren County Transit Service | 111793 | 11.7A.00 | 2024 | WCTS 2024 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | 5307-Urban Formula | 99.460 |
10.771 | Ohio | Warren | Warren County Transit Service | 111793 | 11.7A.00 | 2024 | WCTS 2024 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | Local | 24.865 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2024 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 441.295 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2024 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 100.000 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2024 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 370.220 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2025 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 599.663 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2025 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 455.137 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2025 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 144.526 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2026 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 629.647 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2026 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 477.894 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2026 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 151.753 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2027 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 661.129 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2027 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 501.789 |
10.760 | Ohio | Warren | Warren County Transit Service | 111793 | 30.09.01 | 2027 | WCTS 2024 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 159.340 |
11.803 | Ohio | Warren | Warren County Transit Service | 118346 | 11.12.15 | 2025 | WCTS 2025 5307 Program | Warren County | Replacement vans | 5307-Urban Formula | 253.431 |
11.803 | Ohio | Warren | Warren County Transit Service | 118346 | 11.12.15 | 2025 | WCTS 2025 5307 Program | Warren County | Replacement vans | Local | 63.365 |
11.806 | Ohio | Warren | Warren County Transit Service | 118346 | 11.7A.00 | 2025 | WCTS 2025 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | 5307-Urban Formula | 104.433 |
11.806 | Ohio | Warren | Warren County Transit Service | 118346 | 11.7A.00 | 2025 | WCTS 2025 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | Local | 26.108 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2025 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 375.161 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2025 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 539.376 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2025 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 284.463 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2026 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 629.647 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2026 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 477.894 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2026 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 151.753 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2027 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | 5307-Urban Formula | 661.129 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2027 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | Local | 501.789 |
11.809 | Ohio | Warren | Warren County Transit Service | 118346 | 30.09.03 | 2027 | WCTS 2025 5307 Program | Warren County | Operating Assistance up to 50% Federal Share | State | 153.340 |
11.804 | Ohio | Warren | Warren County Transit Service | 118348 | 11.12.15 | 2026 | WCTS 2026 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | 5307-Urban Formula | 263.760 |
11.804 | Ohio | Warren | Warren County Transit Service | 118348 | 11.12.15 | 2026 | WCTS 2026 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | Local | 65.940 |
11.807 | Ohio | Warren | Warren County Transit Service | 118348 | 11.7A.00 | 2026 | WCTS 2026 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | 5307-Urban Formula | 109.655 |
11.807 | Ohio | Warren | Warren County Transit Service | 118348 | 11.7A.00 | 2026 | WCTS 2026 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | Local | 27.414 |
11.805 | Ohio | Warren | Warren County Transit Service | 118349 | 11.12.15 | 2027 | WCTS 2027 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | 5307-Urban Formula | 136.984 |
11.805 | Ohio | Warren | Warren County Transit Service | 118349 | 11.12.15 | 2027 | WCTS 2027 5307 Program | Warren County | Operating assistance, vehicle replacement, and preventive maintenance | Local | 34.246 |
11.808 | Ohio | Warren | Warren County Transit Service | 118349 | 11.7A.00 | 2027 | WCTS 2027 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | 5307-Urban Formula | 115.137 |
11.808 | Ohio | Warren | Warren County Transit Service | 118349 | 11.7A.00 | 2027 | WCTS 2027 5307 Program | Warren County | Other Capital Items (Bus - Preventive Maintenance) | Local | 28.784 |
10.368 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202401 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel Hybrid buses (TFY24-010) | 5307-Urban Formula | 1.385.082 |
10.368 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202401 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel Hybrid buses (TFY24-010) | KYTC Match/TDC | 173.135 |
10.368 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202401 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel Hybrid buses (TFY24-010) | Local | 173.135 |
10.369 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202402 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | 5307-Urban Formula | 1.211.133 |
10.369 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202402 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | KYTC Match/TDC | 151.392 |
