Overview
Completed January 1997
Constructed in the early 1960s, Fort Washington Way is one of a few major highway connections bridging downtown Cincinnati’s east and west sides. When it opened, Fort Washington Way could safely accommodate 90,000 vehicles per day. As downtown businesses and entertainment venues began to grow and flourish, so too did traffic in and out of the city.
Up until July 1998, this major downtown artery was exceeding its original construction limit by supporting more than 120,000 vehicles each day. Heavy traffic congestion, dangerous weaves from nearby interstate off-ramps and pedestrian safety were quickly becoming problems during rush hour and times of special downtown events.
Fort Washington Way reconstruction began in 1995 when the City of Cincinnati asked the Ohio-Kentucky-Indiana Regional Council of Governments (OKI) to provide a solution. The reconstruction of Fort Washington Way became a sub-study of the OKI I-71 Corridor Transportation Study.
In January 1997, OKI produced a plan for the revamping of Fort Washington Way, and the City approved two months later. Parts of Fort Washington Way have gone from concept to design and into construction in a short amount of time.
Features of FWW 2000
Some features of FWW 2000 include the following:
- Increased number of lanes, while reducing the overall width of the highway
- Eight lanes of through, direct traffic for I-71 and U.S. Route 50
- A new Second Street and renovated Third Street as grand boulevard entrances into downtown Cincinnati
- Safer access ramps into downtown
- Increased number of lanes, while reducing the overall width of the highway
- Eight lanes of through, direct traffic for I-71 and U.S. Route 50
- A new Second Street and renovated Third Street as grand boulevard entrances into downtown Cincinnati
- Safer access ramps into downtown