10.369 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202402 | 11.12.01 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | Local | 151.392 |
10.371 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202403 | 11.12.04 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | <30' Cutaway buses (RAMP) | KYTC Match/TDC | 9.729 |
10.371 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202403 | 11.12.04 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | <30' Cutaway buses (RAMP) | Local | 9.729 |
10.371 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202403 | 11.12.04 | 2024 | TANK FY24 Bus Purchase | Boone, Campbell and Kenton | <30' Cutaway buses (RAMP) | Section 5339 | 77.830 |
11.870 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202405 | 11.42.11 | 2024 | FY24 Suport Vehicles | Boone, Campbell and Kenton | Support Vehicles | 5307-Urban Formula | 116.013 |
11.870 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202405 | 11.42.11 | 2024 | FY24 Suport Vehicles | Boone, Campbell and Kenton | Support Vehicles | KYTC Match/TDC | 14.501 |
11.870 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202405 | 11.42.11 | 2024 | FY24 Suport Vehicles | Boone, Campbell and Kenton | Support Vehicles | Local | 14.501 |
10.375 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202411 | 11.7A.00 | 2024 | FY24 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | 5307-Urban Formula | 2.880.000 |
10.375 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202411 | 11.7A.00 | 2024 | FY24 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | KYTC Match/TDC | 360.000 |
10.375 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202411 | 11.7A.00 | 2024 | FY24 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | Local | 360.000 |
10.378 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202414 | 11.42.07 | 2024 | FY24 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | CRSSAA | 4.240.500 |
11.869 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202416 | 11.32.07 | 2024 | FY24 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | 5307-Urban Formula | 28.382 |
11.869 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202416 | 11.32.07 | 2024 | FY24 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | KYTC Match/TDC | 3.548 |
11.869 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202416 | 11.32.07 | 2024 | FY24 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | Local | 3.548 |
10.383 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202420 | 30.09.00 | 2024 | FY24 Operating | Boone, Campbell and Kenton | Operating | Local/Other | 21.983.988 |
11.402 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202421 | 11.12.01 | 2024 | TANK FY24 40' Diesel Replacment Buses | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | KYTC Match/TDC | 223.193 |
11.402 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202421 | 11.12.01 | 2024 | TANK FY24 40' Diesel Replacment Buses | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | Local | 223.193 |
11.402 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202421 | 11.12.01 | 2024 | TANK FY24 40' Diesel Replacment Buses | Boone, Campbell and Kenton | 40' Diesel buses (TFY24-020) | OKI-SNK | 1.785.544 |
11.872 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202501 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Diesel Hybrid Buses (TFY25-010) | CMAQ | 2.836.089 |
11.872 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202501 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Diesel Hybrid Buses (TFY25-010) | KYTC Match | 709.023 |
11.401 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202502 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Hybrid Buses (TFY25-10) | KYTC Match | 547.916 |
11.401 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202502 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Hybrid Buses (TFY25-10) | OKI-SNK | 2.191.658 |
11.871 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202504 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Diesel Buses (TFY25-20) | 5307-Urban Formula | 928.198 |
11.871 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202504 | 11.12.01 | 2025 | FY25 Bus Replacements | Boone, Campbell and Kenton | 40' Diesel Buses (TFY25-20) | KYTC Match | 232.050 |
12.170 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202515 | 11.42.11 | 2025 | FY25 Vehicle Replacement | Boone, Campbell, and Kenton counties | Replacement Supervisor Vehicles | 5307-Urban Formula | 11.666 |
12.170 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202515 | 11.42.11 | 2025 | FY25 Vehicle Replacement | Boone, Campbell, and Kenton counties | Replacement Supervisor Vehicles | KYTC Match | 2.917 |
11.875 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202516 | 11.32.07 | 2025 | FY25 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | 5307-Urban Formula | 73.330 |
11.875 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202516 | 11.32.07 | 2025 | FY25 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | KYTC Match/TDC | 18.333 |
11.878 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202520 | 30.09.00 | 2025 | FY25 Operating | Boone, Campbell and Kenton | Operating | Local | 24.000.000 |
12.228 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202521 | 30.09.01 | 2025 | OKI 5310 TANK Operating Assistance | Boone, Campbell and Kenton | 5310 TANK Operating Assistance | 5310 (non ODOT) | 225.000 |
12.228 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202521 | 30.09.01 | 2025 | OKI 5310 TANK Operating Assistance | Boone, Campbell and Kenton | 5310 TANK Operating Assistance | Local | 275.000 |
12.702 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202522 | 11.12.01 | 2025 | TANK Bus Replacements LoNo | Boone, Campbell, and Kenton counties | Bus Replacement with 6 full-size hybrid electric buses | Section 5339 LoNo | 3.091.200 |
12.702 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202522 | 11.12.01 | 2025 | TANK Bus Replacements LoNo | Boone, Campbell, and Kenton counties | Bus Replacement with 6 full-size hybrid electric buses | State | 772.800 |
11.433 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202601 | 11.12.04 | 2026 | FY26 Replacement of Demand-Response Buses | Boone, Campbell and Kenton | Replacement of Six Demand-Response Buses | Local | 188.690 |
11.433 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202601 | 11.12.04 | 2026 | FY26 Replacement of Demand-Response Buses | Boone, Campbell and Kenton | Replacement of Six Demand-Response Buses | OKI-SNK | 754.761 |
11.879 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202602 | 11.12.01 | 2026 | FY26 Bus Replacements | Boone, Campbell and Kenton | Replacement of ten 40' buses | 5307-Urban Formula | 4.960.000 |
11.879 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202602 | 11.12.01 | 2026 | FY26 Bus Replacements | Boone, Campbell and Kenton | Replacement of ten 40' buses | KYTC Match/TDC | 620.000 |
11.879 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202602 | 11.12.01 | 2026 | FY26 Bus Replacements | Boone, Campbell and Kenton | Replacement of ten 40' buses | Local | 620.000 |
11.881 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202611 | 11.7A.00 | 2026 | FY26 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | 5307-Urban Formula | 3.200.000 |
11.881 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202611 | 11.7A.00 | 2026 | FY26 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | Local | 800.000 |
11.883 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202614 | 11.42.07 | 2026 | FY26 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | 5307-Urban Formula | 240.000 |
11.883 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202614 | 11.42.07 | 2026 | FY26 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | KYTC Match/TDC | 30.000 |
11.883 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202614 | 11.42.07 | 2026 | FY26 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | Local/Other | 30.000 |
11.882 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202616 | 11.32.07 | 2026 | FY26 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | 5307-Urban Formula | 60.000 |
11.882 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202616 | 11.32.07 | 2026 | FY26 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | KYTC Match/TDC | 7.500 |
11.882 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202616 | 11.32.07 | 2026 | FY26 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | Local | 7.500 |
11.884 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202620 | 30.09.00 | 2026 | FY26 Operating | Boone, Campbell and Kenton | Operating | Local/Other | 26.000.000 |
11.885 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202701 | 11.12.01 | 2027 | FY27 Bus Replacements | Boone, Campbell and Kenton | Replacement of ten 40' buses | 5307-Urban Formula | 5.000.000 |
11.885 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202701 | 11.12.01 | 2027 | FY27 Bus Replacements | Boone, Campbell and Kenton | Replacement of ten 40' buses | Local | 1.250.000 |
11.887 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202711 | 11.7A.00 | 2027 | FY27 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | 5307-Urban Formula | 3.040.000 |
11.887 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202711 | 11.7A.00 | 2027 | FY27 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | KYTC Match/TDC | 380.000 |
11.887 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202711 | 11.7A.00 | 2027 | FY27 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | Local | 380.000 |
11.889 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202714 | 11.42.07 | 2027 | FY27 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | 5307-Urban Formula | 240.000 |
11.889 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202714 | 11.42.07 | 2027 | FY27 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | KYTC Match/TDC | 30.000 |
11.889 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202714 | 11.42.07 | 2027 | FY27 ADP Hardware | Boone, Campbell and Kenton | ADP Hardware | Local/Other | 30.000 |
11.888 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202716 | 11.32.07 | 2027 | FY27 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | 5307-Urban Formula | 60.000 |
11.888 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202716 | 11.32.07 | 2027 | FY27 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | KYTC Match/TDC | 7.500 |
11.888 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202716 | 11.32.07 | 2027 | FY27 Surveillance/Security Equipment | Boone, Campbell and Kenton | Surveillance/Security Equipment | Local | 7.500 |
11.890 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202720 | 30.09.00 | 2027 | FY27 Operating | Boone, Campbell and Kenton | Operating | Local/Other | 26.000.000 |
11.964 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202721 | 11.12.01 | 2027 | TANK Bus Replacements | Boone, Campbell, and Kenton counties | Bus Replacement with 4 full-size hybrid electric buses | Local | 788.164 |
11.964 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202721 | 11.12.01 | 2027 | TANK Bus Replacements | Boone, Campbell, and Kenton counties | Bus Replacement with 4 full-size hybrid electric buses | OKI-SNK | 3.152.655 |
12.725 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202802 | 11.7A.00 | 2028 | FY28 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | 5307-Urban Formula | 3.040.000 |
12.725 | Kentucky | Kenton | Transit Authority of Northern Kentucky | 202802 | 11.7A.00 | 2028 | FY28 Preventive Maintenance | Boone, Campbell and Kenton | Preventive Maintenance | Local | 760.000 |